4.1 Notes on the planning of air humidification systems in one area 9
4.1.1 Example 1 (BS10) 9
4.1.1.1 Calculating the maximum humidification capacity 10
4.1.1.2 Determining the device requirements 11
4.1.1.3 Determining the compressed air and water requirements 12
4.2
4.2.1 Example 2 (BS5/10) 13
4.2.1.1 Calculating the maximum humidification capacity 13
4.2.1.2 Determining the device requirements 13
4.1.1.3 Determining the compressed air and water requirements 15
4.3 Notes on the water supply 16
4.3.1 Requirements regarding untreated water (drinking water or tap water) 16
4.3.2 Requirements regarding water treatment 17
4.4 Notes on the compressed air supply 17
4.5 Notes on the run of the tubes 18
5. Installation 18
5.1 Safety notes on installation 18
5.2 General notes on placing 19
5.3 General notes on assembly 20
5.3.1 Atomiser BS5/10 20
5.4 Electrical installation 22
5.4.1 BS5/10 22
Notes on the planning of an air humidification system in several areas 13
5.5 Material specifications 23
5.5.1 Protective tube 23
5.5.2 Air tube and water tube 23
5.5.3 Cables 23
6. Operation 24
6.1 Switching off during daily operation 24
6.1.1 Switching off completely 24
6.1.2 Partial switching-off 24
6.2 Putting into operation in daily operation 25
6.3 Checks 25
25.05.05-A page 2 of 30
Page 3
7. Exchange of components 26
7.1 Atomiser BS5/10 26
8. Technical data 27
8.1 Atomiser BS5/10 27
9. Annex 27
9.1 Accessories / spare parts 27
9.2 hx diagram 28
9.3 Conformation statement 29
25.05.05-A page 3 of 30
Page 4
1. Introduction
1.1 Right at the beginning
Thank you for deciding on the DRAABE air humidification system BS.
The air humidification system BS was constructed according to the present-day state of the art
and the approved safety requirements. Nevertheless dangers may arise for the user and / or
third persons and / or tangible assets may be damaged in case of improper usage of air
humidification systems.
In order to ensure a safe, proper and economical operation, please pay attention to and follow all
specifications and notes on safety contained in this technical documentation.
If you have any queries about matters which are not dealt with in this document, or if you need
more details, please contact your local NORTEC regional distributor, or call our Service
Hotline (+1 613 822 0335). They will be glad to help.
1.2 Notes on technical documentation
Definitions
This technical documentation deals with the DRAABE air humidification system BS in its
construction versions BS5, BS10.
The explanations contained in this technical documentation are limited to:
- the planning of an air humidification system BS.
- the installation, the operation and the maintenance of the air humidification system BS
The technical documentation is supplemented by various separate documentation sheets
(leaflets, order forms, etc.). Relevant cross-references to these publications can be found within
this technical documentation whenever necessary.
Agreement
This symbol marks notes concerning safety and dangers. In case of non-compliance, physical
injuries and / or material damage may be the result. Notes concerning safety and dangers are also
marked with CAUTION.
This symbol marks important notes. These are also referred to by NOTES.
[You find this symbol on the type plates of all devices (atomisers, etc.). It requests you to read through the
technical documentation before performing any action on the system. In the case of ambiguity after
reading through the technical documentation, you are requested to contact the technical customer service
!
of the manufacturer at first before any action is carried out.
25.05.05-A page 4 of 30
Page 5
Storage
Please keep the technical documentation in a safe place where it is always in your reach. If you have
lost the documentation, please contact NORTEC.
Language versions
This technical documentation is available in various languages. Please contact NORTEC in this
connection.
2. For your safety
Agreement on use
The air humidification system BS is exclusively designed for the controlled humidifying of
rooms within the framework of the specified operating conditions in rooms that are not
explosion-endangered. Any other utilisation is regarded as not contractual and may result in
risks caused by the system.
Contractual use also implies observing of all pieces of information contained in this instruction manual (especially the notes on safety) and strictly paying attention to the operation
conditions.
General notes on safety
Only persons who made themselves familiar with the product and who are sufficiently qualified
for the relevant works may install and operate it. Amending the different technical documentation
sheets by means of company-internal directions concerning the responsibility and the obligatory
registration, work organisation, qualification of the personnel, etc. lies within the customer’s
responsibility.
In accordance with chapter 6, the system has to be switched off before starting works on
components of the air humidification system BS and is to be secured against unintended putting
into operation (switch off the control device, shut off the water supply and make the systems
pressure-less).
Pay attention to all local safety regulations:
• Concerning dealing with electric and electronic devices that are supplied from the
mains.
• Concerning the installation of water systems.
Badly maintained air humidification systems may be harmful to health. Therefore it is obligatory
to comply with the intervals of maintenance.
If it is to be assumed that the air humidification system BS cannot be operated without danger
any more, it has to be switched off immediately and to be secured against unintended activation.
This can be the case under the following circumstances:
• if components of the system are damaged
• if the system does not work correctly any more
• if connections or pipes are leaking.
The air humidification system BS is to be operated only within the framework of the specified
operating conditions.
25.05.05-A page 5 of 30
Page 6
- CAUTION! When the air humidification system BS is installed in a room without water
drainage, water level sensors that safely close the water supply in case of a possible leakage
in the water-supply system are to be installed in the room.
- In order to avoid water damage, do not store any materials that can be damaged by water
directly under the atomiser nozzle.
- CAUTION! Danger of corrosion! To avoid dangers, do not store any corrodible components
within the area of the aerosol flow (no rebounding surface for the aerosols).
- CAUTION! Depending on the content of minerals in the pipe water or the treated water
respectively, scale deposits that are more or less pronounced can form. Sensitive materials
and devices have to be protected appropriately or to be moved out of this area.
- Apart from the works described in this direction s, no further interventions have to be carried out on
the air humidification system BS.
- Use only the original accessories and spare parts of NORTEC.
- Without the written consent of NORTEC, no changes may be carried out on the air humidification
system BS.
- In case of changes on the system, an approval carried out by the NORTEC customer service or by
persons authorised by NORTEC has to be carried out previous to the first switching on.
3. Product survey
3.1 System versions BS
The DRAABE air humidification system BS is available in 2 different versions:
- BS5
- BS10
Besides, both systems BS5 and BS10 are absolutely identical, with one single difference. Therefore they
are jointly dealt with in this documentation. The BS5 is fitted with only one nozzle, whereas the BS10 is
fitted with two nozzles. So the only difference is their atomising capacity.
3.1.1 System BS5/10
System description
The system BS mainly consists of atomisers which atomise the water supplied to them into the
air. All system components are integrated into one plastic housing. The atomising nozzles are
assembled firmly onto the upper part of the housing. In addition, every device is fitted with a
hygrostat which measures the relative humidity (indicated in per cent, r.h. in %) in the ambient
air. It compares the measured value with the pre-selected set point and thus controls the device.
25.05.05-A page 6 of 30
Page 7
Individual smaller rooms or large halls can be humidified, depending on the quantity of water that
is available and the length of the hoses. The atomisers are designed for wall mounting and are
delivered in a version that is ready for connection.
Designation Number of nozzles
BS5 1
BS10 2
Max. humidifying capacity
at an atomising pressure of 5 bar (72
1)
psi)
*
5 l/h
*
10 l/h
* Important! This data depends on the setting selected for the device.
Both devices are two-component atomisers. That means that they need both water and
compressed air for atomising.
View of the system BS (the illustration shows the BS10)
Transformer
115VAC/48VAC
Atomiser BS 10
Mounting rail
tap water
Air compressor
Pressure reducer
5 micron filter
Psi
Pressure reducer
Filter, 5 micron
The atomisers are fitted with a UV-C bioreactor.
Water and air systems
Pure water
Compressed air
max 30 PSI
max 105 PSI
open open
closedclosed
++
Required Value
40 50 60
30
70
20
80
rel. humidity %
Pure water atomizer
i
B
Power
Atomizing
PSIPSI
Pure water
Water and air systems
Pure water
Compressed air
max 30 PSI
max 105 PSI
open open
closedclosed
++
Required Value
40 50 60
30
70
20
80
rel. h um i d it y %
m
e
t
s
y
S
e
f
a
S
o
Compressed air
Pure water atomizer
PSIPSI
Pure water
m
e
t
s
y
S
e
f
a
S
o
i
B
Power
Atomizing
Compressed air
Water and air systems
Pure water
Compressed air
max 30 PSI
max 105 PSI
open open
closedclosed
++
Required Value
40 50 60
30
70
20
80
rel. humidity %
Pure water atomizer
S
o
i
B
Power
Atomizing
PSIPSI
Compressed air
Pure water
m
e
t
s
y
S
e
f
a
25.05.05-A page 7 of 30
Page 8
3.2 Functional description
3.2.1 Functional description systems BS5/10
The device is available in two versions. The BS 5 and the BS 10 are controlled by a
hygrostat that is placed in the atomiser head.
The device consists of two components: the wall bracket (1) and the atomiser (2).
The wall bracket consists of the shut-off valves for water (3) and air (4) as well as the supply
lines for water (5), air (6) and operating voltage (7).
The atomiser consists of the set point adjuster (8), the nozzle (9) as well as the LED
indicator lights standby (green) and atomisation (red) (10).
The desired air humidity is pre-selected on the set point adjuster. When the value falls
short of the chosen value, the device switches itself on (LED atomisation emits light).
When the set point is reached again, the device switches itself off.
If the systems BS 5/10 switches itself off, the compressed air supply remains switched
on, also after the water was switched off, for about 1 minute (air-blowing).
The standby indicator lights up as soon as the operating voltage (48Vac) is available on
the device.
NOTE:Maximum inlet pressure water is 3bar (43psi)Maximum inlet pressure air is 6bar (87psi)
Check the pressure values of the manometers
Water 0,2 – 0,4 bar (2.9-5.8psi) (11)
Air 3 – 4 bar (43-58psi)(12)
4
3
89
Water and Air Systems
Pure Water
Max. 3 bar
onon
+
offoff
40 50 60
70
30
20
80
Compressed A ir
Max. 6 b a r
+
11
The atomisers can be
adjusted by means of the
ball-and-socket (13) joint.
1
2
13
12
10
6
5
7
25.05.05-A page 8 of 30
Page 9
4. Basic principles for planning
The basic principles for planning described below are theoretical ones. In practice, the necessary
humidification capacity is influenced by parameters that can not be covered by this documentation.
For this reason, the values that were determined in theory have to be complemented by practical
values or corrected in many cases. Our advisors will be pleased to assist you.
4.1 Notes on the planning of air humidification systems in one area
Proceed as follows when selecting and/or dimensioning the air humidification system BS:
- Determining the volume of the room and the air changes
- Determining the set points (temperature and humidity/relative humidity)
- Determining the humidification areas
- Calculating the maximum humidification capacity
- Defining the device requirements
The chapter below contains all necessary pieces of information on the individual planning steps.
For every planning step, a calculation example based on assumed system data has been
included. The three different examples are supposed to illustrate the procedure. Naturally it is not
possible to cover all applications by means of examples. The air humidification system BS offers a
variety of solutions for individual air humidification in a large variety of rooms .
If you have any further queries or problems, the NORTEC sales team will be glad to help.
Phone:+ 1 613 822 0335
4.1.1 Example 1 (BS10)
In this case, only one room is to be humidified. As every atomiser is fitted with its own hygrostat,
different zones within one area (room) can be humidified individually.
EXAMPLE 1
A DRAABE air humidification system BS for direct room air humidification is to be installed in the
paper store of a large printing works. The following data is available:
Room measurements (l x w x h) in ft: 98.0 x 66.0 x 11.5
Number of air changes per hour: 2.2
Outside air conditions in winter: 5°F/90 % r.h.
Desired room temperature: 70°F
Desired relative air humidity: 53 % r.h.
Areas: One
25.05.05-A page 9 of 30
Page 10
,
4.1.1.1 Calculating the maximum humidification capacity
The maximum humidification output is calculated by the following formulas:
with m and kg with ft and lb
V x 1.2 x LW/h x (x2 – x1)
mH2O=
1
mH2O: Maximum humidification output in kg/h (lb/h)
V: Volume of air to be humidified in m³ (ft^
(formula: L x W x H)
V
: Decrease/increasein volume of air in ft^3/lb
1
AE/h: Number of air exchange cycles per hour
The number of air exchange cycles per hour depends on the usage of the room
and must be determined by the system planner as part of the planning process.
The following guide values can be taken as the basis:
- Textiles processing: 3 -7 AE/h
- Printing works: 2 -5 AE/h
- Warehouses: 1 - 3 AE/h
- Chilled storage: max. 1 AE/h
1.2(1.0): Fixed value for the specific weight of air in kg/m³
A: Fixed value (7,000) for the conversation of pounds in grains in
grains/lb.
x2: Desired absolute humidity of the room air in g/kg (grains/lb)
x1: Minimum absolute humidity before humidification
in g/kg (grains/lb)
NOTES:
Where outside air represents 100 % of the air, the outside air condition in winter must be
applied. If there is an air circulation system (30 % outside air, 70 % recirculated air), the
resultant air mix must be applied.
For the values for x1, x2, x3 and V
NOTES:
The formula takes no account of absorption or discharge of humidity by materials in the
humidified room.
000
refer to the psychometric chart in the appendix.
1
V x 1.0 x LW/h x (X2-X1)
mH2O=
3
)
A x V
CAUTION: This heating-up is ensures by the waste heat of machines in most cases.
SOLUTION EXAMPLE 1
In this example, a humidification capacity of 46 kg/h (101 lbs/h) is required.
In case of questions regarding the calculation of the humidification capacity, please contact NORTEC.
25.05.05-A page 10 of 30
Page 11
A
4.1.1.2 Determining the device requirements
Now the decisive value of the necessary humidification capacity is available for the determination. The
following notes on the capacity of the atomisers provide a second basis.
Capacity BS10 10 Kg/h (22 lbs/h)
EXAMPLE 1
Total water volume (mH2O) = 46 kg/h (101 lbs/h)
Required:
5 units BS10
2 units transformer (trafo)
The tube requirements for air supply and power supply depend on the cable. They are
determined on the basis of the ground plan. The result for this example is approx. 70 meters
(230 ft) of the NORTEC quick assembly kit (SMB). The SMB comes with the necessary cables,
low-pressure tubes and fittings. For further notes on the tube run, please see Chapter 4.3-4.5.
10
20
20
Trafo1
B
15
Trafo2
30
WA
KOM
The solid line stands for power supply, the dotted line for air and water supply.
WA: Water treatment, if necessary
KOM: Compressor
String from A to B Point of distribution
IMPORTANT: Take care not to connect more than 6 BS5/10 to one string when planning the
supply network for the atomisers (water and compressed air). Malfunctions may occur if more
than 6 devices are connected. To prevent this and if required, two further strings must be
created for splitting up the string (see sketch above).
25.05.05-A page 11 of 30
Page 12
4.1.1.3 Determining the compressed air and water requirements
Compressed air requirements
The compressed-air consumption of a system depends on the number of atomisers and is calculated
using the following formula:
QL = nD * 60Nl/min
BS10
30Nl/min
BS5
Q
L: Necessary air volume in Nl/min
D: Number of devices
n
Related to the example and using the following values:
nD = 5
The result is an air volume of 300 l/min.
NOTE:
In order to ensure a trouble-free operation, the compressed-air system ought to deliver 1.2 times
the air volume that has been calculated.
Water requirements
The water requirements of a system depend on the number of atomiser and is calculated using
the following
formula:
QW = nD x 10l/h
QW: Necessary water in l/h
nD: number of devices
Related to the example and using the following values:
nD = 5
The result is a water volume of 50 l/h (110.5 lbs/h).
NOTE:
In order to ensure a trouble-free operation, the water system ought to deliver 1.2 times the
maximum water volume that has been calculated.
25.05.05-A page 12 of 30
Page 13
4.2 Notes on the planning of an air humidification system in several areas
Here we have only one room that is, however, divided up into two areas of humidification. When a room
has areas with different heat loads or when the number of air changes is not identical for the entire
room, the atomisers are not able to deliver sufficient measuring results. Certain areas would be
humidified not sufficiently and others too much. In these cases and similar cases, the room can be
divided up into two areas of humidification.
4.2.1 Example 2 (BS5/10)
The areas of humidification were determined on the basis of the room plan.
EXAMPLE 2
A DRAABE air humidification system BS for a direct humidification of the indoor air is to be installed
in a large printing works. The following data is available (index 1 for area 1, index 2 for area 2):
Room (l x w x h) in ft: 130.0 x 98.0 x 13.0
Area 1 98.0 x 98.0 x 13.0
Area 2 (suspended ceiling) 33.0 x 98.0 x 13.0
Number of air changes per hour: 3.01, 1.52
Outside air conditions in winter: 5°F/90 % r.h.
Desired room temperature: 70°F
Desired air humidity: 53 % r.h.
Areas: Two
4.2.1.1 Calculating the maximum humidification capacity
The calculation is carried out as described under 4.1.1.1.
SOLUTION EXAMPLE 4
For the example area 1, the result is a necessary humidification capacity of 107 kg/h ( 236 lbs/h).
For the example area 2, the result is a necessary humidification capacity of 18 kg/h (40 lbs/h).
4.2.1.2 Determining the device requirements
Capacity BS5 5 kg/h (11 lbs/h)
Capacity BS10 10 kg/h (22 lbs/h)
EXAMPLE 3
For area 1:
8 units BS10
6 units BS5
For area 2:
2 units BS10
4 units transformers (trafo)
25.05.05-A page 13 of 30
Page 14
A
The tube requirements for air and water supply depend on the tube run. It is determined on the basis of the
ground plan. For this example, the result is approx. 160 meters (525 ft) of the NORTEC quick-
assembly kit (SMB). The SMB includes the necessary cables, low-pressure tubes and fittings. For
further information on the tube run, please see Chapter 4.3-4.5.
5
15
202510
30
Trafo( 3)
WA
KOM
10
Trafo(4)
Bs10
Bs5
B’
20
Trafo( 2)
30
Trafo(1)
B
40
The solid line stands for power supply, the dotted line for air and water supply.
WA: Water treatment, if necessary
KOM: Compressor
String from A to B (B’) Point of distribution
IMPORTANT: Take care not to connect more than 6 BS5/10 to one string when planning the
supply network for the atomisers (water and compressed air). Malfunctions may occur if more
than 6 devices are connected. To prevent this and if required, two further strings must be
created for splitting up the string (see sketch above).
25.05.05-A page 14 of 30
Page 15
4.2.1.3 Determining the compressed air and water requirements
Compressed air requirements
The compressed air consumption of a system depends on the number of atomisers.
BS5: 30 Nl/min
BS10: 60 Nl/min
Related to the example and using the following values:
Area 1 = 660 Nl/min
Area 2 = 120 Nl/min
The result is an air volume of 780 Nl/min
NOTE:
In order to ensure a trouble-free operation, the compressed air system ought to deliver 1.2 times
the air volume that has been calculated.
Water requirements
The water consumption of a system depends on the number of atomisers.
BS5 5 l/h (11 lbs/h)
BS10 10l/h (22 lbs/h)
Related to the example and using the following values:
Area 1 = 110 l/h (243 lbs/h)
Area 2 = 20 l/h (44 lbs/h)
The result is an air volume of 130 l/h (287 lbs/h).
NOTE:
In order to ensure a trouble-free operation, the water system ought to deliver 1.2 times the maximum
water volume that has been calculated.
25.05.05-A page 15 of 30
Page 16
4.3 Notes on the water supply
The DRAABE air humidification system is a hygienic system and therefore make particular demands
as far as the water to be atomised is concerned.
The systems can also be operated using untreated source water, but this involves different risks:
- In dependence on the quality of the untreated water, operating safety may be impaired.
- In dependence on the quality of the untreated water, hygiene may be impaired (depends on
the organic contamination of the untreated water).
- In dependence on the quality of the untreated water, a very pronounced mineral precipitation
may occur. These substances contained in untreated water precipitate out of the small
droplets (aerosols) and settle on all surfaces. The functioning of processes and machines
may be impaired and more cleaning needs to be done.
NOTE:
We recommend you to always use a DRAABE water treatment in order to achieve an optimum
result as far as hygiene and operating safety are concerned.
All requirements regarding water preparation listed below are extremely important in order to
ensure a safe, hygienic operation. The operator shall ensure that the following requirements
are met on a permanent basis. They are fulfilled when a DRAABE pure water system is used. It
also has to be subjected to regular checks and maintenance measures at regular intervals as a
matter of course.
Definition of terms:
- Untreated water: This kind of water is water to be subjected to water treatment. This kind of
water has to be treated. Other terms for untreated water are > drinking water, tap water.
- Soft water: see also 4.3.2 . This is water that has been softened.
- Treated water: This kind of water is a product of water treatment. Another term for treated water
is > permeate.
CAUTION: Despite compliance with these requirements, a contamination of the system can not be
excluded. Regular checks carried out by the operator are obligatory in order to avoid damage to
health.
4.3.1 Requirements regarding untreated water (drinking water or tap water)
The operator shall ensure that the following requirements are met on a permanent basis.
- The water must be free of particulates > 5µ.
- The water has to be free from colloids and/or organic substances as a matter of principle.
- Well water and rain water are not admissible.
- The water must have drinking water quality (e.g. quantity of organic substances).
- The maximum number of germs may not exceed 1000 germs/ml.
- It has to be free from chemical substances/additives (e.g. ozone, disinfectants).
- No accessory devices that alter the properties of the untreated water (e.g. dosing equipment)
may be used.
- Water temperature 6-20 °C (43-68°F)
- Flow pressure 2-3 bar (43-58psi)
- Hardness maximum 20°dH (German hardness)
25.05.05-A page 16 of 30
Page 17
NOTE:
If the water hardness is higher then 20°dH (German hardness) it is recommended to use a water
softener. Please contact the Nortec sales man if you have questions.
4.3.2 Requirements regarding water treatment
The operator shall ensure that the following requirements are met on a permanent basis.
- A three-stage water treatment system has to be used
- Demineralisation by reverse osmosis (inorganic membrane)
- Water values at the outlet of the water treatment system
Î Water hardness < 0.1 °dH
Î Conductivity 5-10 µS
Î Water temperature 6-25 °C (43-77°F)
Î Flow pressure 2-3 bar (43-58psi)
- The product has to be conducted in a closed system up to point where it exits the
nozzle and it may not get in contact with the air in the room any time.
- No water tanks with float control may be used. Closed membrane tanks made of stainless steel or
plastic have to be used for intermediate storage of the product (pressure control) instead.
- Fittings and tubes have to be made of materials authorised for the food industry (plastic, stainless
steel). Do not use copper or brass tubes!
- The treated water has to be free from organic substances.
4.4 Notes on compressed air supply
The operator shall ensure that the following requirements are met on a permanent basis.
- The compressed air must have respiratory air quality and be free from contamination
(residual oil content < 0.003 mg/m
- The admissible inlet pressure on the wall brackets is max. 6 bar (without pressure
fluctuations and pressure blows).
- When dimensioning the compressor and/or the outlet pressure, possible losses via the tube
network have to be taken into consideration.
- It is recommended to install a micro filter and an activated carbon filter.
- When an manometer and a pressure-relief device are installed in the compressed air feed, the
performance of the system can be assessed more easily.
- Important! The compressed air line has to be blown out before it is connected.
3
, dust, water, etc.).
25.05.05-A page 17 of 30
Page 18
4.5 Notes on the run of the tubes
- Use a suitable cutting device (e. g. accessory AF-Z-90) guaranteeing a straight and kink-
free cut when cutting the tubes.
- The tubes may not be kinked or damaged (longitudinal grooves).
- Make sure that the tubes are not kinked and that a minimum bending radius of 40 mm
(1.57 inches) is maintained.
- Do not pass the tubes near warm or even hot components (max. admissible ambient
temperature 35°C, 95°F).
- Avoid exposure of the tube to direct sunlight.
- In order to protect them against damage and to prevent them from sagging, the tubes have to
be run between the individual components inside a protective tube, if possible.
- Upon installation, check:
oWhether all tubes sit tight. It is not possible to pull out correctly mounted tubes without
exercising pressure on the clamping ring.
oThe water and compressed air systems for tightness.
- It is recommended to install the network of tubes in the form of a star, if possible. When the distance
between the air supply and the water supply is too large, malfunctions or even problems regarding
hygiene may occur. Always call the NORTEC customer service in case of doubt (+1 613 822 0335).
- An empirical formula for the dimensioning of the network: The last atomiser of a series may be at a
distance of max. 70 metres (230 ft) from the air supply and/or the water supply
5. Installation
5.1 Safety notes on installation
.
- Assembly and installation may only be carried out by authorised, qualified staff (plumbers,
electricians). The person who places the order for the installation has to ensure that they are
qualified accordingly.
- All local rules and regulations on the execution of electrical installations and water installations have to
be complied with.
- It is obligatory to read the notes and regulations of this chapter on the placing of system components,
on assembly and electrical installations and to comply with them.
25.05.05-A page 18 of 30
Page 19
5.2 General notes on placing
The place of installation of a system is always determined during planning and noted in the system
documents. The following general planning notes, however, have to be read and complied with in
any case:
- Make sure that the construction (wall, pillar, ceiling construction, etc.) on which the devices
and/or system components will be mounted disposes of a sufficient load-carrying capacity
and is suitable for fixing (see Chapter 8. “Technical data“).
- Place the atomisers in such a way so as to enable the aerosol mist to spread freely. When the
aerosol mist is prevented from that by obstacles (e.g. ceilings, beams, etc.), build-up and
turbulences that may result in condensation occur.
- In the following illustration, you will find the measurements for the expansion of the aerosol
stream and the minimum distances that have to be kept. The measurements relate to the
maximum humidification capacity of the atomiser nozzles and a room temperature between
18° and 24°C (64 and 75°F). When the temperature is higher, the expansion of the aerosol stream is
reduced, when the temperature is lower, it increases.
- When atomiser nozzles are installed one opposite the other, make sure that the distance of at least
8 m (26 ft) is maintained between the nozzles in order to avoid that the aerosol streams
condensate each.
- Pay attention to the current of the room air. Do not install atomiser nozzles in the immediate
vicinity of an exhaust system or of a cold-air inlet.
- Do not direct atomiser nozzles at cold parts of a building, e.g. outside walls, windows, etc. (risk of
condensation).
- Insulate cold-water pipes in the area of the aerosol stream (risk of condensation).
- The evaporation process absorbs heat from the ambient air. For this reason, make sure that the
aerosol stream is not directed on persons or on places directly above workplaces.
- In order to guarantee an optimum humidification, ensure that the atomisers are sensibly
distributed in the room.
- The system components have to be mounted in such a way so as to provide for enough space
for operation and maintenance.
- Please contact NORTEC in case you have questions on the placement.
25.05.05-A page 19 of 30
Page 20
5.3 General notes on assembly
- Installation has to be carried out according to the general engineering rules and the connection
regulations of the local utility companies.
- Before the installation, check whether the delivery is complete and undamaged, using the delivery
note for this purpose.
- The tubes may only be installed by certified master craftsmen that were instructed on how to
proceed.
- No unauthorised conversions or alterations may be carried out on the devices.
- No additional fittings (e.g. valves, etc.) that are not included in the assembly plan may be installed
in the NORTEC system.
- These assembly instructions only refer to individual systems. The manufacturer provides
individual system diagrams for the customers' systems.
- Furthermore instruction measures on assembly are carried out. The assembly instructions, the
diagrams and the instruction are binding for the execution.
- It is obligatory to comply with the material specifications.
5.3.1 Atomiser BS5/10
Positioning of the atomisers
Min. 0,5m (1.64 ft)
Min. 2,5 m (8.2 ft)
- Select a distance to the ceiling of at least 0.5m (1.64 ft)
- Do not place the atomisers directly above a workplace
- The air space has to be free over a distance of 3-4m
(9.84-13 ft) in an angle of 90°.
- Avoid exposure of the atomisers to direct sunlight.
25.05.05-A page 20 of 30
Page 21
Connection of the wall bracket
All BS devices are connected with the quick assembly kit delivered as accessory.
The connection for treated water is made using the black PU-4 tube (create branch line to the wall
bracket using the enclosed T connectors).
The compressed air tube is connected using the blue PU-9 tube (create branch line to the wall
bracket using the enclosed T connectors).
The power supply from the transformer is connected via junction boxes in the form of a branch line
to the relevant wall bracket. On the junction box, it is run through the cable duct of the wall bracket
and connected to the enclosed plugs. The length of the cables has to correspond to the length of
the tubes.
(1) Protective tube M40
(2) Distributing box
1
(3) Treated water tube PU-4
(4) Compressed air tube PU-9
(5) T connector
(6) Cable HO5 VV-F-2 x 1.5 (16 AWG)
(7) Cable inlet wall bracket
(8) Plug
47 mm
(1.85
inches)
2
3
4
5
6
Water and Air Sy stems
Pure Water
Max. 3 bar
109 mm
4.29 inches
Compressed Air
onon
++
offoff
Max. 6 bar
7
8
25.05.05-A page 21 of 30
Page 22
5.4 Electrical installation
The documentation does not cover the installation of the voltage supply. Requirements
regarding it are covered, however.
CAUTION: The layout of the electrical installation as well as the layout of the voltage supply have
to comply with the local safety regulations and standards.
NOTES on the electrical installation
It is obligatory to run the connecting cables through the cable fittings provided for that purpose
in the device.
CAUTION: The atomisers may only be supplied with 48Vac, 50..60Hz.
5.4.1 BS5/10
The voltage supply for the atomisers BS5/10 is supplied directly to the wall brackets (with a junction
box) via the external safety transformer (see also page 25).
CAUTION: Before and when working on the devices, make sure that all lines are de-energised
and that the voltage supply is secured against unintentional switching on.
NOTE: The transformer ought to be positioned as close as possible to the atomisers in order to
avoid an unnecessary loss of voltage on the lines. You can connect max. 4 atomisers to the supplying transformer.
A special plug is included in the scope of delivery of the wall brackets. Only this plug may be used to
connect the atomisers.
230VAC,50 Hz 48VACV, 50 Hz 2 x 1,5 mm² (16 AWG)
1 phase, zero two wires to the wall bracket (plug)
2 x 2,5 mm² 2 x 2,5 mm²
(14 AWG) (14 AWG)
Fusing: 10A to the first atomizer
TRAFO
BS 5/10: from the transformer to the next atomizer
Use: Voltage supply from domestic mains to external transformer
Description: H05 W-F 2 x 1.5 mm
Fusing (domestic mains): 10A, slow-to-blow
Type 2
Use: From external transformer to atomisers .
Description: H05 W-F 2 x 2.5 mm
Fusing (in transformer): 2.5A, slow-to-blow
²
(16 AWG)
²
(14 AWG)
25.05.05-A page 23 of 30
Page 24
6. Operation
The system may only be taken into operation by the operator or by a person authorised by him
after putting into operation was accepted by the NORTEC customer service or by persons authorised
by NORTEC. Furthermore it is obligatory that the operator has been introduced into operation by
NORTEC. After putting into operation and introduction into operation, the operator is obligated to
ensure that only trained persons operate the system. This is subject matter of the warranty terms
of NORTEC.
6.1 Switching-off during daily operation
For maintenance works, the exchange of defect or to-be-serviced system components or in the
event of faults in the system, it may be necessary to take the system out of operation. Information
on when to switch off is included in more detail in Chapter 7 (see also the exchange instructions
for the individual devices).
CAUTION: When switching off the system, always ensure to prevent an accidental switching-on (water
supply and voltage supply, depending on the type of switching-off). The employees have to be
informed about the switching-off.
6.1.1 Switching-off completely
Here parts of the system or even the entire system are/is de-energised and the water supply is
switched off.
Atomiser BS5/10:
Remove the voltage supply plug from the device. The water supply and/or the compressed air
supply can also be interrupted in addition by removing the quick couplings.
CAUTION: Please note that there is a risk of standstill contamination when it is switched off for a
longer period of time (more than 24 hours) (fresh water automatic system not active). It is obligatory
to inform the NORTEC customer service before switching it off completely.
6.1.2 Partial switching-off
Atomiser BS5/10:
Set the set-point adjuster to 20% r.h. In this case, the fresh water automatic system is still
active.
CAUTION: You can also disconnect the water supply and/or compressed air supply of the
atomisers by removing the quick couplings in order to stop the device from working. This may only
be done in an emergency. Please note that there is a risk of standstill contamination when it is
switched off for a longer period of time (more than 24 hours) (fresh water automatic system not
active).
25.05.05-A page 24 of 30
Page 25
6.2 Putting into operation in daily operation
Depending on whether a partial or complete switching-off was performed, switching-on has to be
performed in reverse order (see also the exchange instructions for the individual devices).
Basically:
Atomiser BS5/10:
First connect the water supply and/or the compressed air supply (quick couplings). Then connect the
voltage supply (plug). Now you can set the set-point adjuster to the desired value again on types BS5
and 10.
6.3 Checks
When irregularities or malfunctions are detected during checks, inform the NORTEC customer
service at once! Checks may only be carried out by authorised staff. The operator is responsible for
checking the suitability of the staff and for instructing them.
6.3.1 Atomiser BS5/10
Check the spray pattern. The ratio water consumption/compressed air consumption has a considerable
influence on the spray pattern. These parameters can be set on the device. Work settings may
never be changed without prior consultation of the NORTECcustomer service.
Cycle: every 2 weeks
CAUTION: This check is necessary because it is possible to prevent damage when a very bad
atomising result is detected in time. The worse the atomising result, the bigger the drops. Drops
falling down may cause damage by corrosion.
In areas with a lot of dust and/or dirt formation, the functioning of the atomisers may be impaired.
Check this and remove the dirt, if necessary.
Deposits on the nozzles may impair the spray pattern. You can try to clean them as follows as an
emergency measure:
De-energise the device and switch off the stopcocks for air and water. Remove the knurled thumb
screw (3) and the air cap. Remove deposits at the tip of the nozzle (1) using a soft, lint-free cloth.
Never use a needle or similar solid objects for cleaning!
1 2 3
Cycle: every 4 weeks
CAUTION: Do not clean with water or any kind of cleaners, but only vacuum it. De-energise the
device and protect against switching on before cleaning.
25.05.05-A page 25 of 30
Page 26
7. Exchange of components
Please notify NORTEC Service if you find a fault in the system.
If there is a question please call +1 613 822 0335.
The exchange is to be made only by instructed, trained personnel. The operator is obliged to make sure
that the personnel is suited, has been instructed and trained as required. He is obligated to comply the
instructions of DRAABE in the process, especially the instructions contained in this documentation.
CAUTION:
Please inform the people working nearby that works will be carried out on the air humidification
system. Make sure that the system cannot be switched on unintentionally.
7.1 Atomiser BS5/10
1. Close the shut-off valves (1) on the wall bracket.
2. Pull off the plug couplings (2) and (3) for compressed air and water. Press down the knurled ring
and then pull out the plug couplings downwards in order to do that.
3. Pull off the plug (4). Loosen the knurled ring on the plug by turning it anti-clockwise and pull out
the plug downwards for that purpose.
4. Remove the atomiser by unscrewing the star knob screw (5) and attach the new atomiser.
5. Connect the new atomiser in reverse order (do not connect the supplying lines crosswise!) Set
the desired set point, for example 50% r. h.) on the hygrostat. Adjust the atomiser by means of
the star knob screw (5).
Compressed Air
Pure Water
Max. 3 bar
on
1
+
offoff
Max. 6 bar
on
+
40 50 60
70
30
80
20
5
2
25.05.05-A page 26 of 30
4
3
Page 27
8. Technical data
8.1 Atomiser BS5/10
BS 5 BS 10
Capacity 5 kg/h
Compressed air requirements 30 Nlm 60 Nlm
Working pressure air / water 3-4 bar/0.2-0.4 bar
Dimensions (w x h x d) in inches 8.26 x 21.7 x 9.84
Weight Approx. 6.06 pounds
Operating voltage 48 VAC, 60 Hz, ±10%
Power input 20W
Overvoltage category II
Pollution degree 2
Application Only inside
Height above sea level 2,000 m (6670 ft)
Ambient temperature 7-35°C (45-95°F)
Ambient humidity Max. 80 %, prevent condensation
*: Depending on the set water / air ratio
*1: factory settings
9. Annex
(11lbs/h)*
10 kg/h
(22lbs/h)*
43-58psi/2.9-5.9psi
1
*
9.1 Accessories/spare parts
Position No of the article Designation of the article