Oakworks Paper Roll Holder for Treatment Tables User Manual

OAKWORKS® PowerLine & Seychelle
R
PAPER ROLL HOLDER INSTALLATION
Items required: 7/32” Dia. standard drill bit Hand drill Masking tape Ruler 5/32” or 4mm Hex Key Wrench
2”
Step 1
Use masking tape to mark 2” drilling depth.
Step 2
After table is set-up, select position for first bracket to be installed on the outside of table leg on foot end of table.
Part #61624 – Oakworks Paper Roll Holder Kit
paper roll holder bracket (2)
wooden dowel (1)
Step 3
Slide bracket along bottom edge of table side frame until it meets with the existing bolt head. Ensure the dowel rod seat on the bracket is facing inwards.
Step 4
Holding the bracket firmly, drill the bracket mounting hole until the masking tape reaches the bracket.
Step 5
Using the supplied screw & your hex key wrench, secure the paper roll holder bracket into place. Repeat steps 3 thru 5 on the other side of table.
Step 6
Locate the wooden dowel & feed it thru your paper roll. Place one end of the wooden dowel in the hole located in the paper roll holder bracket.
Toll Free: 800.558.8850 Phone: 717.235.6807 www.oakworks.com
Step 7
To secure the wooden dowel on the other side, pull out the paper roll holder bracket slightly & insert the wooden dowel into the hole.
Part no.MMINML0013 rev. O.18.10
Loading...