NRD Staticmaster P-2001, Staticmaster P-2001/4275, Staticmaster P-2001-I Maintenance Manual

Page 1
Installation / Operation / Maintenance
p
r
r
b
d
a
b
Models P-2001 and P-2001-I, and
Combination Bar Model P-2001/4275
Please Observe the Following
NOTICE:
Please review the information in this manual prior to operating the Nuclestat®in a work environment.
Please keep this document in a convenient place to refer to as a guide
Description
This family of ionizers neutralizes the high static charges developed in materials being
rocessed by providing ionized air to them.
Installation & Operation
1. Remove the protective cover shield by sliding it off either end.
2. Determine a mounting location that will satisfy the following requirements:
A) The ionizer will face the side of the
material that is statically charged.
B) The ionizer will be positioned after the
point where static is developed, e.g., after the last static generating roller o friction point.
C) The distance between the ionizer (i.e.,
Nuclestat® grid or Induction Ba
rushes or points) and the charge material will be pprox.. 1-1/8”(3 cm).
D) No part of the ionizer will contact the
charged material during normal process operations.
E) If the Model P-2001-I is to be
installed, the processed material must pass by the Induction Brushes without contact.
F) If installing more than one ionizer for
single application, the ionizers will not
e positioned directly opposite each other on both sides of the material being processed.
3. Mount the ionizer to a rigid structure in the selected location. Attachment hardware (two #8-32 socket head cap screws) is provided.
4. Ground the ionizer by attaching the eyelet at the free end of the grounding strap to ground potential. (Attachment hardware is not provided). Ensure that the process machinery is also grounded. Verify that the ionizer and machinery are grounded by having them checked by a qualified electrician.
The ionizer is now ready for use.
NRD USA / 2937 Alt Boulevard / PO Box 310 / Grand Island, NY 14072-0310
PHONE 716 773 7634 / FAX 716 773 7744 / EMAIL sales@nrdllc.com / WEB www.nrdllc.com
NRD Asia Pte. Ltd / 114 Lavender Street #08-90 CT Hub 2 Singapore 338729 PHONE +65 6679 1707 / EMAIL sales@NRDasia.com / WEB www.nrdllc.com
INST2001 – 1/19
Page 2
t
r
Maintenance
Maintenance is not required except tha
the Nuclestat® must be kept clean by blowing dry, filtered, compressed air ove its surface.
Calibration is not required.
Trouble Shooting Guide
Symptom Probable Cause Corrective Action
1. Static charges are not eliminated
2. Static charges are eliminated only on one side of the material being
Nuclestat
®
is out of date and
needs replacement
Dirt buildup on the Nuclestat
Nuclestat® or equipment is not properly grounded
Material is in contact with equipment or additional material layers
processed
To ensure maximum static removal
efficiency, the Nuclestat
®
must be replaced annually regardless of use. The replacement date is one year after the date manufactured (printed on each
Nuclestat®). NRD will remind customers of the replacement date.
Call NRD for a replacement Nuclestat®
®
Remove dirt using clean, dry, compressed air
Secure Nuclestat® or equipment to ground potential
Freely suspend material being processed
For additional assistance call NRD Customer Service toll-free at
1-800-525-8076
NRD USA / 2937 Alt Boulevard / PO Box 310 / Grand Island, NY 14072-0310
PHONE 716 773 7634 / FAX 716 773 7744 / EMAIL sales@nrdllc.com / WEB www.nrdllc.com
NRD Asia Pte. Ltd / 114 Lavender Street #08-90 CT Hub 2 Singapore 338729 PHONE +65 6679 1707 / EMAIL sales@NRDasia.com / WEB www.nrdllc.com
INST2001 – 1/19
Loading...