Nucraft Tesano Conference Installation Instructions Manual

Tesano Conference Installation Instructions
Before Beginning Installation
Read through the entire instruction thoroughly
A minimum of 2 people are required for this
assembly. For 96” tables and larger it is
These instructions reflect typical assemblies; They
may not match your specific configuration
Note: This table will be assembled right-side up
Tesano | 2
Required Tools & Hardware
Drill Driver
#2- Phillips Bit Laser Level ¼” Allen Wrench
1
2
3
4
5
6
Tesano | 3
Tesano Conference
Tesano | 4
Tesano Exploded
1
2
5
4
6
1. Work Surface
2. Top Beams
3. Mending Plate
4. Base
5. Rail Key
6. Wire Management
7. Power Rail
7
Tesano | 5
Tesano | 6
Step 1
Connecting Rails to Bases
Run glides out of bases
before beginning assembly
Loosen bolts (#6) in the
keys attached to the beam
Insert the beams with rail
keys attached, into each of the bases with the “THIS
SIDE UP” label facing up
and pilot holes facing ground
Use labels to attach correct
beams to correct bases
Tesano | 7
Step 2
Installing Top
Insert pins (hardware #4) into
the holes along the top edge of base end.
Place top onto beams, sliding
one end into the pins
(hardware #4) of one base
Repeat with the base on the
opposite end
Tighten the cams to bring
the two surfaces flush
Make sure the ends match
labels
Tesano | 8
Step 3
Securing Top with Mending Plates
Note:
-Ensure to center sides of top to the bases prior to attaching mending plates
-Square the base up to the top before securing the mending plates
Attach mending plate along
the center of the metal spacer. Pilot holes should be present.
Attach smaller mending plates
in between the edge of the table and the top wood rails.
Tesano | 9
Step 4a
Securing Top Rails
With the mending plates
secured in place, secure the top beams to the wood rails using hardware #5 long silver screws. The pilot holes in the beam should be facing the ground.
Using the cap screws
(hardware #6) shown at right,
insert into side of rail keys
Tesano | 10
Step 4b
Securing Top Rails
Center the top beam between
the base and tighten cap
screws ensuring bottom of
beams are flush with one another
Secure the top beams to the
wood rails using hardware #5 long silver screws. The screws will go through the slotted openings along the face of the
beam
Tesano | 11
Step 5
Fastening Aprons
Locate notch, place in apron
toward end of table
Place the aprons between the
inside of the side rail and the black beam, and fasten them using supplied silver screws (hardware #2). Screws will go
through the aluminum
extrusion.
Tesano | 12
Step 6
Installing Wire Management
Step (1): Attach jumpers to receptacles
Step (2): Run the jumpers around the
table, in a u-shape design. Step (3): At one end of the table, the plug in-feed or hardwire should run through the leg
Jumper
Jumper
Plug-in Infeed
Tesano | 13
Step 7
Installing Wire Management Covers
Locate the wire management
channels.
Ensuring that the power duplex
lines up with the cutout, fasten the wire management channel using silver screws (hardware #1) and black screws (hardware #3).
The label will be facing the top The silver screws (hardware #1)
must be used on the raised surface, while the black screws (hardware #3) should be used on the lower surface
Tesano | 14
Step 8
Installing Power Rail Unit
The power rail unit will
come with two black brackets which should be inserted first into the rail.
The silver bolts should be
inserted into the bracket before inserting into rail.
Place power unit over
screws
Tighten nuts to secure unit
to the rail.
Loading...