OLT 10ft X 16ft Breeze Pergola Assembly Manual

Page 1
Revision #10 March 16th, 2018
10ft X 16ft Breeze Pergola
Assembly Manual
Outdoor Living Today
Customers agree to hold Outdoor Living Today and any Authorized Dealers free of any liability for improper installation, maintenance and repair of any Outdoor Living Today products.
local building permit office to determine the correct hardware in your area.
If you plan to paint or stain your Pergola before assembly, be sure to scribe or mark the top edge of Joist where Stub Joists and Ladder Blockings are pre-marked. Painting or staining may cover up markings, making it more difficult to align components later.
In the event of a missing or broken piece, simply call the Outdoor Living Today Customer Support Line @ 1-888-658-1658 within 30 days of the delivery of your purchase. It is our commitment to you to courier replacement parts, free of charge, within 10 business days of this notification. Replacement parts will not be provided free of charge after the 30 day grace period.
Toll Free 1-888-658-1658 www.outdoorlivingtoday.com sales@outdoorlivingtoday.com
Page 1
Page 2
C
A
A
F
D
D
I
E
G
B
H
10X16 BREEZE PERGOLA
6 LADDER SECTIONS
120” OUTSIDE
POST TO POST
192” OUTSIDE
POST TO POST
D
109” Inside
Post to Post
Parts Lists:
Thickness Width Length Qty.
A - Posts 5 1/2” 5 1/2” 108” 6 B - Girder (square cut one end) 1 1/2” 5 1/2” 105” 4 C - Girder (deep notch on bottom) 1 1/2” 5 1/2” 138” 2 D - Joist (shallow notch on bottom) 1 1/2” 5 1/2” 138” 14 E - Stub Joist 1 1/2” 5 1/2” 14 1/2” 16 F - Blocking 1 1/2” 5 1/2” 20 1/4” 48 G - Left Brackets 1 1/2” 5 1/2” 34 3/4” 6 H - Right Brackets 1 1/2” 5 1/2” 34 3/4 6 I - Corner Bracket Post Mount 3/4” 4 1/2” 10 1/2” 12 Post Skirting Kits - 6 Kits / Each includes:
J - Post Skirtings with Cleat 1 1/2” 9” 10” 2 K - Post Skirtings- Dado Cut 1 1/2” 9” 10” 2 L - Post Skirting Caps 1 1/2” 2 1/2” 10 1/2” 4
Thank you for purchasing one of our Breeze Pergola's. Please take the time to identify all the parts prior to assembly.
Specifications:
Wood Species - Western Red Cedar Grade - Architectural Knotty or Better Posts - Laminated Western Red Cedar Lag Screws and Washers - Zinc Plated 4” & 2 1/2” & 2” - Brown Screws 2” Screws - Stainless Steel 2 1/2” Finishing Nails - Stainless Steel
Overall Outside Dimensions:
120” x 192” x 108”high Height (Ground to Bottom of Girder) 94” Post Mounts - Not Included with Kit Recommended Post Mount Simpson Strong Tie - ABU66
Toll Free 1-888-658-1658 www.outdoorlivingtoday.com sales@outdoorlivingtoday.com
Page 2
87 3/4” Inside
Post to Post
96” Outside Post to
Center of Center Post
J
K
L
Page 3
Safety Glasses
Work Gloves
Ladders
Screw Gun/Drill
Tape Measure
Hammer
Wood Clamp
Level
Pliers
Tools Required (Not Provided)
Safety Equipment Required (Not Provided)
1/8” & 1/4” Drill Bits
9/16” Wrench
Toll Free 1-888-658-1658 www.outdoorlivingtoday.com sales@outdoorlivingtoday.com
Page 3
10x16 BREEZE PERGOLA HARDWARE PACKAGE
Square Drive Bit
2 1/2”
4”
2” Stainless
Lag Screw and Washer (24 each)
Wooden Dowel (8)
Hardware Kit (Provided)
Note: screws and nails shown actual size.
2 1/2” SS Finishing Nail
2”
Page 4
Toll Free 1-888-658-1658 www.outdoorlivingtoday.com sales@outdoorlivingtoday.com
Page 4
Laying out your Footprint
To determine the proper placement of your 5 1/2” x 5 1/2” Posts, see the exploded view on Page 2 to find the measurements and to determine their correct positions. Outside Post to Post measurements for the 10’x16’ Breeze are: 120” x 192”. Overall Inside Diagonal Post to Post measurement is 211”. Diagonal Post to inside Center Post (inside to inside) is 140”. Take diagonal measurements to check your layout for square. We recommend that you fix Posts to ground using Steel Post Bases or Saddle Brackets fixed on concrete footing. If attaching Posts to pre-existing deck, we recommend that you purchase Post / Deck Mounting Brackets. In both cases, Post Mounting hardware can be found at most Hardware Stores.
192”
120”
Important - Western Red Cedar Lumber and Timbers will have surface splitting that occurs as lumber seasons and drys to the moisture content in your area. Splitting or “checking”, as it is referred to, can be 1/8” to 1/4” wide and can run several feet. This does not diminish the structural integrity of the material in any way.
211”
Typical Patio Footing Config.
140”
96” to center
1. On flat level ground, position 3 Posts (A) and 2 Girder with
Deep Notches on top and square cut one end (B) as shown.
Position Girder approximately 8” from top of Posts with girder notch flush to outside of post on one end and equally spaced on center post. With a 9/16” Wrench, attach Lag Screws with Washers through pre-drilled holes in Girders. Tighten until snug. Complete 2 sets of Girder/Post Assembly’s. Note; Pilot small hole in Post with 1/4”
drill bit.
Sonotube Form
Post Mount Bracket
5 1/2”x 5 1/2” Post Included.
Concrete Footing
B
B
Girder (B) positioned 1/2 way on Post.
Completed Post/Girder (B) Section.
Use 2 Washers and Lag Screws.
B
Lag Screws with Washers.
13.5”
8”
A
Deep Notch facing up and inside flush with post.
Page 5
Post Hardware
Lift, position and attach the second Post/ Girder section to post hardware.
Deep Notch facing down.
Girders to outside
2. Lift up a completed
Post/Girder Section slowly and carefully. Make sure B-Girders are facing outward.
3. If Post Mount Hardware is
installed, position bottom of Posts in Hardware.
4. Secure Post to Post Hardware with appropriate
hardware such as lag bolts or a sufficient number of screws.(Hardware Not Supplied)
Lag Screws (not included)
5. Locate Girder (C)
and lift into position between both B-Girders. The C-Girder has a deep notch facing down on each end.
Important: you will need the help of 2-3 people while lifting and positioning the completed Post/Side Girder Sections into place.
Toll Free 1-888-658-1658 www.outdoorlivingtoday.com sales@outdoorlivingtoday.com
Page 5
Page 6
E
D
pre-marked for Stub Joist placement
Notches facing down
9. With Stub Joist positioned correctly on Joist,
attach with 2 - 2 1/2” screws. Stub Joists should be flush with top and bottom of Main Joist with all notches facing down.
Lag screw into Pre-Drilled Holes.
Girders flush on top.
6. Carefully slide C-Girder down into notch
of B-Girders. Be careful not to twist the Girder when pushing up into place. Lag Screw with Washers (2) the C-Girder to Post when both pieces are flush with each other.
7. Lift, position and Lag
screw the opposite C-Girder to Posts.
8. On level ground, position 1 Joist (D) and
1 Stub Joists (E). Joists are pre-marked for Stub Joist and Blocking position.
Toll Free 1-888-658-1658 www.outdoorlivingtoday.com sales@outdoorlivingtoday.com
Page 6
Page 7
4” long screws
1 - 4” screw
Completed Joist/ Stub Joist connections.
9. Complete the remaining 7 Stub Joists
aligning and attaching as per Step 8. There are two Joist / Stub Joist Assembly’s, complete both now.
11. Carefully lift up completed Joist/Stub Joist
Assembly and fit notches onto Girder.
12. Attach all Stub
Joists and Joist to Girder with 1 - 4” screw per piece. Complete both assembly’s. Note: Drill pilot holes in Joists and Stub Joists to make it easier to screw in 4” screws.
Toll Free 1-888-658-1658 www.outdoorlivingtoday.com sales@outdoorlivingtoday.com
Page 7
Page 8
F
D
D
Completed Ladder Section
Joists are pre-marked for correct Blocking placement.
2 - 2 1/2” screws per side
13. On a flat surface, position Ladder Blocking (F)
where marked on Main Joist (D) and screw with 2 - 2 1/2” screws per piece. Blocking should be flush with top and bottom of Main Joist with all notches facing down.
14. Complete all 6 Ladder Sections on
the ground prior to moving to Step 15.
15. Carefully lift up one of
the Ladder Sections between Girders. You will require a
helper to assist in lifting Ladder Sections.
Toll Free 1-888-658-1658 www.outdoorlivingtoday.com sales@outdoorlivingtoday.com
Page 8
Page 9
16. Carefully slide Joist notches of Ladder Section
onto Girder. Try to align notches so they fall into place all at once. With notches of Ladder Section all sitting correctly on Girder, slide Section approximately 7” from Post. Check alignment of opposite end of Ladder Section.
Notch slides onto Girder
7”
5 1/2”
Joist should sit flush against Post.
17. Set remaining Ladder Sections in
place for side. Ladder Section adjacent to Middle Post should sit flush against Post. Equally space Middle Ladder Sections.
18. With all Ladder Sections in place,
check once more for equal spacing. When satisfied with Ladder Section positioning, attach to Girders with 4 - 4” screws per Ladder. Screw from top edge of Joist down into Girder. Pilot hole screws first to help with screwing.
Pilot Hole Joist first and secure with 4” screws/ Ladder Section.
5 1/2”
Equally Space Middle Ladder Sections.
Toll Free 1-888-658-1658 www.outdoorlivingtoday.com sales@outdoorlivingtoday.com
Page 9
Page 10
(H) Right Side Bracket
(I) Corner Bracket Post Mounts
Wooden Dowel
20. To assist you with Bracket and Post Mount alignment, both the
end of the Bracket and Post Mount have been drilled for a Wooden Dowel. Wooden Dowels are found in the Hardware Kit Bag. Insert
a Wooden Dowel in end of Bracket first and then push Post Mount onto Dowel until Bracket and Post Mount are flush together. Align Post Mount parallel with Bracket.
19. There are 6 Left (G) and 6 Right Sided
Brackets (H). Corner Bracket Post Mounts (I)
must be attached to the bottom end of each Corner Bracket before attaching to Posts.
Hole
Bracket and Post Mount aligned parallel with each other.
21. With Bracket and Post Mount correctly aligned, screw Post Mount to Bracket with 2 - 2 1/2”
screws. Important: Drill pilot holes in Post Mounts and Bracket to prevent wood from splitting! Complete all remaining Bracket/Post Mount connections.
2 - 2 1/2” screws
Important: Drill pilot holes to prevent wood from splitting.
Toll Free 1-888-658-1658 www.outdoorlivingtoday.com sales@outdoorlivingtoday.com
Page 10
Page 11
22. Lift completed Left Sided Bracket up and align bottom of
Bracket Spacer flush with bottom of Girder. At bottom of Bracket, align Post Mount evenly and tight against Post. When correctly aligned, secure at top with 2 - 4” Screws. To secure Post Mount, use 6 - 2” Stainless Steel Screws. Note: Post Mount and Top of Bracket are pre-drilled.
Bracket Spacer flush with bottom of Girder.
Important: Posts may need to be aligned so they are true and square to mount Corner Brackets correctly. Use a Level to determine correct Post position.
23. Align and attach a Right Sided
Bracket on Post as per Step 22. Make sure both Brackets are aligned on Post at the same height before attaching.
Align Bracket on Post at same height.
Left Sided Bracket
Right Sided Bracket
24. Position and attach Bracket to center post as per Steps 22-23.
Toll Free 1-888-658-1658 www.outdoorlivingtoday.com sales@outdoorlivingtoday.com
Page 11
4” screws countersunk 1/2” below surface.
Page 12
25. Complete both the left and right
Brackets on each remaining center post. Once again, make sure both brackets are centered on post and are the same height as the outside corner brackets.
10 x16 Breeze with all Brackets attached.
Toll Free 1-888-658-1658 www.outdoorlivingtoday.com sales@outdoorlivingtoday.com
Page 12
Page 13
Toll Free 1-888-658-1658 www.outdoorlivingtoday.com sales@outdoorlivingtoday.com
Page 13
26. Locate all Post Skirting pieces. Position 2 post skirtings around the base of post as shown above.
Use 1 Post Skirting with Cleat - 1 1/2” x 9” x 10” (Part J) and a Post Skirting with Dado Cut - 1 1/2” x 9” x 10” (Part K) initially. Cleat piece should be aligned opposite post mount hardware and
dado piece aligned with post mount bolts (hardware).
Post Skirtings with dado cuts - (K)
Post Skirtings with Cleat (J)
27. With your helpers assistance, screw Part J & K pieces together with 2 - 2” screws at pre-drilled
locations. Make sure pieces are aligned on edges and top and bottom. Cleated skirting piece are pre-drilled. Complete remaining skirting pieces around the post. Position skirting unit evenly around post. Secure to post by screwing 1 - 2 1/2” screw into the center of each cleated skirting piece (J).
Post Skirting Caps (L)
Post mount bolts
28. Position Post Skirting Caps - 1 1/2” x 2 1/2” x 10 5/8” (Part L) on top of skirting unit and
against post. Do a dry run first to confirm fit. There will be a small gap between post and inside of cap. Attach caps down into skirting tops with 3 - 2 1/2” Stainless Steel Finishing Nails per piece. Complete remaining post skirtings.
dado cut
Skirting with Cleat (J)
Dado cut skirting(K)
same height
2” screw
2” Stainless Nail
2 1/2” screw
small gap
Page 14
Congratulations on building your 10X16 Breeze Pergola
Note: Our Pergola's are shipped as an unfinished product. If exposed to the elements, the Western
Red Cedar lumber will weather to a silvery-gray color. If you prefer to keep the cedar lumber looking closer to the original color, we suggest that you treat the wood with a good oil based wood stain. You may also wish to paint your new Pergola rather than stain it. In both cases we recommend that you consult with a paint and stain dealer in your area.
Page 14
We value your feedback and would like to hear back from you on how well we are doing in the following areas:
1. Customer Service
2. On Time Shipping
3. Motor Freight Delivery
4. Quality of Materials
5. Assembly Manual
6. Overall Satisfaction.
The materials contained in this Assembly Manual may be downloaded or copied provided that ALL copies retain the copyright and any other proprietary notices contained on the materials. No material may be modified, edited or taken out of context such that its use creates a false or misleading statement or impression as to the positions, statements or actions.
Canadian Address 9393 287th Street Maple Ridge, British Columbia Canada V2W 1L1
United States Address P.O. Box 96 Sumas, Washington USA 98295
Outdoor Living Today
Please call, write or email us at:
Toll Line: 1.888.658.1658 | Fax: 1.604.462.5333 | sales@outdoorlivingtoday.com
Loading...