Panduit CNLTD52A2 Installation Manual

Page 1
Duct System for a Cabinet Mounted Cisco 6504E (CNLTD52A2)
© Panduit Corp. 2012
INSTALLATION INSTRUCTIONS
CM514B
Rear of Cabinet
6504E Duct
(2) Duct Box
Front of Cabinet
Component Guide
For Technical Support: www.panduit.com/resources/install_maintain.asp
Page 1 of 6
(1) Doghouse/ Right Hand Bracket
Page 2
© Panduit Corp. 2012
INSTALLATION INSTRUCTIONS
CM514B
Determine Location of 6504E Duct (Part 1)
6504E Ducting requires (9) rack spaces for installation. 6504E Duct components are to be installed prior to switch installation and are designed not to support the switch.
NOTE: Front-to-back equipment rail depth must be set between 24.25” and 26.0”.
Dog House/ Left Hand Bracket
Front of Cabinet
Intended Mounting Locations. (9 rack spaces)
Duct box (2)
Rear of Cabinet
Intended Mounting Locations. (9 rack spaces)
Note: Duct must be installed below or above Middle Front to Back Beam.
Dog House/Right Hand Bracket
For Technical Support: www.panduit.com/resources/install_maintain.asp
Page 2 of 6
Page 3
© Panduit Corp. 2012
INSTALLATION INSTRUCTIONS
CM514B
Device Placement
Due to physical constraints posed by the front-to-back beams on the legacy Net-Access cabinet, there are cer­tain areas of the cabinet that the device cannot be mounted when used in conjunction with this inlet duct.
For new Net-Access switch cabinets (N***), there are no device keep-out areas. The only restriction on device is that 2 RU must be left open above and below the switch.
NOTE: Numbers-up RU numbering (#1 at bottom) assumed.
45 RU Net-Access CN*** Cabinet (Legacy)
Device KEEP-OUT
area - RU 42 - 45
Device can be installed
in RU 26-41
Device KEEP-OUT
area - RU 21 - 25
Device can be installed
in RU 5-20
42 RU Net-Access CN*** Cabinet (Legacy)
Device KEEP-OUT
area - RU 39 - 42
Device can be installed
in RU 26-38
Device KEEP-OUT
area - RU 21 - 25
Device can be installed
in RU 5-20
Device KEEP-OUT
area - RU 1 - 4
Device KEEP-OUT
area - RU 1 - 4
For Technical Support: www.panduit.com/resources/install_maintain.asp
Page 3 of 6
Page 4
© Panduit Corp. 2012
INSTALLATION INSTRUCTIONS
CM514B
Install Cage Nuts
Insert (4) cage nuts per equipment rail at 6504E component mounting locations (16 total cage nuts are to be installed). (1) grounding cage nut (green)
must be installed in each equipment rail. The view below depicts cage nut locations for (1) intended mounting location.
Intended Mounting Location
(9 rack spaces)
Cage Nuts
(installed)
For Technical Support: www.panduit.com/resources/install_maintain.asp
Page 4 of 6
Page 5
© Panduit Corp. 2012
INSTALLATION INSTRUCTIONS
CM514B
Left Hand Bracket Installation
Loosen the four nuts for the adjustment brackets and adjust the brackets to match the distance between the front and rear rails of the Server Cabinet. Align the Left Hand Bracket with the desired rack space, fasten the bracket using (4) #12-24 in the front rail and (4) in the rear rail. Tighten nuts on adjustment rail to lock in place.
-Repeat previous steps for Right hand bracket.
Rear of Cabinet
#12-24 screw (4)
Left Hand Bracket
Adjustment Brackets
#12-24 screw (4)
Front of Cabinet
#12-24 screw (4)
Front of Cabinet
Adjustment Brackets
Rear of Cabinet
#12-24 screw (4) Note: Green Grounding Screw must go in Green Grounding Cage Nut.
Right hand bracket
For Technical Support: www.panduit.com/resources/install_maintain.asp
Page 5 of 6
Page 6
© Panduit Corp. 2012
INSTALLATION INSTRUCTIONS
Duct Box Installation
Insert lower duct box into Left Hand Bracket and Right Hand Bracket by sliding duct box along the lower flange. Push in until stop has reached, secure box with (4) #12-24 and (4) #12 external tooth lock washer.
-Repeat previous steps for upper duct box.
(4) #12 External Tooth Lock Washers
Rear of cabinet
Upper duct box
(4) #12-24 Screws
CM514B
Front of cabinet
For Instructions in Local Languages
and Technical Support:
www.panduit.com/resources/install_maintain.asp
www.panduit.com
Page 6 of 6