Nordpeis Odense Installation Manual

Page 1
Odense
NO Monteringsanvisning 2
Installation manual 4
GB
Art.no: FP-ODE00-0X0 Last updated: 07.05.2013
Page 2
NB! See separate instructions for the insert
General information
Our surrounds are all made of non-combustible materials. All our inserts/stoves are tested according to the latest European requirements and also to the Norwegian SINTEF standard, which includes particle tests. Several European countries however have individual rules for installation of
inserts, stoves and replaces. You as a client are totally responsible for the fullling of these local
rules concerning the installation in your region/ country. Nordpeis (Northstar) is not responsible regarding correct installation.
You should check local regulations concerning:
• distance from rebox to combustible/ammable
materials
• insulation materials/requirements between replace surround and back wall
• size of oor plates in front of replace/stove if
required
• uepipe connection between rebox and chimney
• insulation requirements if uepipe goes through ammable wall such as a wood wall.
Adjustment
We recommend to stack the surround without glue in order to adjust the insert prior to perforating the chimney
for the ue connection. Use a spirit level to ensure that the surround is mounted straight. The insert will expand
with heat and for this reason the surround must not rest
on the insert. (Above the insert there must be a gap of 3 to 5 mm. Laterally there is no need for gaps, but between the lower part of the insert and the surround there must be a gap of at least 2 mm.)
Floor plate
A reproof oor plate must be put in front of the replace if the oor is of a combustible material.
Acrylic glue
The replace is to be assembled using acrylic glue. Make sure all dust is removed and that the surfaces are clean. When the replace is assembled, use the same acylic glue for lling joints (FIG Z)
Minor damage
The replace can sustain minor damage during transport and handling. This can be repaired with acrylic/light ller. For perfect results, you can ll and sand with a suitable ller. Minor damage and uneven surfaces can be lled. If the damage is deep or in the event of signicant damage, you are recommended to ll repeatedly with tile adhesive or cement putty to avoid sinking. Smooth off with e.g. a damp sponge or a oat.
Fine Fissures
The building material around the replace can move. In new houses in particular, it is common for building materials to settle substantially in the early years. In addition, all concrete elements shrink to a decreasing extent for up to 15 months.
The result is that small cracks may appear in the concrete/masonry.
Use the replace for a few months. If cracks appear, scrape them out with a screwdriver or similar (to provide more space for acrylic joint ller). Vacuum the surfaces to remove any dust. Inject acrylic joint ller and even it out with a spatula or a nger wetted with soapy water. The joint can be painted after a couple of days.
Painting
When the replace has been lled/sanded and the glued joints are dry, the replace is ready to be painted. Use only breathable paint (acrylic) intended for masonry.
Treatment of marble
Clean the plates with mild soapy water and remove any residue of spilled glue. Never use acid/abrasive materials, as this will damage the surface and polishing. It is important to use detergent/sealant that is approved for marble for cleaning and sealing. Scratches in dark marble can be coloured with a pencil. A professional stone centre can help you with different products for surface treatment of the stone.
For your own safety, comply with the assembly instructions. All safety distances are minimum distances. Installation of the insert must comply with the rules and regulations of the country where installed. Nordpeis AS is not responsible for wrongly assembled inserts.
We accept no liability for typographical errors and changes.
Page 3
5
GB
Odense
Insert
S-31A
Steel chimney
Can be installed with steel chimney.
Weight including insert
Odense 253 kg
Floorplate
Please follow the instructions on oorplates in your country.
Illustration (FIG 1) *The illustration indicates the approximate centre height of the hole for the ue. Consider possible inclination of the ue prior to perforating the chimney. Distortions in oors and walls may inuence the height. Dry stack
the replace for accurate height and positioning of the ue/chimney connection. If a fresh air supply set
(accessory) is connected through the oor, mark where the hole should be.
Safety Distances (FIG 2) Ensure that the safety distances are complied with. Please note that these safety distances can vary from country to country.
Assembly instructions (FIG 3 - FIG 16)
FIG 3
Place the base element. Make sure it is level.
FIG 4
Make sure the surface is free of any dust and concrete
residues. Use acrylic glue between the elements and place the upper bottom element.
FIG 5
Lower the concrete pedestal. Make sure all edges are level with the inside of the upper bottom element.
Attention! If the product is placed in a corner and is
to be connected to a fresh air supply, make sure to
prepare for fresh air supply behind the product before placing the insert. Connecting the insert can be done up through the wood compartment. If the product is not connected to a fresh air supply, clog the hole with the added concrete cover and acrylic glue FIG 15.
FIG 6
Adjust the height of the legs as shown in the illustration.
FIG 7
Lift the insert into place. Make sure the insert is level with both sides of the bottom elements.
FIG 8
Makes sure the surface is free of any dust and concrete
residue. Apply acrylic glue and lower the back element into place.
FIG 9
Place the rear radiation shield.
Attention! To utilize the rear connection, make sure
to remove the cut out in the radiation shield FIG 10
FIG 11
Place the front radiation shield.
FIG 12-13
If the product is to be rear connected, make sure to prepare the top element before assembling it FIG 12. Use a concrete drilling tool to remove the concrete in
the desired cut out and carefully sand the remaining
edges.
Makes sure the surface is free of any dust and concrete
residue. Apply acrylic glue and place the top element.
FIG 15
If the product is to be connected to a fresh air supply or a ventilated chimney, keep the hole at the back of the surround open. If not, use acrylic glue and the added concrete cover to clog the hole.
FIG 16
The picture shows how Odense is prepared for Nordpeis ventilated chimney and where to connect a fresh air supply. The top grate is prepared for the air channel accomponying the ventilated chimney.
Once the replace is assembled, ll the joints with acrylic and even them out with a sponge or nger and some soapy water, in order to have a clear indentation between the elements (FIG Z).
Page 4
10 mm
13 mm
24 mm
2.5 mm
4 mm
5 mm
Du trenger følgende verktøy
NO
GB
You need the following tools
3 mm
Page 5
=mm
1790
650
430
1585
1355
700
500
415
210
500
265
240
165
350
155
65
236
215
FIG 1
Page 6
=mm AIR
Page 7
=Brannmur/Brandmur/Turvaetäisyydet/Firewall
=Brennbart materiale/Brændbart materiale/ Brännbart material/ Palavasta materiaalista/Combustible material
FIG 2
>450
>1105
>85
>170
>800
>875
>1035
>85
>550
>600
350*
*Mål for tilkobling pipe
*Measurement chimney connection
Page 8
14
FIG 3
FIG 4
FIG 5 FIG 6
+/-35mm
Acryl
!
Page 9
15
FIG 7 FIG 8
FIG 9
Acryl
FIG 10
Page 10
16
Acryl
FIG 11
FIG 12
FIG 13
A
B
FIG 14
Page 11
17
Acryl
FIG 15
FIG 16
1
2
FIG Z
Page 12
Page 13
19
Page 14
20
Nordpeis AS, Gjellebekkstubben 11, N-3420 LIERSKOGEN, Norway
www.nordpeis.no
Loading...