Carefully read this booklet before installing and using the machine
DOC. N. FM111023
REV. 0
ED. 01.2001
INDEX
Chapter1. Foreword
1.1. Introduction 1-1
1.2. Performances of packaging machine 1-1
1.3. Machine identification 1-1
1.4. Weight and dimensions of packed machine 1-3
1.5. Weight and dimensions of machine 1-3
Chapter2. Installation of the machine
2.1. Transport and positioning 2-1
2.2. Environmental conditions 2-7
2.3. Electrical connections 2-9
Chapter3. Machine adjustment and preparation
3.1. Control of direction of rotation 3-1
3.2. Adjustment 3-5
3.3. Manual and automatic cycle 3-15
3.4. Insertion of film bobbins 3-17
3.5. Conveyor belt adjustment 3-19
3.6. Bobbin support and packaging flat adjustment 3-19
3.7. Execution of 1^ film welding 3-21
3.8. Film coupler on wrapping machine (where expected) 3-23
3.9. Connection and start of smoke exhauster (where
pected)
3.10. Introduction of the product to be packaged 3-27
3.11. Packaging 3-29
Chapter4. Limits and conditions of machine use
4.1. Max. packing sizes 4-1
4.2. Machine operation conditions 4-1
4.3. Items which must not be packaged 4-1
Chapter5. Film characteristics
5.1. Films to be used 5-1
5.2. Calculation of band A 5-1
Chapter6. Safety standards
6.1. Warnings 6-1
Chapter7. Ordinary maintenance
7.1. Precautions for ordinary maintenance interventions 7-1
7.2. Cleaning of sealing blade 7-1
7.3. Plastic film removal 7-3
7.4. Machine cleaning 7-5
7.5. Control of cooling liquid 7-7
7.6. Rubber and Teflon replacement 7-9
7.7. Adjustment of the cams 7-11
7.8. Replacement of sealing blade 7-13
7.9. Wiring diagram 7-15
7.10. Key wiring diagram 7-17
7.11. Spare parts 7-19
7.12. Disassembling, Demolition and elimination of residuals 7-21
Chapter8. Guarantee
8.1. Certificate of Guarantee 8-1
8.2. Guarantee conditions 8-1
Chapter 1
3-25
1.1. Introduction
You have bought a machine with outstanding features and performance and we thank
You very much for Your confidence in choosing it.
The MINIPACK System is the only one of its kind and has achieved worldwide succes
with more than 60000 units operating in the field of packaging and wrapping.It is
handy, low-priced and protected by patents at home and abroad.The technological
concept underling its design, as well as the components and materials used in the
manufacturing and testing process are the best assurance of proper operation and
long-lasting liability.
1.2. Performances of packaging machine
Thanks to its particular operating circuit, it can be used both as a sealing and
shrinking machine or as a plain sealing machine (sealing
only) .In this case it is possible to pack the object in a soft bag without shrinkwrapping.
Technical grade or food grade films with thickness in the range of 15-50 micron can
be used. These products are manufactured and distributed by MINIPACK Torre S.p.A.
The film used in centerfolded execution can be micropunched or not when running
through the micropunches of machine itself. The machine can carry out up to 650
packages/hour.
1.3. Machine identification
In every communication with the manufacturer, always
mention the model and the serial number specified on the
plate on the rear part
of the machine.
1.4. Weight and dimensions of packed machine
a = mm 1415
b = mm 955
c = mm 830
Weight = Kg 192
1.5. Weight and dimensions of machine
a = mm 1570
b = mm 800
c = mm 500
d = mm 1450
Weight = Kg 152
Chapter 2. Installation of the machine
2.1. Transport and positioning
It is recommended to handle with
great care during transport and
positioning!
Cut the strap with scissors (make
sure you protect your eyes by
wearing glasses) and withdraw the
cardboard.
Take away the box (A) which contains
p
the carriage.
Take away the bobbin support (C).
Take away the roller way (B)
Unscrew the 4 fastening screws of the
allet, putting the 4 plates back inside
the machine.
Assembly the carriage.
Lift the machine and position it on the
carriage, paying attention that the 4
foots are properly inserted in their
housings.
To place the roll support (13) follow the
instructions below:
Remove the adhesive tape (A) fixing
the guides trolley.
Place the roll support (13) on the
proper guides.
Stride over the blocking device (B)
through a working tool (for
example a screw driver).
Position the roller way, coupling it to
the conveyor belt.
2.2. Environmental conditions
Place the machine in a suitable environment free from humidity, gases, explosives,
combustible materials.
Woring environmental conditions:
• Temperature from + 5°C to + 40°C
• Relative humidity from 30% to 90%, without condensation
Machine safety factor = IP20
The aerial noise made by the machine is lower than 70dB
2.3. Electrical connections
OBSERVE HEALTH AND SAFETY REGULATIONS!
Before executing the electrical connections, make sur that the mains voltage matches
the ono on the plate on the
rear of machine and that the earthing contact complies with the safety rules in force. In
case of doubts about the mains voltage, contact the local public supply company.
GROUNDING OF THE UNIT IS OBLIGATORY!
Before executing the electrical connections,
make sur that the mains voltage matches the
ono on the plate on the
rear of machine and that the earthing
contact complies with the safety rules in
force. In case of doubts about the mains
voltage, contact the local public supply
company.
Chapter 3. Machine adjustment and preparation
3.1. Control of direction of rotation
Partially extract (about 20 cm) the switch box after having removed the four fastening
screws (A).
Press the push button of contactor KM3 manually and check that the fan rotates
clockwise.
Otherwise invert two of the three phases of the electrical plug.
Before starting the machine operation check the right direction of rotation following these
instructions:
Rotate the general selection switch
on 1-position
Partially extract (about 20 cm) the
switch box after having removed
the four fastening screws (A).
Press the push button of contactor
KM3 manually and check that the fan
rotates clockwise.
Otherwise invert two of the three
phases of the electrical plug.
3.1. Control of direction of rotation
Push the emergency button (8) to get the machine into START position.
Close the switch block again and unlock the emergency button (8) by turning it
towards right.
N.B.: THE CONTROL OF DIRECTION OF ROTATION SHOULD BE CARRIED OUT
EACH TIME YOU CHANGE
THE ELECTRICAL PLUG.
Push the emergency button (8)
to get the machine into
START position.
Close the switch block again and
unlock the emergency button (8)
by turning it towards right.
N.B.: THE CONTROL OF DIRECTION OF ROTATION SHOULD BE CARRIED OUT
EACH TIME YOU CHANGE
THE ELECTRICAL PLUG.
3.2. Adjustment
A-
ELECTRONIC BOARD FEATURES
The machine is equipped with 6 selectionable programs:
Program nr. Program features
P4 - P5 - P6
Each program is composed by 6 variables which can be modified (in case it is not possible
to set one of them, such a variable will obviously not appear on the display) :
Main switch
Sealing warning light
B-
Shrinking warning light
C-
Pause warning light
D-
Belt advancing light
E-
Temperature warning light
F-
Programs selection button
G-
Display
H-
Variables selection switch
I-
Adjusting button
L-
Reset button
M-
Piece counter display
N-
P1
P2
P3
Sealing only
Sealing + shrinking
Sealing + delayed shrinking to sealing end
Sealing + shrinking
Variable Field Field features
1. Sealing
2. Fan delay after sealing
3. Shrinking
4. Belt advancing time
5. Automatic cycle pause time
6. Temperature
The machine is equipped with a piece counter to show on display (N) the number of
sealings.
Such a value can be put to zero at any time through reset button (M).
PHASE NR. 1 = SWITCHING THE MACHINE ON
Turn the main switch (A) into pos. 1. Before using the machine, wait until the adjusting
temperature is reached. This is signalled by the extinction of the warning light (F). The
display (H) turns on and the number of the currently selected program will appear.
PHASE NR. 2 = PROGRAMS
SELECTION
Push button (G) to select the number of the program.
PHASE NR. 3 = VARIABLES
PROGRAMMING
Through button (I) it is possible to look through the variables of the selected program, while
through buttons (L) the memorized values can be modified. Once the value has been set,
push the S button and then release it; the LED of the next function will light up. Set the
value of the variables as previously described. To validate modifications, presso button (I)
until the number of the program appears on the display. The fan delay time after sealing can
be modified; there is not a LED indicating this variable which is shown with an “r” on the left
display, while the right one shows the time which has been set. At the end of all variables to
be adjusted, the display will show the code of the program just chosen (for example P1).
N.B.: In case during programming the FC limit switch is being pressed, the unit quits the
scheduling, the selected program is executed and the display shows the number of the
program.
PHASE NR. 4 =
PERFORMANCE
Once all adjustments have been made, the machine is ready to start working.
In case of “ANOMALY” the display will show as follows:
E 1
Machine has been switched on when the hood was lowered. Lift the hood up.
0 ÷
2.7
0 ÷ 9
0.0 ÷
9.9
0.0 ÷
3.0
0.0 ÷
9.9
00 ÷
99
values expressed in seconds
tenth-seconds values
values expressed in seconds
values expressed in seconds
values expressed in seconds
corresponds to 150.....348°C (2°C each point)-
(medium value 75)
Loading...
+ 26 hidden pages
You need points to download manuals.
1 point = 1 manual.
You can buy points or you can get point for every manual you upload.