Omcan Food Machinery SP200A Installation Manual

General Purpose Mixers
Instruction Manual
Version 1.2
3115 Pepper Mill Court, Mississauga, ON, L5L 4X5 4450 Witmer Industrial Estates, Unit 4, Niagara Falls, NY, 14305
1-800-465-0234
www.omcan.com
Table of Contents
Model SP200A / Model SP200AT / Model SP300A / Model SP300AT
Model VFM10B
Section
General Information
Technical Specications
Installation
Operation Instructions
Maintenance
Troubleshooting
-------------------------------------------------------------------------------------------- 4
--------------------------------------------------------------------------------------- 10
------------------------------------------------------------------------------- 3
----------------------------------------------------------------------------------- 10
---------------------------------------------------------------------- 3 - 4
------------------------------------------------------------------------ 5 - 9
Mixer Capacity Chart
Parts Breakdown
Electrical Schematics
Warranty Registration
---------------------------------------------------------------------------- 12 - 17
----------------------------------------------------------------------------- 11
---------------------------------------------------------------------- 18 - 22
---------------------------------------------------------------------------- 23
2
General Information
Omcan Manufacturing And Distributing Company Inc. and Food Machinery Of America, Inc. dba Omcan are not responsible for any harm or injury caused due to any person’s improper or negligent use of this equipment. The product shall only be operated by someone over the age of 18, of sound mind, and
not under the inuence of any drugs or alcohol, who has been trained in the correct operation of this machine, and is wearing authorized, proper safety clothing. Any modication to the machine voids any warranty, and may cause harm to individuals using the machine or in the vicinity of the machine while
in operation.
CHECK PACKAGE UPON ARRIVAL
Upon receipt of an Omcan shipment please inspect for external damage. If no damage is evident on the external packaging, open carton to ensure all ordered items are within the box, and there is no concealed damaged to the machine. If the package has suffered rough handling, bumps or damage (visible or concealed), please note it on the bill of lading before accepting the delivery and contact Omcan within 24 hours, so we may initiate a claim with the carrier. A detailed report on the extent of the damage caused to the machine must be
lled out within three days, from the delivery date shown in the shipping documents. Omcan has no recourse
for damaged products that were shipped collect or third party.
The Omcan Mixers are ideally suited for light to medium production environments. Please review the Capacity Chart on page 11 for production capacities. The Omcan 10 and 20 quart mixers are bench-style mixers that feature a manual bowl lift, a stainless steel bowl with 3 attachments, and a #12 hub, as standard equipment.
The Omcan 30 quart mixers are oor models that feature a manual bowl lift, a stainless steel bowl with 3
attachments, and a #12 hub, as standard equipment. The AT models include a Countdown Timer.
Technical Specications
1. Gear change hand lever.
2. Planetary Shaft.
3. Mixer Attachment.
4. Stainless bowl.
5. Power switch.
6. Bowl lift handle.
7. Safety guard.
8. Support Frame.
9. #12 Hub
10. Internal Safety Switch
11. Safety Switch
12. Overload Reset Button
3
Technical Specications
Speed of Planetary
1st
Speed
Shaft (r/min)
2nd
Speed
3rd
Speed
Overall Dimensions
(mm)
Name
VFM10 10 L 0.5 110V 60 5-15 75 108 195 355 485 x 410 x 635 SP200A 20 L 1.1 110V 60 5-15 90 108 195 355 600 x 600 x 780 SP300A 30 L 1.5 110V 60 5-20 180 91 166 282 700 x 620 x 1200
Bowl
Volume
Power
(KW)
Volts Hertz Nema
Weight
(Kg)
Installation
UNCRATING
Immediately after uncrating the mixer, check for possible shipping damage. If the machine is found to be damaged after uncrating, save all packaging materials and contact the carrier within 3 days of delivery. Failure to contact the carrier or supplier in a timely fashion may cause you a loss.
LOCATION
Prior to installation, test the electrical service to assure that it agrees with the specications on the machine’s
rating plate. Place the mixer on a sturdy and level surface. There should be adequate space around the mixer for the user to operate the controls and to install and remove the bowls. Holes are located in the base to permanently secure the mixer, although this is not necessary in normal installations.
ELECTRICAL CONNECTIONS
The electrical cords on these machines are equipped with a three-pronged grounding plug, which must be connected to a properly grounded receptacle. If the receptacle is not properly grounded, contact an electrician. DO NOT remove the grounding prong from the plug. Electrical and grounding connections must comply with the applicable regulations and local electrical codes.
Check Initial Operation
1. Install the bowl and raise into the mix position, with the bowl support up and bowl safety guard closed.
2. Apply power to the mixer by inserting the cord plug into a properly grounded outlet.
3. Turn the Speed Lever to position 1.
4. Run the machine by pushing the START and then the STOP buttons.
4
Operation Instructions
Warning
Moving agitator in bowl. Keep hands, clothing and utensils out of bowl while in operation. Do not use without interlocked safety guard.
The Omcan mixers are equipped with Standard Safety features. Refer to the diagram on page 3 for an explanation of their functions. The bowl safety guard must be in the closed position or the mixer will not operate. The bowl must be raised and remain in mixing position on bowl support or the mixer will not operate.
1. Standard power supply 110V / 60Hz AC. (Please use a plug with 3 wide contacts and good grounding.)
2. Speed transformation: if you want to change the speed, please turn off the power switch (5) rst, and then pull the gear change hand lever (1) to the position required.
3. Shutting down: when the operation is completed, turn off the power switch (5) rst, then pull the gear
change hand lever (1) to position 1, and lower bowl to load position (6), and nally disconnect the power
supply.
Notes
The power socket must be provided with a good ground wire to guarantee the mixer is grounded properly. There will be an electric shock if there is no ground wire or if it is improperly mounted. Never connect the ground wire to gas pipes, water pipes, lightning rods or telephone lines. Electric leakage should be checked after installation. If the power line is damaged, it must be replaced by the a Service Company.
Do not put your hand into the stirring barrel during operation. Disconnect the power supply before the installation of the mixer.
Do not operate the mixer beyond the time limit to prevent reduction of its service life.
The mixer should be mounted on a stable and clean place, keep it away from heat sources and wet places,
and away from equipment with strong electromagnetic properties.
Keep the machine clean constantly. Disconnect power supply before maintenance. Clean machine with a soft damp cloth. Do not clean it with water spray or use harsh detergents.
On/Off Switch - VFM10B
Features:
1. Standard Controls
1
5
Operation Instructions
On/Off Switch - SP200AT
Features:
1. On Button
2. Off Button
3. Countdown Timer Knob
On/Off Switch - SP200A
Features:
1. On Button
2. Off Button
3
1
2
1
2
On/Off Switch - SP300AT
Features:
1. Separate On and Off Switches
2. Countdown Timer Knob
3. Speed Adjusting Lever with Handle
1
3
6
2
Operation Instructions
On/Off Switch - SP300A
Features:
On Button
Off Button
Speed Adjusting Lever with Handle
1
3
2
Installing Mixer Bowls - All Models
1. Place the bowl on the two arms to keep it in place. Insert the bowl pin into pin support located on frame. Carefully align holes on the bowl with the studs on the bowl arms. (Fig.1)
2. Once the bowl is seated properly, swing the locking levers into position. (Fig.2)
3. To remove the bowl, follow the instructions above in reverse order.
VFM10B / SP200AT / SP200A
Fig.1
7
Operation Instructions
SP300AT / SP300A
Fig.2
Installing Mixer Attachments - VFM10B
Ensure machine is off, lower bowl to loading position. Keep note of the notch on the shaft (Fig.3) and raise the attachment over the shaft. (Fig.4) Turn the attachment to the left until you can turn no more (Fig.5) and release, the attachment should now dip down a bit and lock in place. To Remove the attachment, follow the instructions above in reverse order.
Fig.3
Fig.4 Fig.5
Installing Mixer Attachments - SP200AT / SP200A
Ensure machine is off, lower bowl to loading position. Open the Guard by pulling the handle away from the magnetic latch. (Fig.6) Raise the attachment over the shaft, keeping note of where the notch is. (Fig.7) Guide the notch through the path until it reaches the end and locks. (Fig.8) To remove attachment, follow the instructions above in reverse order.
Fig.6 Fig.7 Fig.8
8
Loading...
+ 16 hidden pages