NuTone 9093 User Manual

INSTALLATION INSTRUCTIONS
READ & SAVE THESE INSTRUCTIONS!
INSTRUCTIONS D'INSTALLATION
LIRE ET CONSERVER CES INSTRUCTIONS!
Deluxe Heat-A-Ventlite
MODELS: 9093 SERIES
IMPORTANT: DO NOT MOUNT OVER TUB OR IN SHOWER
STALL ENCLOSURE.
NOTE: Cutout dimensions 131⁄4" diameter.
1. Observe all requirements in these instructions and all markings appearing on the unit.
2. Check all operations of the unit after installation has been completed.
3. The housing must be grounded and the installed wiring must
comply with all local electrical codes.
4. The flange of the rough-in housing MUST be flush with the finished plaster or drywall surface to assure proper and safe operation.
5. If plaster material, paint base, or paint is sprayed on the walls or ceiling, the inside of the housing must be masked off to prevent this material from entering the housing.
6. The switch (furnished) should be used and wired in accordance with the wiring diagram.
• For installation in sloped ceilings up to 12/12 pitch.
• Ductwork must point up.
INSTALLATION PREPARATION
1. Remove complete assembly from carton. Loosen screws holding grille and remove the grille.
2. Loosen power unit mounting screws and remove power unit from rough-in housing.
3. Remove tape from back draft damper and be certain the damper opens and closes freely.
MOUNTING TO OPEN JOISTS
Refer to Figure 1.
1. Insert hanger bar on mounting bracket opposite discharge opening and mount rough-in housing to ceiling joists at desired location.
2. Install mounting brackets into slots in housing and adjust housing so flange will be flush to proposed finished ceiling line. Tighten screws securely.
3. Attach 4" round duct and vent to outside through wall or ceiling.
4. Remove junction box cover and desired knockout from junction box in housing.
IMPORTANT: NE PS INSTALLER AU-DESSUS D'UNE
BAIGNOIRE OU AU PLAFOND D'UNE CABINE DE DOUCHE.
PRECAUTIONS POUR L'INSTALLATION
1. Pour obtenir les résultats prévus, observer toutes les recommandations de cette brouchure et tour les signes figurant sur l'appareil.
2. Vérifier toutes les fonctions de l'appareil lorsque l'installation est terminée.
3. Le boîtier de l'appareil de chauffage doivent être reliés à la
terre, et le câblage doit respecter tous les règlements locaux.
4. Le rebord du boîtier d'encastrement DOIT venir à ras du plafond fini pour un fonctionnement absolument sûr et adéquat.
5. Si l'on vaporise les murs ou le plafond de plâtre ou de peinture, l'intérieur du boîtier doit être protégé.
6. L'interrupteur (fourni) doit être utilisé et relié en suivant le schéma de câblage.
• Peut être installé dans des plafonds inclinés avec une pente allant jusqu’à 12/12.
• La gaine doit pointer vers le haut.
PREPARATION DE L'INSTALLATION
1. Retirer l'ensemble complet de l'emballage. Desserrer les vis retenant la grille et l'enlever.
2. Desserrer les vis de montage du bloc-moteur et l'enlever du boîtier d'encastrement.
3. Enlever l'adhésif du registre antirefoulement et s'assurer que rien n'empêche l'ouverture et la fermeture de celui-ci.
MONTAGE AUX SOLIVES
Voir la Figure 1.
1. Insérer la barre de suspension dans la patte de montage opposée à l'ouverture d'évacuation, et monteur le boîtier d'encastrement aux solives à l'emplacement désiré.
2. Installer les pattes de montage dans les fentes du boîtier et l'ajuster de telle manière que le rebord vienne à ras du plafond fini. Bien serrer les vis.
3. Fixer une gaine cylindrique de 4 po pour une évacuation extérieure par lemur ou le plafond.
4. Enlever le couvercle du boîtier de racordement et la prédécoupe voulue.
ADJUSTABLE HANGER BAR (BOITE DE SORTIE DE L'APPAREIL DE CHAUFFAGE)
HEATER OUTLET BOX
NAILING BRACKET (PATTE A CLOUER)
NAILING BRACKET (PATTE A CLOUER)
FIGURE 1
HEATER JUNCTION BOX
YELLOW
BLUE
BLACK
RED
HOUSE WIRING
SWITCH BOX
(REAR VIEW)
HOUSE WIRING
120vAC
LINE
TO HOUSE PANEL BOARD
BLACK
WHITE
GROUND
VENT
LIGHT
HEAT
NIGHT LIGHT
T
WHITE
FIGURE 2
WIRING
1. Refer to Figure 2. Run five (5) wires and ground of
12 gauge from heater's junction box to wall switch.
2. The switch installs in a double-gang outlet box. When a thermostat or timer is used, connect at point marked “T”.
3. Replace junction box cover in heater housing when wiring is complete.
COMPLETING INSTALLATION
1. Refer to Figure 3. Insert hooked hinge on power unit to hanger bracket in rough-in housing.
2. Swing fan and heater unit into place over mounting bracket screws and tighten securely.
3. Plug in fan and heater assembly to receptacle in junction box cover.
4. Refer to Figure 4. Install 100 watt bulb and 7 watt lamp for night light.
5. Mount grille and lens assembly over mounting screws in housing. Tighten securely.
INSTALLATION IN EXISTING CONSTRUCTION
1. Review “WIRING” section of these instructions.
2. Drill a small hole in ceiling in proposed location (locate this hole in attic or crawl space).
3. In attic, mark ceiling for cutout by using the housing as a template. Mark around outside of plaster flange. Make cutout along this line.
4. Connect wires from switch to heater before mounting the housing.
5. Install a header between ceiling joists and nail housing to one joist and header.
NOTE: The two (2) hanger bars (separate pieces) and two mounting brackets (on the housing) are not needed for this type of installation.
6. Install ductwork.
7. Install power unit, light bulbs and grille/lens assembly. Refer to “COMPLETING INSTALLATION”.
NOTE: Please refer to your NuTone catalog for a complete
listing of optional accessory items.
CABLAGE
1. Voir la Figure 2. Acheminer cinq (5) fils et un fil de terre de
calibre 12 du boîtier de raccordement de l'appareil de chauffage à l'interrupteur mural. Raccorder les fils.
2. L'interrupteur s'installe dans une boîte de sortie double. L'orsqu'on utilise un thermostat ou une minuterie, les raccorder au point marqué “T”.
3. Replacer le couvercle de la boîte de raccordement du boîtier de l'appareil de chauffage lorsque le câblage est terminé.
POUR FINIR L'INSTALLATION
1. Voir la Figure 3. Insérer la charnière à crochet du bloc-moteur dans la patte de montage du boîtier d'encastrement.
2. Placer l'ensemble ventilateur/appareil de chauffage sur les vis du support de montage et bien serrer.
3. Brancher le ventilateur et l'appareil de chauffage à la prise se touvant dans le boîtier de raccordement.
4. Voir la Figure 4. Installer une ampoule de 100 W dans la douille du réflecteur, et une ampoule de 7 W comme veilleuse.
5. Monter la grille et le couvercle de lampe à l'aide des vis à insérer dans le boîtier. Bien serrer.
INSTALLATION LORSQUE LE PLAFOND EST FINI
1. Revoir le paragraphe “CABLAGE”.
2. Percer un petit trou au plafond à l'emplacement voulu (localiser ce petit trou au grenier ou sous les combles).
3. Dans le grenier, marquer la découpe en utilisant le boîtier comme gabarit. Tracer la ligne autour de rebord. Découper en suivant cette ligne.
4. Raccorder les fils provenant de l'interrupteur aux fils de l'appareil de chauffage avant de monter le boîtier.
5. Installer un chevêtre entre les solives et clouer le boîtier au chevêtre et à une solive.
REMARQUE: Le deux (2) pièces de la barre de suspension et les deux pattes de fixation (sur le boîtier) ne sont pas nécessaires pour ce type d'installation.
6. Installer la gaine.
7. Installer le bloc-moteur, les ampoules, la grille et le couvercle de lampe. Voir le paragraphe“POUR FINIR L'INSTALLATION”.
REMARQUE: Se reporter au catalogue NuTone pour la liste
compléte des accessoires en option.
FIGURE 3 FIGURE 4
SLOTTED HANGER BRACKET (PATTE DE MONTAGE A FENTE
LIGHT RECEPTACLE (DOUILLE DE LA LAMPE)
NIGHT LIGHT RECEPTACLE (DOUILLE DE LA VEILLEUSE)
KEY-HOLE SLOT (FENTE EN FORME DE TROU DE SERRURE
KEY-HOLE
SLOT
(FENTE EN
FORME DE TROU
DE SERRURE
Loading...
+ 1 hidden pages