OutBack Power GSLC175-AC-120, GSLC175-AC-240 Quick Start Manual

Components
900-0155-01-00 Rev B.vsd\Page-1\2013-06-10 ©2013 OutBack Power Technologies. All Rights Reserved.
Contact Technical Support:
Telephone: +1.360.618.4363 Email: Support@outbackpower.com Website: www.outbackpower.com
IMPORTANT:
life support equipment.
Optional OutBack Components
System Display MATE3
Radian System Products
Major Components
GSLC175-AC-120/240
PV and Grid-Tied
Inverter
GS Load Center
GSLC175-AC-120/240
Inverter/Charger GS8048
FLEXnet DC Monitor (FN-DC)
Communications
Manager
HUB10.3 HUB10 HUB4
Battery Bank
Vented Battery Enclosure
MATE3 System
Display and
Controller
GS8048 Inverter/Charger
GS Load Center
(GSLC)
MATE3 uses FW-MB3 mounting bracket MATE3 requires revision 002.015.xxx or higher
AC Sources
Utility Grid (required) AC Generator (optional)
Main Electrical Panel Electrical Distribution Subpanel
(Protected Load Panel)
Battery Bank
Photovoltaic (PV) Array
Customer-Supplied Components
Grid-Tied Inverter, 120/240 Vac
Includes Remote Temperature Sensor (RTS)
De-energize/Shutdown Procedures
Functional Test Points
Battery Voltage Test Points
AC OUT Voltage Test Points
(Terminal bus bar = TBB)
1a 1b 1c 1d
3a 3b 2c
2a 2b 2c
Grid-Tie Inverter Test Points
2a
2b
2c
1
2
1
1b
1c 1d
3a
3b
To de-energize or shut down the AC-coupled system:
1. Turn off (open) the AC circuit breakers.
2. Turn off (open) the DC circuit breakers for the battery. Wait 5 minutes for the inverter to internally discharge itself.
3. Verify 0 Vdc on the first DC bus of the inverter by placing the voltmeter leads on and .
4. Verify 0 Vdc on the second DC bus by placing the voltmeter leads on
and .
5. Ve rify 0 Vac on the AC output circuit breakers by placing the voltmeter leads on and . Repeat this step for and .
6. Verify 0 Vac on the grid-tied inverter terminals and (with neutral terminal ) .
1
2
1b
WARNING: Lethal Voltage
Review the system configuration to identify all possible sources of energy. Ensure ALL sources of power are disconnected before performing any installation or maintenance on this equipment. Confirm that the terminals are de-energized using a validated voltmeter (rated for a minimum 1000 Vac and 1000 Vdc) to verify the de-energized condition.
WARNING: Lethal Voltage
The numbered steps will remove power from the inverters. However, sources of energy may still be present inside the GSLC and other locations. To ensure absolute safety, disconnect ALL power connections at the source.
WARNING: Burn Hazard
Internal parts can become hot during operation. Do not remove the cover during operation or touch any internal parts. Be sure to allow them sufficient time to cool down before attempting to perform any product maintenance.
1c
1b 1d
2a 2c 2b 2c
3a 3b
2c
AC-Coupled Application
5. Secure the inverter to the surface using a minimum of 1 wall screw (or other appropriate hardware).
6. Follow the instructions for installing the GS Load Center.
7. Follow the instructions for installing the bracket for the MATE3.
8. Follow appropriate instructions for installing the PV array and grid-tied inverter (if not already present).
Wire Sizes & Torque
Control Wiring Terminal Block:
The 12V AUX and RELAY AUX terminals are used to control the devices which disconnect the grid-tied inverter (the ROCB and the relays). These devices can also automatically start a generator if one is present.
Mounting
WARNING: Fire/Explosion Hazard
Do not place combustible or flammable materials within 12 feet (3.7 m) of the equipment. This unit employs mechanical relays and is not ignition-protected. Fumes or spills from flammable materials could be ignited by sparks.
WARNING: Personal Injury
Use safe lifting techniques and standard safety equipment when working with this equipment.
IMPORTANT:
Clearance and access requirements may vary by location. Maintaining a 36” (91.4 cm) clear space in front of the system for access is recommended. Consult local electric code to confirm clearance and access requirements for the specific location.
Radian Dimensions (includes MATE3):
29.1" (85 cm) tall X 23.9" (60.6 cm) wide
900-0155-01-00 Rev B.vsd\Page-2\2013-06-10 ©2013 OutBack Power Technologies. All Rights Reserved.
Torque Requirements
Circuit Breaker Stud
Torque
In-lb Nm
M8 20 2.3
¼ - 20 35 4.0
5/16 - 18 50 5.6
3/8 - 16 225 25.4
AC Wire Sizes and Torque Values
It is recommended that conductors be #6 AWG
THHN copper, or larger, rated to 75°C
(minimum) unless local code requires otherwise.
AWG In-lb
#14 - 10 20
#8 25
#6 - 4 35
#3 35 #2 40 #1 50
1/0 50
mm
2
2.5 – 6 10
16 – 25
35 35 50 70
Nm
2.3
2.8
4.0
4.0
4.5
5.6
5.6
Wire Size Torque
Radian Mounting:
1. Ensure the mounting surface is strong enough to handle 3 times the total weight of all the components. Add a piece of plywood if necessary to strengthen the surface.
2. Attach the wall bracket to the surface centering the mounting holes on the sides with the wall studs. Use all 6 mounting screws to secure the bracket.
3. Lift the inverter so that the inverter bracket is above the wall bracket.
4. Lower the inverter into place so that the inverter bracket slips into the wall bracket.
1
3
4
6
GSLC175-AC-120/240
N E U
L1 L2 GRID
L1 L2 GEN
N E U
N E U
L1 L2
OUT
RELAY AUX
+ ­12V AUX
Switch INV
Remote
Battery Temp
Minimum DC Cable based on the
DC Circuit Breaker
Torque
In-lb Nm
50 5.6 225 25.4 225 25.4
DC
Circuit
Breaker
Cable Size
125 1/0 (70 mm2) 175 2/0 (70 mm2) 250 4/0 (120 mm2)
35 4.080 #4 AWG (25 mm2)
35 4.060 #6 AWG (16 mm2)
MATE3
GS8048
GSLC
1
2 2
3
4
5
7
8
8
9
6
ON/OFF
INV
9
Plywood
(Optional)
Wall Board
Wall
Bracket
Wall Stud
Side View
Inverter Bracket
16" (40.6 cm)
Plywood (Optional)
Wall Board
Wall Stud
Wall Bracket
Wall Stud
1
2
2
3
4
5
5
6
7 8
8
1011121314
15
16
17
18
19
20
21
Radian Series
Inverter/Charger
MATE3
Mounting
Bracket
MATE3
GS Load Center
7
Shunt
Bolt 3/8"
Lock Washer
Flat Washer
Battery Negative (–) Lug
Negative Battery Cable Connections
DC Plates
3/8 - 16 225 25.4Upper holes (+) 60 6.8 3/8 - 16 225 25.4Lower holes (+) 225 25.4 3/8 - 16 225 25.4Shunt Bolts (–) 60 6.8
Lower holes (+) 50 5.6
CAUTION: Equipment Damage
When connecting cables from the inverter to the battery terminals, ensure the proper polarity is observed. Connecting the cables incorrectly can damage or destroy the equipment and void the product warranty.
!
PV and Grid-Tied
Inverter
Battery Negative (–) Lug
AC Circuit Breakers
1 2 3 4
DC Terminals - Inverter
AC Terminals - Inverter
5
DC Circuit Breakers
6 7
8
Mechanical Interlock (Bypass)
9
10
Communication Ports Auxiliary Terminals
11 12 13 14 15
AC OUT Bus Bar L1
16 17 18 19
AC OUT Bus Bar L2 GRID IN Bus Bar L1 GRID IN Bus Bar L2 GEN IN Bus Bar L1 GEN IN Bus Bar L2 AC Neutral Ground
20
DC Positive (+) Plate DC Negative (–) Bus Bar
Remote Operated Circuit Breaker (ROCB)
Grid-Tied Inverter Bus Bar L1
Relays
21
Grid-Tied Inverter Bus Bar L2
Bolt 3/8"
DC Positive (+)
Plate
Battery Positive (+) Lug
Flat Washer
Positive Battery Cable Connections
Nut
Lock Washer
Flat Washer
18
Loading...
+ 2 hidden pages