Installation Instructions
Model Number 1044-CCOAP3800-B
(877) 867-2312 • www.oberonwireless.com
Rev. 08/30/17 Oberon, Inc. •••• 1315 South Allen Street •••• State College, PA 16801 Copyright 2017
Assembly Components:
- Suspended Ceiling Kit Model 1044-CCOAP asse mbly – 1 each
- Trim with Mounting Bracket – 1 each
- #8-32 x 1/4" Screw – 4 each
- #8-32 x 1/4" M/F Standoff – 4 each
- 1/4" - 20 Wing Nuts – 2 each
- Firestop Grommet – 1 each
- 1" Conduit Connector – 1 each
- Hanger wire – 4 each
If any of these items are missing,
contact your Oberon representative.
Find a flat work surface to assemble
the ceiling kit, access point and
antenna(s) prior to mounting in ceiling.
Step 1 –
Remove any knockouts from
the back box needed for cable egress.
Fasten the conduit connector to the
back box through the now open
knockout (Figure 1).
Step 2 – Remove the ceiling tile and cut an 11" x 9" opening. Be
sure to center the opening along the centerlines of the tile. (Figure
2).
Page 2
Step 3 – Place the t ile back in the ceiling with the
back box and tile bridge over top. Attach the
hanger wires to the f our tabs located on the
corners of the back box and then to a permanent
structure within the ceiling. Slide the cables
through the conduit connector and sna p the
Firestop Grommet over the cables (F igure 3).
Make sure there is enough slack in the cabling to
attach to the access point.
NOTE: A surface mount box (or biscuit jack) and
equipment cord can be conveniently mounted
inside the Model 1044. (Non-plenum rated cables
can be used inside a plenum rated enclosure).
Use an adhesive backed surface mount box.
Consider bend radius of horizontal cable and
equipment cord when attaching the surface m ount
box.
Step 4 – To attach the access point to the trim, first remove
the two hex nuts that hold the aluminum mounting plate to
the painted trim piece. Next attach the Cisco AIR-_BRACKET-2 to the mounting plate using the four (4)
screws provided. The Cisco mounting bracket should be
aligned so t hat the Et hernet jacks of the access point will
face toward the cut out area of Oberon mounting plate
(Figure 4).
Step 5 - Af ter the Cisco mounting bracket has been installed
on the Oberon mounting plate, attach the Cisco 3800 to the
Cisco AIR-BRACKET-2. To finish the trim assembly, reattach the painted trim using the nuts removed in St ep 4.
Page 3
Figure 1 - Conduit Connector Installation.
Figure 2 - Ceiling Tile Cutout.
Figure 4 - AP and Trim Installation.