- Rechargeable battery with carrying case............1pc.
(RFKFBP140HSY)
For GH area
- Rechargeable battery with carrying case............1pc.
(RP-BP61GY-S)
4
3. Location of Controls
4. Handling Precautions for Traverse Deck
(Mechanism Unit)
The laser diode in the mechanism unit (optical pickup) may break down due to
potential difference caused by static electricity of clothes or human body.So, be
careful of electrostatic breakdown during repair of the mechanism unit (optical
pickup).
4.1. Mechainsm Unit (optical pickup)
1. Do not subject the mechanism unit (optical pickup) to static electricity as it is
extremely sensitive to electrical shock.
2. Before removing the mechanism unit (optical pickup), the short land on the
flexible board is shorted with a solder build-up to prevent damage to the laser
diode. (As shown in Fig.1.)
3. It is a posibility to disconnect if it applies over pressures to the flexible
P.C.B., as take care of handling the flexible P.C.B..
Fig.1
5
4.2. Caution for Replacement of Mechanism Unit (Optical
Pickup)
If you remove the flexible P.C.B. of the optical pickup from the connector of
main P.C.B., perform it after shorting with a solder build-up the short land to
protect the breaking down by static electricity.
The optical pickup that is supplied as replacement parts is shorted with a solder
build-up the short-land of flexible P.C.B. to protect the breaking down by static
electricity.
After connecting the flexible P.C.B. of the optical pickup to the connector of
main P.C.B., remove the solder build-up on the short-land and confirm that is
opened. (As shown in Fig.1)
4.3. Grounding for electrostatic breakdown prevention
1. Human body grounding
Use the anti-static wrist strap to discharge the static electricity from your
6
body. (As shown in Fig.2.)
2. Work table grounding
Put a conductive material (sheet) or steel sheet on the area where the optical
pickup is placed, and ground the sheet. (As shown in Fig.3)
Caution:
The static electricity of your clothes will not be grounded through the wrist
strap. So, take care not to let your clothes touch the traverse deck (optical
pickup).
Fig.2
Fig.3
7
5. Operation Checks and Component Replacement
Procedures
- This section describes procedures for checking the operation of the major
printed circuit boards and replaceing the main components.
- For reassembly after operation checks or replacement, reverse the respective
procedures. Special reassembly procedures are described only when
required.
- After replacing the main components (optical pickup or traverse motor, etc.)
of mechanism unit block, change to the adjust mode, and then perform the
“ROM/RAM auto-adjustment”.
5.1. Checking for the P.C.B.
5.1.1. Checking for the P.C.B. (A side)
8
9
- Check the P.C.B. (A side) as shown below.
5.1.2. Checking for the P.C.B. (B side)
10
- To check the IC501 on side B of P.C.B., refer to the table 1 and illustration
below.
11
12
5.2. Replacement for the intermediate cabinet
- Follow the (Step 1) - (Step 3) of item 5.1.1.
1314151617
18
5.3. Replacement for the disc cover ass'y
- Follow the (Step 1) - (Step 3) of item 5.1.1.
- Follow the (Step 1) - (Step 4) of item 5.2.
19
20
5.4. Replacement for the traverse motor
- Follow the (Step 1) - (Step 3) of item 5.1.1.
212223
Loading...
+ 46 hidden pages
You need points to download manuals.
1 point = 1 manual.
You can buy points or you can get point for every manual you upload.