1 Accessories 3
2 Location of Controls
3 Precaution of Laser Diode
4 Handling Precautions for Traverse Deck
4.1. Handling of traverse deck (optical pick-up)
4.2. Caution when replacing traverse deck
4.3. Grounding for electrostatic breakdown prevention
5 Operation Checks and Component Replacement Procedures
5.1. Checking for the P.C.B.
5.2. Replacement for the CD lid unit, shaft plate, spring A and
spring B
5.3. Replacement for the traverse motor and optical pick-up
5.4. Replacement for the rest switch
5.5. Replacement for the spindle motor
6 Display of Self-Diagnostic Function
7 Checking the Operation Problems on the Traverse Deck
(Optical Pick-up)
7.1. Check the operations described below on the traverse
deck after replacing
8 Automatic Adjustment Results Display Function (Self-Check
3
4
5
5
5
5
6
6
8
9
10
10
11
12
12
Function)
8.1. How to display automatic adjustment results
8.2. Display of automatic adjustment results (Self-Check
Function)
9 Type Illustration of ICs, Transistors and Diodes
10 Schematic Diagram Notes
11 Schematic Diagram
12 Printed Circuit Board and Wiring Connectio n Diagram
13 Block Diagram
14 Terminal Function of ICs
14.1. IC301(C2BBGF000650): System Control
14.2. IC501(MN6627961JA): Servo Amp, Servo Processor,
Digital Signal Processor, Digital Filter & D/A Converter
15 Supply of Rechargeable Battery as Replaceme nt Parts
16 Caution in use of Rechargeable Battery
17 Replacement Parts List
18 Cabinet Parts Location
19 Traverse Unit Parts Location
20 Packaging
The laser diode in the traverse deck (optical pick-up) may break
down due to potential difference caused by static electricity of
clothes or human body.
So, be careful of electrostatic breakdown during repair of the
traverse deck (optical pick-up).
4.1. Handling of traverse deck
(optical pick-up)
1. Do not subject the optical pick-up to static electricity as it is
extremely sensitive to electrical shock.
2. To protect the laser diode against electrostatic breakdown,
be sure that the short land of the flexible board (FFC board)
should be short-circuit by solder before pulling out the FFC.
Then inserting a short pin or similar object into the tip of the
flexible board.
(Refer to Fig. 4-1.)
3. Take care not toapply excessive stress to the flexible board
(FFC board).
4. Do not turn the variable resistor (laser power adjustment). It
has already been adjusted. (Refer to Fig. 4-1.)
4.2. Caution when replacing
traverse deck
The new traverse deck short-circuits by the short pin, the foil
(B) and short lands to protect the laser diode against
electrostatic breakdown. Be sure to replace to new one
following procedures.
1. Remove the short pin from the FFC, and then connect it to
the connector.
2. Cut the foil (B). (Refer to Fig. 4-1.) (Take care not to make
contact with cutting point each other.)
3. Unsolder the short lands. (Refer to Fig. 4-1.)
4.3. Grounding for electrostatic
breakdown prevention
4.3.1. Human body grounding
Use the anti-static wrist strap to discharge the static electricity
from your body. (Refer to Fig. 4-2.)
Fig. 4-1.
Fig. 4-2.
4.3.2. Work table grounding
Put a conductive material (sheet) or steel sheet on the area
where the traverse deck (optical pick-up) is placed, and ground
the sheet. (Refer to Fig. 4-3.)
Fig. 4-3.
Caution:
The static electricity of your clothes will not be grounded
through the wrist strap.
So take care not to let your clothes touch the traverse deck
(optical pick-up).
5
SL-CT820EB / SL-CT820EE / SL-CT820EG
5 Operation Checks and Component Replacement
Procedures
· This section describes procedures for checking the
operation of the major printed circuit boards and
replacing the main components.
· For reassembly after operation checks or replacement,
reverse the respective procedures. Special reassembly
procedures are described only when required.
5.1. Checking for the P.C.B.
5.1.1. Checking for the P.C.B. (A side)
· Check the P.C.B. (A side) as shown below.
6
SL-CT820EB / SL-CT820EE / SL-CT820EG
5.1.2. Checking for the P.C.B. (B side)
·Follow the (Step 1) - (Step 5) of item 5.1.1.
·Check the P.C.B. (B side) as shown below.
7
SL-CT820EB / SL-CT820EE / SL-CT820EG
5.2. Replacement for the CD lid
unit, shaft plate, spring A and
spring B
8
5.3. Replacement for the traverse
motor and optical pick-up
SL-CT820EB / SL-CT820EE / SL-CT820EG
· Follow the (Step 1) - (Step 4) of item 5.1.1.
9
SL-CT820EB / SL-CT820EE / SL-CT820EG
5.4. Replacement for the rest
switch
·Follow the (Step 1) - (Step 4) of item 5.1.1.
·Follow the (Step 1) , (Step 2) of item 5.3.
5.5. Replacement for the spindle
motor
·Follow the (Step 1) - (Step 4) of item 5.1.1.
·Follow the (Step 1) , (Step 2) of item 5.3.
10
Loading...
+ 21 hidden pages
You need points to download manuals.
1 point = 1 manual.
You can buy points or you can get point for every manual you upload.