Nokia Solutions and Networks FXCA-01 Users Manual

Installing the plinth (continued)
Plinth on the pole
1
3
(Note that installations is shown. See the user manual if the pole mounting kit is used.)FPKA VMPB
1. Fix the upper mounting bracket on the pole. Attach the mounting bracket screws (M10) on the bracket. Tighten screws to 30 Nm.
2. Fix one side of the lower pole
30 Nm
20 Nm
mounting bracket on the plinth with mounting screws (M8). Tighten screws to 20 Nm.
2
3. Lift the plinth on the pole and fit it to
20 Nm
4
the mounting screws of the pole mounting bracket. Tighten screws (M8) to 20 Nm.
4. Place the counterpart of the lower pole mounting bracket in its place. Tighten screws (M10) to 30 Nm.
5. If a second plinth is required, install it on the other side of the pole mounting bracket.
5
30 Nm
Check list
Plinth is installed according to instructions. Plinth is level.
4
Grounding principle
Grounding the plinth
6. Ground the plinth to the site main ground.
Note that the length of mounting screws depends on the diameter of the pole. Please see the user manual for details.
6
1. Ground the plinth to the site main ground. Tighten to 8.0-10.0 Nm (5.9-7.37 ft-lb)
to ESD stud
Wrist strap
Check list
Local grounding (earthing) regulations are followed.
Antistatic wrist strap is used when handling modules. Plinth is grounded.
2. Connect the wrist strap.
5
Installing the casings
1
Note:
The casings are pre-installed with back covers. In Earthquake Zone 4, the maximum number of modules for stack installations is five.
In Earthquake Zone 4, install side fixing plates on the casings.
In Earthquake Zone 2, the maximum allowed height for a stack is 22U.
2
In pole and wall installations, the maximum modules per plinth is two. In pole and wall installations, maintenance straps must be installed in the casings. M5 X 8 screws should be secured with thread locking compound in pole and wall installations
4
3
Side fixing plates for Earthquake Zone 4
1. Align the holes of the first casing bottom with the fixing studs on the plinth
2. Push the casing back until it stops.
3. Attach the casing to the plinth with M5 X 8 mm screws (6150279). Tighten to 3.5-4.2 Nm (2.58-3.10 ft-Ib)
4. Install the remaining casings as required by the configuration
Check list
Back covers are properly installed. Fixing screws are tightened.
Optional: In pole and wall installations, maintenance straps are installed in the front covers.
9
Installing the modules
Module installation principle
1
3
2
1. Slide the RF module and the into the casings.System Module
2. Attach the module(s) to the casing with M5 X 25 mm screws. Tighten to 3.5-4.2 Nm (2.58-3.10 ft-Ib).
3. Install the transmission sub-module to the System Module. Tighten to 2.7-3.3 Nm (1.99-2.43 ft-Ib).
4
4. Install the cable entries on both casings with M5 X 10 mm screws (6150240). Torque 3.5 to 4.2 Nm. Note: In pole and wall installations, install the maintenance strap for back covers.
Check list
Module back covers and cable entries are installed. Screws are tightened to the specified torque value.
Note: In pole and wall installations, screws are secured with thread locking compound.