BWS350 System Installation, Operation & Maintenance 2
General Information
Safety Warning
Electrical work should be performed by a qualied
electrician in accordance with all applicable
codes and regulations.
Service Contact
For local maintenance and service information
please contact your nearest Authorized Service
Representative. Service inquiries may be directed
to technical support at:
OptiPure a div. of AQUION, Inc.
2605 Technology Dr. Bldg. 300
Plano, TX 75074 USA
Phone #: 972.881.9797
Fax #: 972.422.6262
E-mail correspondence to:
techsupport@optipure.net
Safety Instructions
1. Please read and follow these instructions
when connecting and using the system.
2. To avoid electrical shock, never touch the
inside of the electrical box. Only a qualied
technician should open the electrical box.
3. Never use the system if the power cord or
oat switch cable has been damaged. Do not
allow anything to rest on the power cord or
oat switch cable, and keep the cords away
from any place where people may trip over
them.
4. When disconnecting from the electric socket
hold the plug, not the cord.
5. If the processor does not function properly,
especially if there is an unusual sound or
smell coming from it, immediately unplug
the processor. Call your authorized service
representative.
Environmental Conditions
The BWS350 is certied to operate under the
following conditions:
1. Altitude up to 2000 m.
2. Ambient temperature of 40-105
3. Max relative humidity 80% at 88
4. Main supply voltage not to exceed +/- 10%.
5. Installation category II.
6. Pollution degree II.
7. Indoor use only, protect from elements.
Explanation of Symbols
The following symbols are used on the water
processor. The symbols and their explanation is
given below:
Earth ground:
°F (5 - 40°C).
°F (31°C).
6. Unplug the processor and RP pump from the
AC outlet prior to any service.
7. Locate the RP Assembly as close as possible
to an AC outlet.
8. Securely bolt processor to wall before
operating.
9. Avoid cross-connections and install on cold
water supply only.
10. Use approved Air-Gaps when connecting to
drain lines.
11. Do not exceed system pressure rating and
use water hammer arrestors when water
hammer is evident.
12. Turn off Feed-Water supply before lter or
membrane cartridge replacement.
WARNING: Hazardous Voltage:
BWS350 System Installation, Operation & Maintenance 3
Getting To Know Your System
The BWS350 Advanced Membrane Separation System is designed specically for users that desire the ability to customize
the TDS (Total Dissolved Solids) level or “Mineral Content” of the treated water. The BWS350 utilizes a precision multi-turn
Blending Valve to accomplish this with great accuracy. This system design maximizes the ability to accurately blend a calcu-
lated percentage of the ltered water with the product water exiting the AMS-QT Membrane, providing an Optimized Water to
your equipment with the characteristics that you desire.
Normal
Operation
120VAC or
Repressurization
Pump
Water Quality Indicator - Operates
momentarily, push purple button to turn on.
Push “IN” button for the TDS of the water
going into your equipment. Push “OUT”
button for the TDS of the puried water from
the membrane.
120VAC or 230VAC Power Cord
- Plug in to standard wall outlet.
Feed Water Inlet
3/8” Push-To-Connect -
Connect to Water Supply Valve.
Emergency Bypass Valve -
User can switch from Optimized
Water to Untreated Water
when needed, by turning handle
horizontal.
Reject Water Outlet - 1/4”
Push-to-Connect - Connect to drain
per local regulations.
CTO-Q (2x)
Pre-Filters
Repressurization
Pump
120VAC or 230VAC -
Plug in to
standard wall
outlet
Optimized Water To
Storage Tank - 3/8” Push-To-
Connect - Connect to Optimized
Water Storage Tank Inlet
1
2
Buffer Tank Valve
- Normally open (handle parallel to
valve body). Used to shut off water
supply to downstream equipment.
precise adjustment of optimized
water TDS (mineral content).
3
4
Items in green circles show a nor-
mal operating condition/position.
Tank
Repressurization Return-
1/2” gray hose - Connect to
Repressurization Assembly Outlet
Operating Pressure Gauge
Shows feed pressure only when processor is
operating (when level in storage tank is low).
Sample Port -
3/8” Push-to-Connect - Used to ush pre
lters, gather a water sample, measure pro-
duction, or drain water from storage tank.
Reject Flow Control Valve
Pressurized
Optimized Water Outlet -
1/2” gray hose
-Connect to End User Equipment
AMS-QT Membrane
Cartridge
Membrane Reject Water
Tubing Connection
MA-Q15 Mineral
Cartridge
Low Level Relay & Control Box -
230VAC
- Plug in cord to standard wall outlet. Box
connected to LL Float Switch & Pump. Light on top
illuminates when there is water in tank & Pump is enabled.
Optimized
Water
Storage Tank
- 50 gal. Atmospheric
Repressurization Assembly
Outlet - 1/2” Hose Barb - Connect to
Pressurized Water Inlet on Processor
Optimized Water to Storage Tank
Inlet (on Valve)
- 3/8” Push-to-Connect - Connect to Optimized Water Outlet on Processor.
Tank Inlet Divert Valve
- Normally in Down position. Turn handle to Up
position to divert Optimized water to sample port.
High Level Float Switch (in Tank)
& Cable (on back or side of tank) - Connect
Cable to Processor “Tank Electrical Connection.”
Low Level Float Switch (in Tank)
- Shuts off pump (using Relay) when tank is empty.
Optimized Water Storage Tank
- 16 gal. Atmospheric
BWS350 System Installation, Operation & Maintenance 4
Installation Requirements
This section and the next provide the water, electrical
and space requirements for the BWS350. Pay
special attention to the feed-water chemistry
requirements. Operating a system on water supplies
outside of these parameters may lead to premature
membrane failure. This product is for commercial
use only and must be installed and maintained in
accordance with manufacturer’s guidelines and local
regulatory plumbing and electrical codes.
is strictly dependent on feed water temperature
and pressure. Reduced temperature or pressure
will reduce production. For example: Operating
pressure of 30 psi will cut production by 50%. 48˚F
feedwater will cut production by 50%.
Location
The system should be installed indoors, in the
proximity of the equipment (within 25 feet) and
protected from the elements. Do not let the processor
or storage tank freeze or be exposed to rain or direct
sunlight.
Post-treatment
Treated water stored in a tank may absorb organic
compounds from the tank, which can affect water
taste and odor. If product water is for consumption, an
optional post-treatment lter, such as an OptiPure
FX or QT carbon lter, should be installed after the
tank. If used, it is best installed as close to the point of
use as possible. Other specialized post-treatment is
also available.
Feed water connection
An adequate ow and pressure of water to the unit is
essential for successful operation. Provide a dedicated
1/2” water line to the vicinity of the installation. Install
a full-ow ball valve and pressure gauge with 1/2”
female pipe thread (user supplied) for connection to
installation hardware provided with the system. A 1/2”
*TDS (total dissolved solids) create conductivity in water and are
expressed in ppm or mg/l (parts per million or milligram per liter).
System Reject % depends on blended water setting.
**Nominal production @ 77°F (25°C) @ 500 ppm based on a 24
hr day. Actual production will vary based on variations in water
temperature, pressure, and TDS.
male pipe thread x 3/8” push-to-connect adapter is
included in the installation kit.
Drain
A drain should be located within 5 feet of the location
of the unit. Drain must allow a minimum ow of 2
gallons per minute. Compliance with most local
plumbing codes requires installation of an approved air
gap in the drain line. The drain connection should be
accessible for system set-up and service.
Electrical requirements
A power source with two outlets should be located
within 5 feet of the location of the unit.
Processor
RP Pump
120V, 6 Mz, 6 Watts or 230V, 50Hz 6 Watts
120V, 6 Mz, 2 Amps or 230V 50Hz 2 Amps
Feed-water chemistry
Feed TDS Up to 1200 ppm
Feed pH 6 - 10
Hardness 28 grains or less
Free chlorine <2 mg/l
Iron (Fe) 0.1 mg/l max.
Turbidity <0.05 NTU
Manganese 0.05 mg/l max.
Hydrogen sulde 0.0 mg/l
A water analysis must be conducted before installing
the system, or the information requested above can
be obtained from your local water utility. If your water
analysis shows that any of these parameters are not
within range, additional pretreatment and/or higher
frequency of maintenance may be required. Contact
your OptiPure distributor for assistance. The presence
of silica or occulants such as alum or cationic
polymers in the feedwater may cause membrane
fouling and may require special chemical pretreatment
or periodic membrane cleaning. Please note that
membrane failure due to fouling is not covered by the
warranty.
Storage Tank
The tank must be located within 10 feet of the water
processor unit. The oor beneath the storage tank
should be smooth, clean and free of sharp objects that
could puncture the bottom of the tank. Note: The tank
is atmospheric, with a sub-micron, hydrophobic air
breather lter.
Optimized Water Lines to Equipment
Tubing, piping and associated ttings connecting
Optimized water lines to equipment shoud be food
grade material that meets NSF Std 51 or 61 with a
minimum pressure rating of 75 PSI. Optimized water
may react with most metal piping imparting a bad
taste. Plastic pipe or reinforced opaque beverage
tubing are acceptable choices for Optimized water
distribution. The larger inside diameter tubing or hose,
the better to minimize pressure drop.
BWS350 System Installation, Operation & Maintenance 5
Equipment Dimensions
IMPORTANT - ALLOW A MINIMUM OF 24” IN FRONT OF THE PROCESSOR FOR MAINTENANCE AND SERVICE. DO NOT MOUNT
SYSTEM ABOVE THE CEILING OR IN A LOCATION THAT IS NOT EASILY ACCESSIBLE. WHEN THE 50 GAL. TANK ASSEMBLY IS
FULL OF OPTIMIZED WATER IT WILL WEIGH 450 LBS (THE 16 GAL. TANK, 140 LBS). ALWAYS LOCATE THE STORAGE TANK
WHERE IT CAN BE ACCESSED DURING SERVICE.
50 Gallon Tank
Repressurization Assembly
Processor
Left Side
View
Optional 175 Gallon Tank
with Repressurization Pump
Allow 3”
to remove
cartridges
Processor
Front View
16 Gallon Tank Repressurization Assembly
Right Side ViewFront View
BWS350 System Installation, Operation & Maintenance 6
Typical Installation with 50 Gal. Atmospheric Tank
Important: Plumbing should be performed by a qualied plumber in accordance with local codes.
Tank
Repressurization
Return
Operating
Pressure
Gauge
Power
120VAC or 230VAC, 2A
Tank High Level Float Switch Cable
Power Cord
Emergency
Bypass Valve
Processor
Water Quality
Monitor
Feed
Water
When installing, keep lines from the Repressurization Assembly to the equipment as
short as possible to minimize pressure loss.
IMPORTANT - PROTECT PROCESSOR AND
REPRESSURIZATION ASSEMBLY FROM THE
ELEMENTS. DO NOT INSTALL IN DIRECT
SUNLIGHT OR WHERE EXPOSED TO FREEZING TEMPERATURES OR RAIN.
Repressurization
Assembly
Air
Breather
User-Supplied
Water Supply
Valve &
Pressure Gauge
Buffer Tank Valve
(Normally Open)
Feed Water Line -
Green - from Water Supply
Valve to Feed Water Inlet
Repressurization
Assembly Outlet
(Hose Barb)
Feed Water
Reject
Water
Outlet
Optimized
Water
to Storage
Tank
Reject
Water
(to Drain)
Blending Valve
Inlet
-Set to req'd
TDS reading!
CTO-Q
Pre-Filter
132
Drain Line- Black -
from Reject Outlet to Drain
CTO-Q
Membrane Reject Water
AMS-QT
Pre-Filter
Tubing Connection
Sample
Port
Optimized
Water
Outlet
to Eqpt
Membrane Cartridge
MA-Q15
Mineral Cartridge
4
Repressurization
Pump
120VAC or 230VAC
Processor
Control High
Level Float
Switch
(inside tank)
Buffer
Tank
Low Level
Float Switch
(inside tank, with
Control Box attached to Buffer
Tank bracket)
Bypass
Pressurized Water Line
- 1/2" Gray Hose with hose barb inserts at both ends - from
Repressurization Assy Outlet to Storage Tank/RP Return
Optimized
Optimized
Water to
Storage Tank
Inlet (on valve)
Tank Inlet Divert Valve
(Valve normally in Down
position. Turn to Up position
to bypass Repressurization
Assy.)
Safety Float
Valve
(inside tank)
Water Line
- Blue - from
Optimized Water
Outlet to Tank Inlet
Optional
Carbon
Optimized Water
Storage Tank
- 50 gal. Atmospheric
PostTreatment
with hose barb insert - Make connection to
distribution and (optional) post-treatment.
Optimized Water Line - 1/2" Gray Hose
Optimized
(Treated)
Water to
Equipment
BWS350 System Installation, Operation & Maintenance 7
Installation with 16 Gal. Storage Tank
Refer also to “Typical Installation” Diagram on previous page.
-to
Pressurized
Water Line
- connect to
Processor Tank
Repressurization
- Connect to
Processor Optimized
Water Outlet
Optimized Water
Line
High Level Switch Cable
-Connect to electrical box on
left side of Processor
Buffer Tank
Valve
(Normally Open)
Optimized
Storage Tank Inlet
Water to
(on Valve)
Repressurization
Assembly Outlet
(Hose Barb)
Plywood anchored to wall
Outside edge of
processor bracket
8.9”
12.7”
Bypass
Return
Buffer Tank
Air
Breather
Tank Inlet
Divert Valve
Repressurization
Pump
Optimized Water
Storage Tank
- 16 gal. Atmospheric
10.5”
120VAC or 230VAC
Power Cord
(without the cartridges) to mark the locations
for the screws. BE SURE TO ALLOW 3”
BELOW THE CARTRIDGES TO ALLOW FOR
REMOVAL. Screw the four bolts or screws in
place, leaving approximately 1/4” clearance
between the bottom of each bolt head and the
wall. Position the system over the mounting
bolts, and let the bracket slip down into the
keyholes. Tighten all screws.
Outlet
System Installation
Note: Do not install the cartridges in the
processor until completing this section.
Do not plug in the power cord from the RP
pump until completing the following section,
“System Start-Up”.
Refer to “Typical Installation” diagram on
page 6 and “How to Use Our Quick-Connect
Fittings” on page 20 when making the
following connections.
A feed water ball valve and pressure gauge (user
supplied) should be installed to provide water to
the system FEED WATER INLET with the green
tubing (supplied). Hose, tubing and ttings for
making connections between the processor,
storage tank and drain are supplied in the
installation kit.
14.7”
Wall Mounting
The processor should always be mounted where it
is well-supported, either using anchors in a cement
wall, or using the support of studs in a wall-board
wall. Never mount it directly to sheet-rock alone.
Instead, mount it on a sheet of plywood which is
anchored to the wall studs, as shown above.
Four user-supplied bolts or screws with a head
diameter of approximately 1/2” (which will t into the
keyholes in the system bracket, but will not slip out
when tightened) should be used to hang the system.
This will allow the unit to be lifted off the bolts, if
necessary for maintenance, without removing all
the bolts from the wall. Hold the processor in place
1. Remove the tank lid. Inside the tank, the oat
valve may be secured for shipping. Remove
any wrapping on the oat to allow it to hang
and move freely.
2. DRAIN: Connect the 1/4” black tubing from
the installation kit to the REJECT WATER
OUTLET on the processor. Run the line to
an appropriate drain. Observe local plumbing
codes and supply an appropriate air gap.
(Any ttings for connecting to the drain will
need to be supplied by the customer.) Fix
tubing in place at the drain.
3. FEED WATER: Apply 3 ‘wraps’ of Teon tape
to the 1/2” FPT x 3/8” push-connect tting
(supplied). Screw the tting into the Feed
Water Supply Ball Valve and tighten (DO
NOT OVERTIGHTEN). Connect one end
of the 3/8” GREEN TUBING to this tting.
Connect the other end of the tubing to the
FEED WATER INLET located on the left
side of the Processor. Cut the tubing to the
required length if necessary.
BWS350 System Installation, Operation & Maintenance 8
NOTE: When cutting the tubing use a sharp tubing
cutter or blade and make a clean, straight cut
before inserting into a push-connect tting. When
Buffer Tank
Valve
- Shown in the
normal positon
Repressurization Assy
Outlet
routing tubing, do not make sharp bends or crimp
the tubing.
4. PROCESSOR TO TANK: Connect a piece of
the 3/8” blue tubing to the OPTIMIZED WATER
TO STORAGE TANK tting on the processing
unit. Connect the other end of this tubing to the
OPTIMIZED WATER TO STORAGE TANK INLET
on the storage tank INLET DIVERT VALVE.
50 Gallon Storage Tank
Buffer Tank Valve
- Shown in the
normal positon
Repressurization
Assy Outlet
Optimized
Water Inlet
Tank Inlet Divert
Valve - Shown in
the normal positon
16 Gallon Storage Tank
Optimized
Water Inlet
Tank Inlet
Divert ValveShown in the
normal positon
5. REPRESSURIZATION ASSEMBLY TO
PROCESSOR: Using two of the 1/2” hose barb
inserts (supplied), a piece of 1/2” gray hose,
and two hose clamps, connect hose from the
REPRESSURIZATION ASSEMBLY OUTLET
on the Repressurization Assembly to the
TANK REPRESSURIZATION RETURN on the
Processor. The ridged end of a hose barb insert
goes into each end of the hose with a hose clamp
tightened onto it. The smooth ends of the hose
barb inserts go into the push-to-connect ttings on
the Processor and Repressurization Assembly.
6. Route the cable coming from the high level switch
to the electrical box on the processor. Connect
the AMP connector to the TANK ELECTRICAL
CONNECTION located on the grey electrical box.
7. OPTIMIZED WATER TO EQUIPMENT: Connect
a piece of 1/2” ID gray hose to the OPTIMIZED
WATER OUTLET on the processor with a 1/2”
hose barb insert and clamp (supplied). At a later
time, the other end of this line will be connected
to the distribution line that will deliver Optimized
Water to the equipment, but for now leave the line
loose and route the loose end of the gray hose into
a drain or bucket. (Make certain the hose length
will reach the storage tank; this will be required for
the Start-Up procedure.) Prepare any necessary
plumbing to make the connection between the
1/2” hose and the distribution line, which will be
completed in “Connect to Equipment”.
NOTE: If Post Filtration is used, it will be installed
between the Optimized Water Outlet and the
designated equipment.
Optional RP Assembly Location
The Repressurization Pump and Buffer Tank assembly
is on a stand that can be remote from the storage tank.
If this type of installation is required, the RP Assembly
should be built as a remote unit from the OptiPure,
with additional installation instructions supplied.
BWS350 System Installation, Operation & Maintenance 9
Install QT Cartridges
NOTE: Before installing the QT Cartridges, make sure
to remove the four plugs in the QT heads.
1. Insert the CTO-Q cartridges into QT heads 1 & 2
(starting from the left or inlet side of the processor)
and turn to align arrows.
2. Insert the AMS-QT membrane cartridge into the
QT head #3 and turn to align arrows.
3. Insert the MA-Q15 mineral cartridge into QT head
#4 and turn to align arrows.
4. Connect the Push-to-Connect elbow (remove plug
in elbow) on the end of the black Reject tubing to
the stem connector on the bottom of the AMS-QT
cartridge.
System Start-Up
Refer to illustrations “Typical Installation” (page 6) and
“High Level Switch Testing” (page 20).
IMPORTANT: Before proceeding, position the
Processor EMERGENCY BYPASS VALVE in the
“SERVICE” position, assure that the BUFFER TANK
VALVE is open, and position the TANK INLET DIVERT
VALVE in the down position (Blue Valve Handle
pointing sideways).
1. Slowly open the user-supplied WATER SUPPLY
VALVE. Plug the processor power cord into a
120VAC outlet. Allow the lter housings to ll, and
water will begin to ow from the end of the 1/4”
black tubing routed to the drain. After some time,
water will begin to ow into the tank. Allow several
minutes to ush the system until water ows
smoothly into the tank and also from the drain line.
Check all of the plumbing connections and correct
any leaks if necessary.
2. Test the high level oat switch. With the tank lid
removed and the system running, raise and tilt the
high level oat (in the tank). As you raise the oat
upward, the ball inside the oat will roll from one
end of the oat to the other, activating the switch.
• With the oat in the upright position, the water
processor should shut off the water ow.
• Lower the oat allowing the ball to drop back
down. The water should begin owing again.
3. The 16 Gal Storage Tank must be lled - or the 50
Gal Storage Tank lled approximately 1/3 of the
way - to start-up and purge the Repressurization
Assembly. You can quickly ll the storage tank
to the appropriate level using the “System
Bypass” on the processor. To do this:
• Route the 1/2” gray hose from the processor
OPTIMIZED WATER OUTLET TO EQUIPMENT
directly into the storage tank lid opening.
NOTE: Before performing the next step, be certain
to hold onto the gray hose.
• Turn the EMERGENCY BYPASS VALVE on the
processor to the “BYPASS” position. This will
allow feed water to bypass the processor and
quickly ll the storage tank.
• When the tank lls to approximately 14
gallons (or 1/3 full with the 50 gal. tank),
return the PROCESSOR EMERGENCY
BYPASS VALVE to the “SERVICE” position.
NOTE: Before performing the next step, be certain
to hold onto the gray hose.
4. Plug the power cord from the RP pump into the
outlet. Water should begin to ow rapidly from
the storage tank, through the RP assembly,
and back into the storage tank through the gray
hose. Allow the pump to recirculate the water for
several minutes until all the air is purged from the
Repressurization Assembly. As the air is purged,
the pump will begin to run more smoothly and
the water owing from the gray hose will become
steady.
5. Unplug the RP Pump cord.
Connect to Equipment
Refer to the illustration “Typical Installation” on page 6.
1. Remove the 1/2” gray hose that was routed
into the storage tank (from the Optimized Water
Outlet at the Processor) and make the connection
to the distribution line that delivers Optimized
Water to post-treatment (if used) and designated
equipment.
2. Ensure that any valves or solenoid valves on the
connected equipment are closed. Plug the RP
Pump back in. The pump will run and ll the Buffer
Tank until the pressure in the Buffer Tank reaches
70 psi, and then the RP Pump will shut off.
BWS350 System Installation, Operation & Maintenance 10
3. Open downstream valves at the equipment to
allow water to ow and air to purge through the
post-treatment (if used) and from the distribution
lines. When purging distribution lines the pump
may shut off if the water level in the storage tank
drops near the bottom of the tank. (Add more
water to the tank if necessary.) Once distribution
lines are ushed and all air is purged, close the
equipment valves. When there is no demand for
water the buffer tank will ll and the pump will shut
off automatically.
4. Before proceeding to “System Blend Adjustment,”
follow these steps to empty the tank of untreated
feed water:
• Connect a piece of 3/8” blue tubing into the
push-to-connect tting of the SAMPLE PORT
VALVE on the right side of the processor, and
route the other end of the tubing into a drain or
bucket.
• Open the Sample Port Valve to drain water
from the storage tank. When the pump shuts off
due to a low water level, close the Sample Port
Valve.
5. Replace and tighten the lid onto the storage tank.
2. Push the purple “POWER” button on the Water
Quality Monitor located on the upper left corner.
It will immediately display the “IN” or Optimized
Water - TDS (Total Dissolved Solids) in PPM (parts
per million). By adjusting the blend valve you are
able to change the “IN” TDS to the desired Target
Range.
3. Within 30 seconds, push the “OUT” button to
display the Permeate Water TDS (from the RO
membrane).
4. If the “IN” TDS is outside of the desired range:
• Turn the Blending Valve knob counter-clockwise
to open the Blending Valve, increasing the
amount of Filtered Water blending with the
RO water, thereby increasing the TDS of the
Optimized Water.
• Turn the Blending Valve know clockwise to close
the Blending Valve, decreasing the amount
of Filtered Water blending with the RO water,
thereby decreasing the TDS of the Optimized
Water.
5. Once the desired TDS is obtained allow the
system to run for several minutes, periodically
checking the “IN” TDS. Make smaller incremental
adjustments as necessary until the TDS “Target” is
achieved.
System Blend Adjustment
IMPORTANT: The TDS Blend must be properly
adjusted before operating the connected
equipment. If you do not know the “TARGET TDS”
SET THE BLEND “IN” between 60 and 80. The
owner/operator should consult with their OptiPure
Dealer or contact the OptiPure factory for assistance in
determining an appropriate TDS Target Range.
An improper TDS Blend setting or failure to
properly maintain the system can cause damage
to equipment. Factors that can impact the TDS of the
Optimized Water include changes in water pressure
and temperature, seasonal changes in water quality,
and municipal source blending practices. To assure
maintaining your target TDS range year-round we
recommend periodically checking the “IN” TDS and
making adjustments as needed.
Optimized Water TDS - Blending Adjustment
1. Allow the system to operate for at least 5 minutes
before continuing to Step 2.
Complete the Installation
Transition to Owner/Operator
The FINAL STEP is to meet with the Owner/Operator,
familiarize them with the system and complete the
Post-Installation Check List.
The system is now in “normal operating” mode and
the storage tank will ll with Optimized Water from
the Processor. Complete the “Post Installation
Checklist” to Conrm Normal Operation and
System Settings.
Allow the storage tank to ll before beginning
operation of the connected equipment.
BWS350 System Installation, Operation & Maintenance 11
Repressurization Pump
The Repressurization Pump Assembly that comes
standard with the BWS350 System includes a diaphragm pump controlled by an internal Pressure
Switch, and a Buffer Tank between the Pump and the
downstream equipment maintains downstream pressure. Water demand for downstream equipment is
directly supplied from the Buffer Tank, and demand
can go on and off as necessary. The RP Pump is not
directly affected by downstream demand, and downstream equipment is also not affected by the automatic
starting or stopping of the RP Pump. When the pres-
sure drops sufciently in the Buffer Tank, the pump
starts automatically repressurizes the Buffer Tank.
The operating pressure for the RP Pump is preset (to
70 psi) and is NOT eld adjustable.
The pump also incorporates check valves to keep the
Buffer Tank and downstream line pressurized. The
pump is equipped with auto-reset, thermal overload
protection and is designed for intermittent duty.
If the pump runs erratically, allow the pump to run
to open drain with valve fully open to purge air
from the pump head. Disconnect the power and
reconnect several times to facilitate air purging.
The pump will prime only if all the pressure is relieved
from the outlet port. The pump is self-priming up to
11 ft. The pump can run dry but will overheat and the
pump overload will shut the pump off.
Storage Tank Level Controls
(See also the Electrical Schematic at the end of this
manual.) For system control, there are independent
High and Low Water Level Float Switches in the
Storage Tank. When the Storage Tank becomes full,
the High Level Float Switch shuts off the Processor,
preventing ow to the Tank.
If the tank is empty, the Low Level Float Switch automatically shuts off the RP
Pump. As long as the power
cord from the Tank/RP unit
is plugged in, and there is a
minimal amount of water in
the Storage Tank, the green
light is illuminated on the
Control Box (attached to the
Buffer Tank bracket), indicating that power is supplied
to the RP Pump. This light
means the RP unit is enabled, even though the RP
Pump may be automatically
turned off when the Buffer Tank is pressurized and
operation of the Pump is not
needed.
Low Level Float Switch
Indicator light
BWS350 System Installation, Operation & Maintenance 12
BWS350 Processor Components
Sample Port
Valve -
PN: 520-12223
Pressure Gauge -
PN: 530-20018
Pressurized
Water Check
Valve -
PN: 524-01035
Blue Tubing -
Optimized Water Line
PN: 580-00110
Permeate
Check Valve -
PN: 524-01030
Solenoid Valve -
PN: 714-10005
Red Tubing -
Bypass Water Line
PN: 580-00104
Water Quality Monitor -
PN: 530-40112
Electrical Box -
w/Tank Connection
Bypass Valve -
PN: 520-12230
Green Tubing -
Filtered Water Line
PN: 580-00111
Reject Flow
Control -
PN: 514-00440
Blending Valve -
PN: 514-00442
Black Tubing -
Reject Water Line
PN: 580-00106
AMS-QT Cartridge -
PN: 204-53040
CTO-Q PreFilters (x2) -
PN: 300-05830
Stem Connector -
PN: 551-65210
MA-Q15 Cartridge -
PN: 300-05855
Union Elbow -
PN: 551-63021
BWS350 System Installation, Operation & Maintenance 13
Tank/RP Components
50 Gallon Storage Tank Shown.
Buffer Tank -
For 16G Storage Tank - PN: 340-50001
For 50G Storage Tank - PN: 340-50004
Low Level
Control Relay -
(in Control Box)
PN: 740-01290
Buffer Tank Valve -
PN: 520-14501
Tank Bracket -
For 16G Storage Tank PN: 594-80516
For 50G Storage Tank PN: 594-80510
RP Pump -
PN: 704-35513
Air Breather -
PN: 300-40005
Tank Inlet Divert Valve -
PN: 520-12225
In normal operation, handle should be
down (horizontal). For measuring water
production or purging air from system,
turn Divert Valve handle up.
High Level Float Switch -
(inside tank)
PN: 740-01120
Controls Processor. When
tank is full, oat switch is in up
positon and switch inside oat
is open, causing Processor to
shut off.
Float Valve -
(inside tank
beneath inlet)
PN: 520-01203
Bypass
Check Valve-
PN: 524-01030
RP Assy
Outlet -
1/2” Hose Barb
Insert,
PN: 550-08730
Connect to
equipment inlet.
Optimized Water Inlet -
Connect line from Optimized
Water Outlet
Foot Valve -
(inside tank, at
base of pump
suction tube)
PN: 520-10221
Low Level
Float Switch -
(inside tank)
PN: 740-01116
16 Gal Storage Tank -
PN: 570-00016
50 Gal Storage Tank -
PN: 570-00056
(50 Gal Tank shown.)
BWS350 System Installation, Operation & Maintenance 14
Product/Reject Flow Rate Adjustments
Introduction
The AMS-QT Reverse Osmosis membrane uses
pressure to allow pure water molecules to lter through
its semipermeable membrane separating pure water
from dissolved solids (salts) and other contaminants.
In essence the membrane splits feed water into two
separate streams. One stream is the water produced
for use (product or pure water), and the other
contains the salts and contaminants ltered out by
the membrane (reject) carried away to the drain. The
OptiPure BWS350 is designed to produce water at
a 30% recovery rate which means it uses water at a
ratio two gallons of reject water for each gallon of pure
water produced. This is a Product/Reject Ratio of 1:2.
The “pure water” produced by the membrane is
not always appropriate for use with food service
equipment. The BWS350 system also allows
blending ltered water with the pure water to produce
Optimized Water which can be adjusted to provide
the ideal characteristics for foodservice equipment
applications. Instructions for blending Optimized water
are on page 10.
Each system is adjusted at the factory for the
proper operating parameters.
In most cases the factory setting should not be
changed. However, due to certain conditions an
adjustment may produce better operating efciency
and membrane performance. Conditions that can
inuence the best Product/Reject Flow Rate Ratio
include feed water quality (TDS level, Turbidity and
specic contaminants such as iron and silica) along
with water temperature and water pressure. The
determination of whether to make a Product/Reject
Flow Rate adjustment is complex. An understanding
of your water chemistry and operating conditions in
necessary in order to safely deviate from the factory
setting. It is strongly recommended that you
contact your OptiPure dealer or the factory for
assistance before changing the factory setting.
Reject Flow Rate Adjustment
The parameter that can be adjusted is the Reject
Flow Rate. This is the amount of water used to carry
away the impurities rejected by the membrane. It
is critical that both the Product Flow Rate and the
Reject Flow Rate are measured to conrm the desired
Product/Reject Ration has been achieved. The higher
the ratio of product to reject ow rate, the shorter the
life of the membrane will be.
IMPORTANT: Never close the Reject Flow Control
Valve, and never adjust it such that the Reject ow
rate is less than the Permeate (Product) ow rate!
This will cause premature fouling and shorten
membrane life.
To adjust the reject ow rate, locate the reject ow
control valve. Loosen the lock-nut (at the base of the
valve stem) just slightly.
IMPORTANT: Before adjusting Reject Flow Rate
CLOSE the BLENDING VALVE.
To increase the reject ow rate, use a slot screw driver
to turn the valve stem counterclockwise. To reduce the
reject ow rate, turn it clockwise. A minor adjustment
makes a big difference in the ow rate so begin with
Reject Flow Control
Adjust with Blend Valve Closed
BWS350 System Installation, Operation & Maintenance 15
• The ow rates above are for 60 psi feed pressure.
• To convert gallons per minute (gpm) to ounces per minute, multiply gpm by 128.
• To convert gallons per minute (gpm) to milliliters per minute, multiply gpm by 3785.
small (1/2 turn) adjustments. After making an
adjustment, measure the reject and product water ow
rates. Make additional adjustments until the desired
Product/Reject Ratio is achieved, then tighten the locknut.
Use the “Operating Parameters” table above as a
guideline for safe operating ow rates and ratios. This
table provides an indication as to how Feed Water
temperature affects the Product Water output of the
system.
Measuring Product Flow Rate
Connect a piece of 3/8” tubing to the Sample Port on
the right side of the Processor and route it to a bucket
or drain. If the tank is full, turn the Sample Port valve
to the sample position and allow about 20 gallons to
drain out of the storage tank, then close the Sample
Port valve. Close the Buffer Tank Valve and turn the
Tank Inlet Divert Valve to the divert position (Up). Open
the Sample Port valve. While the system is operating
in normal mode (Emergency Bypass Valve in Service
position), use a graduated cylinder or other measuring
vessel to collect and measure the amount of water that
is produced (from the tubing connected to the Sample
Port) in 60 seconds. To convert ounces per minute to
gallons per day, multiply ounces/mn by 11.25.
When nished, close the Sample Port valve, turn the
Tank Inlet Divert Valve to the Down position, and open
the Buffer Tank Valve.
Measuring Reject Flow Rate
Access the Reject Drain Line and perform the same
procedure described in “measuring product ow rate.”
the Blending Valve closed based on 60 psi Operating
Pressure and 77°F which is typically 919 ml per minute
+/- 15%. Never close Reject Flow Control Valve nor
limit Reject ow to less than Permeate ow!
The AMS-QT membrane is rated for a target daily
output of 350 gallons per day of Product Water
when the feed water temperature is 77°F and the
operating pressure is 60 psi. Do not exceed the
rated output of 350 gpd/14.58 gph/0.243 gpm (1,325
liters per day/55.125 liters per hour/919 milliliters
per minute). Always keep in mind that feed water
temperature and pressure will affect the Product
Water output. Depending on feed water pressure
and temperature it may not be possible to achieve
the rated production of 350 gpd.
Blending Impact on Product/Reject Ratio
Once the Blending Valve is opened to blend Filtered
Water with the RO Product Water the combined
Optimized Water ow rate will be greater than the
Product Flow Rate. For example, if the Feed Water
TDS is 300 ppm, the AMS-QT product water TDS will
be 9 -15 ppm. If your desired Optimized Water TDS
is 75 ppm, then you will be adding approximately
13% of the Filtered Water to your RO product water,
increasing your Optimized Water ow to a 42%
recovery.
In this example your daily Optimized Water Production
is approximately 441 gpd at 77°F Feed Water
temperature and 60 psi Operating Pressure.
Limitations on Adjustment of Reject Flow Rate
The factory sets the Product/Reject Ratio to 1:2 with
BWS350 System Installation, Operation & Maintenance 16
Routine Maintenance
Emergency
Bypass Valve
CTO-Q Pre-Filters
PN: 300-05830
Change Every 3 to 6 months
Normally, the most frequent routine maintenance
required on the system is periodic replacement of
the carbon/sediment pre-lters and the optional post-
treatment cartridge. The CTO-Q cartridges should
be changed every 3-6 months depending on water
usage. In areas with high levels of sediment and other
contaminants the CTO-Q cartridges may require more
frequent changes.
Pre-Filter change procedure
1. Unplug the RP Pump power cord.
2. Either close the Water Supply Valve (shutting off
all water ow), or put the Emergency Bypass Valve
(on the Processor) in the System Bypass position
(allowing untreated water to continue to ow to the
equipment).
3. Wait a moment for system pressure to drain off.
4. Once the system pressure has been relieved,
remove the two CTO-Q cartridges by turning a
quarter-turn to the left and pulling down on the
cartridge.
5. Install the new CTO-Q cartridges into the QT
heads by aligning the notches and pushing up,
then turn a quarter-turn to the right.
6. Install a piece of 3/8” tubing in the Processor
Sample Port valve, open the Sample Port, and
direct to a bucket or drain.
AMS-QT Cartridge PN: 204-53040
Sample Port-
For Testing,
Priming and
Sampling ONLY.
MA-QT15
PN:300-05855
Change Every
7. Turn the Tank Inlet Divert Valve to the Bypass
Mode (Handle Pointing UP).
8. Open the Water Supply Valve and put the
Emergency Bypass Valve in the “SERVICE”
position, allowing water to run into the new PreFilter cartridges and purge air through the system
and out the Sample/Flush Port to drain.
9. Once the air has been purged and lters ushed,
close the Sample Port valve and return the Tank
Inlet Divert Valve to the Normal position (handle
horizontal or down).
1. Close the ball valve at the inlet to the PostTreatment assembly.
2. Remove the existing cartridge and discard.
3. Install the new cartridge.
6 months
4. Open the ball valve and the RP pump should
actuate lling the housing with water.
AMS-QT Replacement
The AMS-QT membrane is a high-efciency, low-
fouling reverse osmosis membrane that will provide
product water with >97% rejection of the Feed Water.
The life of the membrane will vary depending on Feed
Water quality, usage, and Pre-Filter maintenance.
Typical membrane life is 12 to 18 months, but with routine scheduled Pre-Filter replacement, and no adverse
Feed Water conditions, the AMS-QT membrane may
last 2-5 years.
1. Unplug the RP Pump power cord.
2. Either close the Water Supply Valve (shutting off
all water ow), or put the Emergency Bypass Valve
(on the Processor) in the System Bypass position
(allowing untreated water to continue to ow to the
equipment).
3. Place a bucket or other similar catch basin under
the AMS-QT. Remove the black reject line from
the push-to-connect elbow on the bottom of the
membrane. (Refer to “Push-to-Connect Fittings”
on page 20.) Allow the membrane and reject line
to drain into the bucket.
4. Remove the AMS-QT cartridge from the head by
turning the cartridge a quarter-turn to the left and
pulling down on the cartridge.
5. With a wrench, remove the push-to-connect elbow
and stem adapter attached to the bottom of the
AMS-QT cartridge. Remove the residual Tef-
BWS350 System Installation, Operation & Maintenance 17
Routine Maintenance, Continued
lon tape from the male 1/8” threads on the stem
adapter.
6. Wrap the 1/8” male thread on the stem adapter
with 2 wraps of Teon tape and re-install in the
bottom of the new AMS-QT cartridge.
7. Align the taps on the AMS-QT cartridge with
the QT head and insert into the head and turn a
quarter-turn to the right.
8. Insert the black reject line into the push-to-connect
elbow on the bottom of the AMS-QT cartridge.
9. Install a piece of 3/8” tubing in the Processor
Sample Port valve, open the Sample Port, and
direct to a bucket or drain. Turn the Tank Inlet
Divert Valve to the Bypass or UP position. Open
the Water Supply Valve and put the Emergency
Bypass Valve in the “SERVICE” position. Allow
water to ush through the membrane, displacing
air and preservative, to ow out the Sample/Flush
port to drain for 5-10 minutes.
10. Actuate the Water Quality Monitor and check the
“OUT” or Permeate Water TDS.
11. After the AMS-QT cartridge is purged of air, close
the Sample Port.
12. Check for leaks.
13. Plug in the RP Pump power cord.
Storage Tank Cleaning
If the Storage Tank becomes dirty, regular cleaning
and sanitization may be required. (Request a Storage
Tank Cleaning Guide from OptiPure.) The Tank can be
emptied for cleaning by doing the following:
1. Close the Water Supply Valve
2. Connect 3/8” tubing from the Sample Port on the
Processor to the drain.
3. Open the Sample Port. The RP Pump should operate, pumping water to the drain until the Tank is
nearly empty.
4. Unplug the RP Pump power cord.
5. When nished, close Sample Port, plug in RP
Pump, and open Water Supply Valve.
RP Pump Motor Brushes
Over time or with heavy usage, the motor brushes in
the RP Pump can become worn, causing the Pump to
no longer operate reliably. (See “RP Pump Does Not
Turn On” under Trouble-Shooting for symptoms.) For
a system with heavy usage, it may be necessary to replace motor brushes under a preventive maintenance
schedule, such as annually. To restore a Pump with
worn brushes, order and install Brush Kit 704-39905,
which is supplied with instructions.
Buffer Tank Pre-Charge Pressure
Very slowly over time, the air pre-charge in the RP Assembly Buffer Tank can diminish, reducing the ability
of the Buffer Tank to maintain downstream pressure.
Annually, the pre-charge should be checked using a
tire gauge on the valve, which is on the side or bottom
of the Buffer Tank. If it is lower than 20 psi, air should
be added to restore it to 20 psi.
Trouble-Shooting
ProblemPossible CauseResolution
Running out of water.Valves in incorrect operating position
No power to RP Pump
Operating Pressure reduced
Very cold Feed Water temperature
Low Feed Water Pressure
Demand exceeds system capacity
High Level Float Switch Open
Poor water quality.Blend Valve mis-adjusted
Membrane failure
Short AMS-QT membrane
life.
Short Pre-Filter lifeHeavy sediment loadingAdd FXAF01-12 or -12B for added Pre-Filter protection
Processor Either Does Not
Shut Off or Turn On
Product/Reject Ratio mis-adjusted
Poor Feed Water quality, presence of
iron, silica or non-calcium carbonate
hardness
High Level Float Switch or Solenoid
Valve not functioning
Ensure the Processor Bypass Valve is in Service position, the Repressurization Assy (RP) Tank Divert Valve is in Down position, & Buffer Tank Valve is
Open (handle parallel to valve body).
See “RP Pump Does Not Turn On”
Pre-Filters need to be replaced
Raise water temp to increase production or determine if higher capacity
system is required
Install optional Feed Water Pressure Booster Pump
Determine if the demand is unusual or inconsistent, or resize system
Remove Storage Tank lid and actuate Float Switch up and down
Follow steps to adjust Blending Valve on Page 10
Replace AMS-QT membrane
Measure and adjust the Reject Flow Rate per Page 15-16
Determine Feed Water quality by obtaining a water quality report from city
water supply utility or contact your OptiPure dealer
Remove Storage Tank lid and actuate Float Switch up and down.
Replace High Level Float Switch or Solenoid Valve
BWS350 System Installation, Operation & Maintenance 18
Trouble-Shooting, Continued
Water Quality Monitor will
not turn on
RP Pump
Does Not Turn On
Dead batteriesReplace batteries by sliding Water Quality Monitor up and removing the six
screws on the back cover. Remove cover to access battteries.
No power to Pump (Green LED Off
at top of Control Box - attached to
Buffer Tank bracket)
If LED is On, RP Pump is operational (Pump will turn on only when the Buffer Tank is empty). If LED is Off, ensure power cord is plugged into an outlet
with power (check circuit breaker), & that there is water in Tank. If LED will
not turn On (with power & water in tank), there may be a problem with Low
Level Float Switch or Relay.
Low water level in Tank (Green LED
on Control Box is Off)
RP Pump motor brushes worn
Allow Processor to partially ll Tank with water. Green LED indicates RP
Pump is operational, & will turn on when Buffer Tank is empty.
Try bumping the RP Pump with your hand. If it turns on temporarily, the
brushes are probably worn. Order & install Brush Kit 704-39905.
RP Pump damaged
(Green LED is On, Buffer Tank is empty) If bumping RP Pump yields no
response, Pump could be damaged or brushes may still be worn. Call for
service.
RP Pump runs
intermittently or rough.
RP Pump cycles on-off
frequently
Air trapped in pump head.
RP Pump motor brushes worn
Low air pre-charge in Buffer Tank
(possible on aged system)
Unplug pump temporarily and open downstream valve to empty Buffer Tank.
See “RP Pump motor brushes worn” above.
Empty Buffer Tank and re-charge air pressure to 20 psi.
Electrical Schematic, Low Level Float Switch / RP Pump Circuit
Indicator Lamp
(Illuminated when pump is armed and tank has water in it)
AC
D
F
E
B
A
C
Relay
Heat Sink – Aluminum
1.6"x4.6"x0.125"Thick
RP Pump
4.8 SFA
Low Level
Float Switch
BWS350 System Installation, Operation & Maintenance 19
How to Use Our Push-to-Connect Fittings
Fitting Overview
Fitting Body
Collet/Gripper
(Dark Gray)
To Attach Tubing:
To ease insertion, moisten end of tubing with fresh
water or 3% hydrogen peroxide solution.
Push tubing straight in.
2
Resistance will be felt when the
tubing meets the O ring.
Tubing Preparation
The outside of the tubing must be
free of knicks and gouges.
Cutaway view of tting and tubing
1
Keep pushing until the
resistance is overcome
and the tubing rests
against the stop.
Cut tubing with a plastic tubing cutter or a
razor knife. Make a clean, square cut.
After cutting, make sure the end of the tube is
round. Correct any out of roundness that may have
occured in cutting the tubing.
Tube Stop
O-Ring
3
To Remove Tubing:
Press collet in to release grippers. While holding the collet
in, pull out on the tubing.
It may be necessary to use a partially open crescent wrench
or similar device to hold both sides of the collet in while
pulling the tubing out.
High Level Switch Testing
Switch Test:
Float UP,
Processor OFF
Float DOWN,
Processor ON
Loading...