NuTone 9965 User Manual

INSTALLATION INSTRUCTIONS
READ & SAVE THESE INSTRUCTIONS!
Heat-A-Ventlite
®
(with Night Light)
MODEL: 9965
FOR BEST RESULTS
Installation in an existing, finished building requires an accessible area (attic or crawl space) above the planned location. See “INSTALLATION IN EXISTING CONSTRUCTION.”
Do not install closer than 12 inches to a vertical surface. Do not install over tub or shower enclosure.
UNIT DIMENSIONS
Refer to Figure 1 for housing's dimensions.
NOTE: If there will be a finished second floor above, the Model 9965 housing requires a minimum of 2" x 8" joist construction for mounting.
WIRING AND DUCTWORK
1. Run the required wiring during rough-in stage of
construction.
2. Total connected load: 1730 watts.
3. Plan to run 120vAC, 60 Hz wiring (with ground) on a
separate 20 Amp circuit from a power source, through
the provided wall switch, to the housing's junction box.
See wiring diagram.
4. Use 4" round duct.
INSTALLATION IN NEW CONSTRUCTION
PREPARATION
1. Install hanger bar brackets in slots in housing. (See Fig. 3)
Do not tighten completely to allow bars to be inserted.
2. Refer to Figure 2. Insert hanger bars into brackets.
3. Refer to Figure 3. Slide hanger bar brackets down to end
of slot closest to outside edge of housing. Tighten brackets
in this position.
4. Refer to Figure 4. Remove junction box cover by
removing one screw.
5. Refer to Figure 4. Remove appropriate wiring knockout(s)
and install approved box connector(s).
FIGURE 1
FIGURE 2
FIGURE 3 FIGURE 4
73⁄4"
14"
HANGER BARS
ADJUSTMENT SLOT
JUNCTION BOX COVER
KNOCKOUTS
9
3
⁄4"
MOUNTING THE HOUSING
1. Locate housing between joists.
2. Refer to Figure 5. Using nails, secure hanger bars to joist.
NOTE: The hanger bar brackets are adjustable. Allowing for the thickness of the finished ceiling, mount hanger bars so that edge of housing will be flush with the finished ceiling.
3. Adjust brackets as required. Tighten brackets.
INSTALLING THE DUCTWORK
1. Refer to Figure 5. Install duct collar.
2. Using 4" round duct, connect duct to collar and tape connection.
INSTALLING THE SWITCH
1. Install double-gang switch box in chosen location.
2. Refer to Figure 6. Run wiring and make wiring connections.
3. Use supplied screws to secure switch bracket assembly to switch box.
4. Using supplied screws, secure wall plate to switch bracket.
INSTALLING AND CONNECTING THE WIRING
Refer to Figure 6.
All wiring must comply with local codes and unit must
be properly grounded.
1. Using 12-gauge wire, run 120vAC, 60 Hz wiring (with ground) from a power source to the wall switch location.
The unit must be wired on a separate 20 Amp circuit.
2. Run wiring from switch location to housing as shown in the wiring diagram.
3. Make wiring connections as shown in wiring diagram.
4. Replace junction box cover. Slide slotted hole in cover over screw. Tighten screw securely.
5. Secure wire cover with one screw.
6. Insert heater and ventilator plugs into proper receptacles as shown.
FIGURE 5 FIGURE 7
FIGURE 6
DUCT COLLAR
GRILLE
REFLECTOR
(LENS OMITTED FROM DRAWING FOR ILLUSTRATIVE PURPOSES)
MOUNTING THE GRILLE ASSEMBLY
1. Refer to Figure 7. Place the reflector into the grille.
2. Refer to Figure 8. Insert light plug and night light plug into receptacles.
3. Refer to Figure 7. Using two provided screws, secure grille and reflector to housing.
4. Install 100 watt (maximum) light bulb into light socket.
5. Install 7 watt (maximum) C-7 candelabra type bulb into night light socket.
6. Refer to Figure 9. Snap lens into place.
HEATER JUNCTION BOX
BLK
LIGHT
WHT
WHT
HEATER (WHITE)
RED
VENT
BLU
VENT
LIGHT
SWITCH BOX
NOTE: WHEN THERMOSTAT OR TIMER IS USED, CONNECT AT
T
WHT
BLACK
120vAC LINE
WHT
WHITE
NIGHT LIGHT
HEAT
NIGHT LIGHT
GROUND
BLK
T
Loading...
+ 4 hidden pages