Panasonic NA-F65B2, NA-F70B2, NA-F72B2, NA-F852B, NA-F902B Service Manual

Service Manual
Fully Automatic Washing Machine
© Panasonic Appliances (Thailand) Co., Ltd. 2012. All rights reserved. Unauthorized copying and distribution is a violation of law.
(Revision : Mar. 2013)
Order No. PHAT100404C3
Grey, White
Destination
Thailand, Vietnam, Indonesia,
Singapore (DBD), Malaysia, RBD,
India, UAE (AFP), Oman,
Kuwait, Qatar, UAE (PGF),
Philippines,
NA-F65B2 NA-F70B2 NA-F72B2 NA-F852B NA-F902B
There are special components used in this equipment which are important for safety. These parts are marked by in the Schematic Diagrams, Circuit Board Diagrams, Exploded Views and Replacement Parts List. It is essential that these
This service information is designed for experienced repair technicians only and is not designed for use by the general public. It does not contain warnings or cautions to advise non-technical individuals of potential dangers in attempting to service a product. Products powered by electricity should be serviced or repaired only by experienced professional technicians. Any attempt to service or repair the product or products dealt within this service information by anyone else could result in serious injury or death.
critical parts should be replaced with manufacturer’s specified parts to prevent shock, fire or other hazards. Do not modify the original design without permission of manufacturer.
WARNING
IMPORTANT SAFETY NOTICE
– 2 –
CONTENT
NA-F65B2 / F70B2 / F72B2 / F852B / F902B
Page
3 4
5 6
7 8 8 8
9 10 11
12
13 - 14
15 16 17 18 19 20 21 22 23
1. Attention in the repair work security
2. Specification
3. Features and Technical Information
3.1 Function Control with Fuzzy sensor
3.2 Power consumption and Current
4. Installation
4.1 Checking of placement
4.2 Connect the water supply hose
4.3 Install washing machine to steady
4.4 Child Lock program
5. Operations Panel
6. Wiring Diagram
7. Table of Errors
8. Troubleshooting
8.1 Table of troubleshooting
8.2 Symptoms are not trouble
9. Parts Exploded View and Replacement Parts List
9.1 Part Exploded View : Part A
9.2 Replacement Parts List : Part A
9.3 Part Exploded View : Part B
9.4 Replacement Parts List : Part B
9.5 Part Exploded View : Part C
9.6 Replacement Parts List : Part C
9.7 Part Exploded View : Packing
9.8 Replacement Parts List : Packing
10. Detail Change Notice
– 3 –
NA-F65B2 / F70B2 / F72B2 / F852B / F902B
1. ATTENTION IN THE REPAIR WORK RECURITY
Please wear gloves when disassembling, replacing and assembling.
Always wear gloves to prevent an injury by the metal end face or an electric shock at the time of the electricity service.
Please be careful to the edges of the metal end face.
Wear the working clothes of long sleeves to prevent an injury by the metal end face or please work after covering the end face with tape or towel.
Rebuilding is prohibited.
Do not rebuild machine parts and components when repairing service. It may be the cause of damage or ignition.
Straightly pull out or insert in huasuton terminal. Do not twist it. It may be the cause of damage or ignition.
Be sure to use specified parts. Always use specified parts for the parts with mark in the electric circuit diagrams and parts list. It may be the cause of smoke, ignition or damage.
Do not touch any rotating object with hand unless it stops completely.
Slow rotation may also roll in your hands and cause injury.
Be careful about receiving an electric shock. When doing electric connection service such as voltage measurement, please be careful enough about receiving an electric shock at electric charging parts and cable terminal parts.
Pull out electric plug when doing repair work. Disassembling, assembling and replacing parts should be done after pulling out electric plug. Receiving an electric shock or getting an injury may occur.
In order to prevent any accident during repair work and ensure security of the product after repair work, somethings surely followed are explained below.
Connection of cables should be done according to regular work.
• Connection of cables should be tightened reliably with strength using solderless terminal. (specified parts always using regular bonding plier)
• Install a fire protection cover (fireproof) covering connection area completely, and close opening area by tape. (Please reuse the fire protection cover which came with the product.)
• When drawing cables around, fixing those cables with cable suppression part. Do not touch rotating part, high temperature part and surface of metal.
• Be sure to replace with cable unit when any cable was snapped. When a part of the cable unit was cut you must not do the connection repair. It may be the cause of smoke, ignition or receiving an electric shock.
Types of the contents being followed are classified by following figured symbols and explained. (The following is an example of expression in pictures.)
Warning
Attention
Warning
Attention
This figured symbol means caution "Attention".
This figured symbol means must not do "Prohibition".
This figured symbol means surely execute "Instructions".
The level of the arised damages or dangers, when indicated contents are ignored, are classified by following indications and explained.
The content in the column of this indication is "Be assumed that possibly die or get seriously injured".
The content in the column of this indication is "Be assumed that possibly get damages or possibly only damaged object occured".
– 4 –
NA-F65B2 / F70B2 / F72B2 / F852B / F902B
2. SPECIFICATION
Rate Voltage and Frequency
Thailand,
Vietnam,
UAE (PFG),
Singapore (RBD)
Thailand,
Vietnam,
UAE (PGF),
Singapore (RBD)
Vietnam220V/50Hz
Malaysia, Oman,
UAE (AFP),
Qatar, Kuwait.
Malaysia, Oman,
UAE (AFP),
Qatar, Kuwait.
240V/50Hz
NA-F72B2NA-F65B2 NA-F70B2 NA-F852B
Indonesia Indonesia
Rate Power Consumption (Wash / Spin)
400/205W 400/205W 400/220W
---
---
---
---
---
---
---
220V/50Hz
410/225W 410/225W230V/50Hz
460/282W 460/282W230V/60Hz
420/240W 420/240W240V/50Hz
400/205W 400/205W
Thailand,
Vietnam,
Philippines,
Singapore (RBD),
Malaysia, India.
Thailand,
Vietnam,
Philippines,
Singapore (RBD),
Sinapore (DBD),
Malaysia, India.
VietnamGrey
UAE (AFP),
(UAE (PGF),
Kuwait, Oman,
Qatar.
UAE (AFP),
(UAE (PGF),
Kuwait, Oman,
Qatar.
White
Indonesia Indonesia
India Singapore (RBD),
India
230V/50Hz
Philippines Philippines230V/60Hz
NA-F902B
Colour
520 mm. x 540 mm. x 650 mm.Body
563 mm. x 560 mm. x 945 mm.Installation
Outer Dimension
Model
Standard Capacity
6.5 Kg 7.0 Kg 7.2 KgWash 6.5 Kg 7.0 Kg
6.5 Kg 7.0 Kg 7.2 KgSpin 6.5 Kg 7.0 Kg
Standard Water Consumption 110 Liter 130 Liter 130 Liter 110 Liter 130 Liter
Weight with Accessories 31 Kg 31 Kg 31 Kg 31 Kg 31 Kg
Weight with Packing 35 Kg 35 Kg 35 Kg 35 Kg 35 Kg
0.03 to 1MPa (0.3 to 10 Kgf / cm
2
Water Supply Pressure
– 5 –
NA-F65B2 / F70B2 / F72B2 / F852B / F902B
3.1 Function Control with Fuzzy sensor
Clothes quantity checking, wash level indication and detergent consumption indication with Fuzzy Logic System.
1. Check clothes quantity and specify the amount of detergent
1. Wash timer and spin timer with checked clothes quantity
2. Additional wash timer and spin timer as temperature increases
<Motor status>
Turn Switch “ON”
Press “Start” button
1. Check clothes quantity
2. Check ambient temperature
A. Check clothes quantity B. Control wash time C. Control spin time
Supply water to a proper level
WASH
RINSE
SPIN
Switch will automatically cut the power current “OFF”
Spintimer +0 min. +1 min. +2 min. +0 min.
Wash Timer +0 min. +2 min. +3 min. -1 min.
External temp. 25°C 15°C 5°C 30°C
High
3.0 Kg and more
Medium
1.2 Kg~3.0 Kg
Low
0 Kg~1.2 Kg
Wash Timer 12 min. 12 min. 9 min.
Spin Timer 6 min. 6 min. 5 min.
2. Temperature checking
Check temperature in the atmosphere when the machine starts. In case of low temperature, wash timer and spin timer are extended automatically so that washed clothes are as clean as washing in high temperature.
<Checking Method> Check cross pressure at the capacitor while the Pulsator operates without water.
Rotate clockwise
stop
Rotate anti-clockwize
stop
Rotate clockwise
stop
Rotate anti-clockwize
stop
Rotate clockwise
stop
Rotate anti-clockwize
stop
3. FEATURES AND TECHNICAL INFORMATION
– 6 –
NA-F65B2 / F70B2 / F72B2 / F852B / F902B
The following requirements shall be met in accordance with Product Standard.
Noted : Starting motor and convert based on duty ratio of water flow for that period.
Noted : Starting motor and convert based on duty ratio of water flow for that period.
(1) Washing
3.2
Power consumption and current
(2) Spinning
Voltage Frequency
220V 50Hz
230V 50Hz
240V 50Hz
230V 60Hz
Power source
Current (A)
Power consumption
(W)
Current (A)
Power consumption
(W)
Current (A)
Power consumption
(W)
Current (A)
Power consumption
(W)
Water load Rated load
1.28 - 2.02
257 - 360
1.30 - 2.04
266 - 371
1.26 - 1.99
275 - 372
1.52 - 2.37
310 - 426
1.78 - 2.22
357 - 440
1.80 - 2.24
366 - 451
1.76 - 2.19
375 - 462
2.02 - 2.57
410 - 506
Voltage Frequency
220V 50Hz
230V 50Hz
240V 50Hz
230V 60Hz
Power source
Current (A)
Power consumption
(W)
Current (A)
Power consumption
(W)
Current (A)
Power consumption
(W)
Current (A)
Power consumption
(W)
Water load Rated load
0.72 - 1.02
168 - 225
0.78 - 1.10
185 - 247
0.78 - 1.11
199 - 264
1.10 - 1.50
236 - 310
0.82 - 1.02
183 - 225
0.80 - 1.10
200 - 247
0.88 - 1.11
214 - 264
1.20 - 1.50
251 - 310
– 7 –
NA-F65B2 / F70B2 / F72B2 / F852B / F902B
4.1 Checking of placement
4. INSTALLATION
Water Supply
Hose
Drain hose
Connect the water supply hose to the water supply valve screw.
[Cautions]
Hose extension
Elbow
Water supply valve screw
Nut
If extended external part is necessary when connecting the drain hose, the length of the drain hose should be less than 3 m and the height should be below 10 cm.
3 m max.
Do not put hose tip under the water
Over 10 cm
Install the machine 10 cm or more away from the wall.
Good Example
Below 10 cm
1. Push the water supply hose nut straights onto the water supply valve screw.
2. Hold the elbow by lifting it up, screw the nut onto the water supply valve screw, and firmly tighten the nut.
3. After the nut is tightened, check whether or not the elbow is unsteady or loose.
4. After tightening, open the faucet to confirm that there is no water leakage.
Firmly tighten the nut, otherwise water leakage will result.
Water Pressure Rating :
2.9 x 10 ~ 9.8 x 10 Pa
45
Loading...
+ 16 hidden pages