2 LG Piston Pump
6.1.1 Checking the surrounding conditions............................................................................18
6.1.2 Preparing the installation location.................................................................................18
6.1.3 Preparing the base surface and foundations.................................................................18
6.2 Installation ..........................................................................................................................18
6.2.1 Installing the pump.......................................................................................................18
6.2.2 Electrical connection ....................................................................................................19
6.2.3 Water connection.........................................................................................................19
6.2.4 Assembling the piston pump with additional pressurized container ...............................20
6.3 Installation ..........................................................................................................................21
6.3.1 Installing the V-belt.......................................................................................................21
6.3.2 Belt guard ....................................................................................................................22
6.3.3 Installing the snifter valve .............................................................................................24
7 COMMISSIONING/ DECOMMISSIONING ................................................................................25
7.1 Preparing for commissioning...............................................................................................25
7.1.1 Determining the pump configuration.............................................................................25
7.1.2 Filling the drive casing with oil ......................................................................................25
7.2 Commissioning ...................................................................................................................26
7.2.1 Filling the pump............................................................................................................26
7.2.2 Checking direction of rotation .......................................................................................27
7.2.3 Starting the piston pump ..............................................................................................27
7.3 Decommissioning................................................................................................................29
7.4 Recommissioning................................................................................................................30
8 MAINTENANCE AND REPAIR..................................................................................................32
8.1 Maintenance.......................................................................................................................32
8.1.1 Oil level........................................................................................................................32
8.1.2 V-belt...........................................................................................................................33
8.1.3 Adding air ....................................................................................................................33
8.1.4 Stuffing box..................................................................................................................34
8.2 Maintenance service ...........................................................................................................34
8.2.1 Oil change....................................................................................................................35
8.2.2 Sending the pump to the manufacturer.........................................................................35
8.3 Safety valve........................................................................................................................35
9 FAULTS AND TROUBLESHOOTING........................................................................................37
10 APPENDIX.............................................................................................................................39
10.1 Service, spare parts, accessories ....................................................................................39
10.2 Individual parts of the LG piston pump.............................................................................40
10.3 Motor assembly...............................................................................................................44
10.4 Declaration of Conformity as per EC Directive 2006/42/EC, Annex IIA .............................46
10.5 Clearance Certificate.......................................................................................................47