Day 1 - Side-mounted Transitional Ducting Installation
Adjust Side Duct with Support Rail Assemblies
Adjust LEFT and RIGHT side duct with support rail assemblies to match cabinet equipment rail span. Loosen (2) 5/16” serrated flange lock nuts
per assembly using 1/2” socket wrench. Retighten (2) 5/16” nuts per assembly to 12 ft.-lbs. torque so that the nuts scrape paint to allow for
proper grounding.
Install adjusted LEFT and RIGHT side ducts with support rail assemblies in cabinet in rack space directly below intended switch location. Attach
each assembly to cabinet equipment rail with (1) #12-24 Phillips screw and (1) hex head grounding screw (green) using 5/16” socket wrench.
(1) hex head grounding (green)
(use 5/16” socket wrench)
(1) #12-24 Phillips Screw
(1) hex head grounding (green)
(use 5/16” socket wrench)
LEFT Side Duct
with Support Rail
FRONT OF CABINET
(1) #12-24 Phillips Screw
RIGHT Side Duct
with Support Rail
(installed)
For Technical Support: www.panduit.com/resources/install_maintain.asp
Orient inlet duct with perforations facing front of cabinet. Slide inlet duct into position between LEFT and RIGHT side duct with support rail
assemblies in rack space immediately below intended switch location. Slide inlet duct until rear of duct rests against side rail flanges. Attach
rear of inlet duct to LEFT and RIGHT side duct assemblies at rear of cabinet with (2) #10-32 Phillips pan head screws and (2) #10 lockwashers.
Tighten #10-32 screws to 35 in.-lbs. so that the lockwashers scrape paint to allow for proper grounding.
Perforated Face
Inlet Duct
Inlet Duct
Bottom of Inlet Duct
(indicated by presence of rivets)
FRONT OF CABINET
(faces cold aisle)
See detail view
Side Rail
Flange
Rear of
Inlet Duct
Rear of
Inlet Duct
REAR OF
CABINET
#10-32 Phillips Pan
Head Screws and
#10 Lockwashers
For Technical Support: www.panduit.com/resources/install_maintain.asp
Page 4 of 6
#10-32 Phillips Pan
Head Screws and
#10 Lockwashers
(2 places)
Remove (4) #12-24 screws fastening side-mounted transitional ducting assemblies to rear equipment rails of cabinet while supporting bottom of
CDE1 assembly. Position D-ring cable manager in rear rack space immediately below switch overlaying hinged mounting flaps of side duct with
support rail assemblies. Attach to cabinet equipment rails with (1) #12-24 Phillips screw and (1) hex head grounding screw (green) per rail.
REAR OF
CABINET
Support bottom of
CDE1 assembly
Remove (4) #12-24 Screws
[(2) Phillips and (2) Hex Head]
For Instructions in Local Languages
and Technical Support:
www.panduit.com/resources/install_maintain.asp
www.panduit.com
REAR OF
CABINET
D-Ring Cable
Manager
(4) #12-24 Screws
[(2) Phillips and (2) hex
head grounding (green)]
E-mail:
techsupport@panduit.com
Phone:
866-405-6654
Page 6 of 6
Loading...
+ hidden pages
You need points to download manuals.
1 point = 1 manual.
You can buy points or you can get point for every manual you upload.