INSTALLATION INSTRUCTIONS
READ & SAVE THESE INSTRUCTIONS!
Heat-Light
Combination
(with Night Light)
MODEL: 9960
FOR BEST RESULTS
In a new construction site, install the housing (complete
with heater) during rough-in construction of the building. The
light assembly and the grille should be installed when the
finished ceiling is in place.
Installation in an existing, finished building requires an
accessible area (attic or crawl space) above the planned
location. See “INSTALLATION IN EXISTING
CONSTRUCTION.”
Do not install closer than 12 inches to a vertical surface.
Do not install over tub or shower enclosure.
UNIT DIMENSIONS
Refer to Figure 1 for housing's dimensions.
NOTE: If there will be a finished second floor above,
the Model 9960 housing requires a minimum of 2" x 8"
joist construction for mounting.
WIRING AND DUCTWORK
1. Run the required wiring during rough-in stage of
construction.
2. Total connected load: 1680 watts.
3. Plan to run 120vAC, 60 Hz wiring (with ground) on a
separate 20 Amp circuit from a power source, through
the provided wall switch, to the housing’s junction box.
See wiring diagram.
INSTALLATION IN
NEW CONSTRUCTION
PREPARATION
1. Loosen hanger bar brackets to allow bars to be inserted.
2. Refer to Figure 2. Insert hanger bars into brackets.
3. Refer to Figure 3. Slide hanger bar brackets down to end
of slot closest to outside edge of housing. Tighten brackets
in this position.
4. Refer to Figure 4. Remove junction box cover by
removing one screw.
5. Refer to Figure 4. Remove appropriate wiring knockout(s)
and install approved box connector(s).
FIGURE 1
FIGURE 2
FIGURE 3 FIGURE 4
73⁄4"
14"
HANGER BARS
ADJUSTMENT
SLOT
JUNCTION
BOX
COVER
KNOCKOUTS
9
3
⁄4"
MOUNTING THE HOUSING
1. Locate housing between joists.
2. Refer to Figure 5. Using nails, secure hanger bars to joist.
NOTE: The hanger bar brackets are adjustable.
Allowing for the thickness of the finished ceiling,
mount hanger bars so that edge of housing will be
flush with the finished ceiling.
3. Adjust brackets as required. Tighten brackets.
INSTALLING THE SWITCH
1. Install double-gang switch box in chosen location.
2. Refer to Figure 6. Run wiring and make wiring
connections.
3. Use supplied screws to secure switch bracket assembly
to switch box.
4. Using supplied screws, secure wall plate to switch bracket.
INSTALLING AND CONNECTING THE WIRING
Refer to Figure 6.
All wiring must comply with local codes and unit must
be properly grounded.
1. Using 12-gauge wire, run 120vAC, 60 Hz wiring (with
ground) from a power source to the wall switch location.
The unit must be wired on a separate 20 Amp circuit.
2. Run wiring from switch location to housing as shown in the
wiring diagram.
3. Make wiring connections as shown in wiring diagram.
4. Replace junction box cover. Slide slotted hole in cover over
screw. Tighten screw securely.
5. Secure wire cover with one screw.
6. Insert heater and ventilator plugs into proper receptacles
as shown.
FIGURE 5 FIGURE 7
FIGURE 6
(LENS OMITTED
FROM DRAWING
FOR ILLUSTRATIVE
PURPOSES)
MOUNTING THE GRILLE ASSEMBLY
1. Refer to Figure 7. Place the reflector into the grille.
2. Refer to Figure 8. Insert light plug and night light plug into
receptacles.
3. Refer to Figure 7. Using two provided screws, secure
grille and reflector to housing.
4. Install 100 watt (maximum) light bulb into light socket.
5. Install 7 watt (maximum) C-7 candelabra type bulb into
night light socket.
6. Refer to Figure 9. Snap lens into place.
GRILLE
HEATER
JUNCTION BOX
SWITCH
BOX
RED
HEATER
(WHITE)
HEAT
T
WHT
GROUND
WHT
WHT
WHITE
120vAC
LINE
LIGHT
NIGHT
LIGHT
NIGHT
LIGHT
LIGHT
BLACK
NOTE:
WHEN THERMOSTAT
OR TIMER IS USED,
CONNECT AT
BLK
BLK
T