![](/html/a8/a873/a87358edbb93cf961dd9e2a8c8976cfaa3ef3a7e7764035bb67ff4196a9299a3/bg1.png)
pg. 1
BOLA
DISC / FELT
120/240V ASSEMBLY & INSTALLATION INSTRUCTIONS
INFO@PABLODESIGNS.COM
888 MARIN STREET
SAN FRANCISCO, CA
94124
PABLODESIGNS.COM
![](/html/a8/a873/a87358edbb93cf961dd9e2a8c8976cfaa3ef3a7e7764035bb67ff4196a9299a3/bg2.png)
pg. 2
120/240V ASSEMBLY INSTRUCTIONS
BOLA CANOPY
1. ATTACH MOUNTING PLATE TO JUNCTION BOX OR CEILING
2. WIRE TRANSFORMER TO BUILDING
(US: BLACK TO BLACK AND WHITE TO WHITE)
( EU: BLUE TO BLACK AND BROWN TO RED)
3. CUT CORD TO DESIRED LENGTH AND PASS THROUGH
CANOPY. WIRE TRANSFORMER TO LAMP
(US: BLUE TO BRAIDED AND RED TO RED)
(EU: BLACK TO BRAIDED AND RED TO RED)
4. TIGHTEN SET SCREWS ON CORD RELIEF
5. BRING CANOPY UP TO MOUNTING PLATE WITH BOLTS
PASSING THROUGH THE HOLES
6. SCREW BOTH CAPS DOWN, SECURING THE CANOPY
IMPORTANT: WE RECOMMEND CEILING MOUNTING
BE INSTALLED BY AN ELECTRICIAN
LENGTH OF CORD SUPPLIED
10FT (305 CM)
2
3
4
6
5
2
1
RED