Oracle Storage 6180 Array, Sun Storage 6180 Array Getting Started Manual

Page 1
Sun Storage 6180 Array
Getting Started Guide
This guide provides an overview of the hardware installation process for Oracle’s Sun Storage 6180 array. For detailed information, have the Sun Storage 6180 Array Hardware Installation Guide available as you go through the steps in this document.
Additional documentation is listed in the section “Documentation for This Product” and available at the Oracle documentation web site:
http://www.oracle.com/technetwork/indexes/documentation/index.html
Review Ship Kit Contents
Controller Tray Ship Kit
1. Documentation 5. Two Fibre Channel (FC) cables
2. Four or Eight Small Form-factor Pluggables (SFPs) 6. Two PS2 6-pin DIN to RJ45 serial cables (for service access)
3. Power cables
4. Two RJ45-RJ45 Ethernet cables
* AC power cables areshipped in a carton separate from the array unit. Although not pictured, DC power cables are included for DC units.
*
7. Two RJ45-DB9 serial adapters (one straight through and one null modem)
1
Page 2
Before You Begin
Prior to starting installation, record the media access control (MAC) address for each controller (located on labels affixed to the controller tray top and/or front), as MAC addresses are required during the installation and set-up process and may not be accessible after installation is complete. Then, review the following documents:
• Important Safety Information for Sun Hardware Systems • Sun Storage 6180 Array Site Preparation Guide
• Sun Storage 6180 Safety and Compliance Manual • Sun Storage 6180 Array Release Notes
Prepare the Rack
FIGURE 2 Install the PDUs and Rails
Step Task
1. Install the Sun Rack II as described in the Sun Rack II User’s Guide.
2. Install the PDUs in the Sun Rack II, as described in the
Sun Cabinet Power Distribution Unit (PDU) Installation Guide.
3. Install the rails for each tray in the Sun Rack II, as described in
the Sun Storage Modular Rail Kit Installation Guide.
Note: If you are using a cabinet other than the Sun Rack II, see the Installation Guide for universal rail kit installation instructions.
Install the Controller Tray and Expansion Trays
Each tray is installed in an empty 3RU slot in the cabinet. Consult the Installation Guide for further details.
FIGURE 3 Installing the Tray
Step Task
1. Using two people, carefully lift and rest the tray on the bottom ledge of the left and right rails. Caution: Tray equipment can weight up to 95 pounds.
2. Carefully slide the tray into the cabinet until the front mounting flanges on the tray touch the vertical face of the cabinet.
3. Install and tighten four screws (two per side, customer-supplied) to secure the tray to the cabinet front. Note: Screw size will depend on the specific rack used.
4. Install and tighten two 6-32 screws (one per side, customer-supplied) at the back of the tray to secure the back of the tray to the cabinet.
5. Verify that the controller power switches and cabinet circuit breakers are turned off. Then, connect each tray power supply to separate cabinet power sources.
2
Page 3
Review Controller Tray Front and Rear Panels
FIGURE 4 shows the locations of LEDs and components on the controller tray front panel. FIGURE 5 shows the
locations of ports and components on the controller tray rear panel.
FIGURE 4 Controller Tray Front Panel
Callout Description
1. Disk drives
2. Grounding strap connector
3. Rate select switch
4. Drive LEDs
5. Alarm cancel button
6. Tray LEDs
FIGURE 5 Controller Tray Rear Panel
Callout Description
1. Controller A
2. Battery backup compartment
3. Serial port (for diagnostics)
4. Ethernet management host ports
5. FC expansion ports
6. FC data host ports
7. ID/Diag display (Seven-segment readout)
8. Power supply A
9. Power supply B
10. Controller B
3
Page 4
Connect the Intertray Cables
FIGURE 6 shows a configuration consisting of one controller tray and four expansion trays. Other configurations
are supported, as described in the Installation Guide. Note: In the below figure, black cables represent Drive Channel 1 (Controller A), and green cables represent Drive Channel 2 (Controller B).
FIGURE 6 Connect the Controller Tray to the Expansion Trays
4
Page 5
Prepare Management Connections
FIGURE 7 shows the ports used for an out-of-band network connection to a management host. The following
procedure describes a management host LAN connection. Other connection options are described in the Installation Guide.
FIGURE 7 Management Host Connections
Step Task
1. Locate Ethernet port 1 for Controller A and Controller B at the back of the controller tray.
2. Connect an Ethernet cable to Ethernet port 1 of each controller.
3. Connect the other end of each Ethernet cable to the LAN on which your management host resides (preferably on the same subnet).
Note: To configure in-band array management, see the Installation Guide.
Connect the Data Hosts
You can connect data hosts to the Sun Storage 6180 Array through FC switches or directly. FIGURE 8 illustrates a connection through FC switches using a single host channel on each controller. More connection options are discussed in the Installation Guide.
FIGURE 8 Data Host Connections
Step Task
1. Verify that data host OS requirements are met and that host bus adapter (HBA) drivers and multipath software are installed on the data hosts, as listed in the Sun Storage 6180 Array Release Notes.
2. Locate the data host ports at the back of the controller tray and install an SFP into the Channel 1 port for each controller.
3. Connect each fiber-optic cable to the host ports of Controller A and Controller B.
4. Connect the other end of each cable to an external switch as shown in
5. Connect the cables from each switch to the HBAs for each data host.
FIGURE 8.
5
Page 6
Turn on Power and Install Management Host Software
1. Power on the array and configure controller IP addresses per the detailed information in the Installation Guide. Note: IP addresses are auto-configured via DHCP by default, but can be changed manually using each controller’s serial port (see
FIGURE 5).
2. Download Sun Storage Common Array Manager software and install on the management host, as described in the Sun Storage Common Array Manager Quick Start Guide.
Documentation for This Product
Additional documentation for the Sun Storage 6180 array is available at:
http://download.oracle.com/docs/cd/E19373-01/index.html
Documentation for the Sun Storage Common Array Manager software is available at:
http://www.oracle.com/technetwork/documentation/disk-device-194280.html
Review safety information Important Safety Information for Sun Hardware Systems
Sun Storage 6180 Safety and Compliance Manual
Review known issues and workarounds Sun Storage 6180 Array Release Notes
Prepare the site Sun Storage 6180 Array Site Preparation Guide
Install the cabinet
Install the rails for each tray Sun Storage Modular Rail Kit Installation Guide
Install the power distribution units Sun Cabinet Power Distribution Unit (PDU) Installation Guide
Install the array Sun Storage 6180 Array Hardware Installation Guide
Install the management software Sun Storage Common Array Manager Installation Guide
Sun Rack II User’s Guide
Oracle Contact Information
Documentation http://www.oracle.com/technetwork/indexes/documentation/index.html
Support https://support.oracle.com
Training https://education.oracle.com
Copyright © 2009, 2011, Oracle and/or its affiliates. All rights reserved.
Copyright © 2009, 2011, Oracle et/ou ses affiliés. Tous droits réservés.
Part No.: E21495-01, Mfg No.: 7012703 June 2011
6
Loading...