1. Facility Plumbing (applicable to Libra ordered with plumbing option)
Precautions: When installed in the United States, the plumbing of this table must meet the requirements of any applicable state or local. Plumbing rough in and final hook up should be a performed by a qualified plumber should be approved by a local building/plumbing inspector.
Parts: Two 20” long flexible braided water supply lines with 3/8” male end to interface with the Pedi spa faucet. Two shut off valves connected to facility hot and cold water supply. 1.5” PVC adapters and flexible drain line for connection of tub drain to facility DWV system.
The customer’s facility is to be equipped with the following:
An existing below floor plumbing trap and flexible drain line connection to the Libra Table
located on floor as detailed by illustration shown in these instructions.
Hot and Cold water supply with braided flexible supply lines that will interface to a 3/8” female
compression fitting supplied on the Libra Table.