Installing the burner into the boiler:
1. Install the burner on the side of the boiler
(there should be no shield on the burner, when using the comfort boiler ).
2. Fit the controls either on the cabinet or on the wall.
3. Install the overheating safety cut off into the pocket on the side of the boiler, and connect the
controls so that the overheating safety cut off will cut the power if the boiler overheats.
4. Install the heat sensor on the output flow, either in the pocket or by the sensor on the output
flow. (The sensor must be insulated to the output flow.)
5. Fit the pipe on the drop shaft.
6. Fit the hopper and auger so that the pipe slopes.
(PELLETS MUST NOT GET STUCK IN THE PIPE.)
General guidelines:
The boiler should be installed by an authorized fitter and must
be installed in accordance with work supervision publication 42 ( Danish ) covering equipment working with
water. The outlet duct should be no longer than 1m, and should be fitted with a cleaning door.
The chimney draught should be at least 5 PA and should be stable, a draught stabilizer should always be
installed. If combustion gases condense in the chimney (wet ash) install a draught stabilizer in the chimney,
or open the flue (the flap inside at the back of the boiler) as wide as possible to increase the temperature
of the smoke. The boiler must be spanned with a bypass to ensure the back flow is always kept above
45 degrees.
Manual
NBE pellet system
INSTALLATION GUIDE FOR OPOP / NBE BOILER
Diag. Example of installation
NBE / OPOP 30 S 60 M 80 L
A Height 1142 1272 1272
B Depth 750 896 1003
C Width without burner 513 643 743
D Height smoke pipes 885 997 997
E Height Returns 276 276 283
F Height Output 1030 1161 1154
Smoke tube outer D 130 150 180
Pipe connections 3/4” 1” 1 ¼”
Pipe connections ½” ½” ½”
Weight 250 300 350
Water content 75 105 125
Hole to burner H x B 152x132 180x180 248x248