Nicol Scales & Measurement is an ISO Accredited Calibration
Company that has provided calibration, repair and sales of all types
of weighing and measurement products since 1931.
Page 2
™
LoadRunner
OnBoard Weighing System for Roll Off Trucks
Series
Installation & Service
Manual
160913
Page 3
Page 4
Technical training seminars are available through Rice Lake Weighing Systems.
Course descriptions and dates can be viewed at www.ricelake.com/training
or obtained by calling 715-234-9171 and asking for the training department.
Rice Lake Weighing Systems is an ISO 9001 registered company.
Specifications subject to change without notice.
Version 1.0, April 16, 2014
i
Page 5
iiOn-Board Weighing Installation & Service Manual
Rice Lake continually offers web-based video training on a growing selection
of product-related topics at no cost. Visit www.ricelake.com/webinars.
Page 6
Introduction
Important
CAUTION
WARNING
DANGER
WARNING
This manual is intended for use by technicians responsible for installing and servicing LoadRunner Series Onboard
Weighing Systems.
This manual contains instructions for i
nstalling various types of Onboard Weighing Systems (non Legal-for-Trade
systems). For straight trucks, this manual includes rigid under-body mounting instructions in four and six point
configurations, as well as under-body load pin installation instructions for tipping bodies and hoist chassis. Tipping
body installations can be either Lift-to-Weigh or Live-Weigh system types.
Authorized distributors and their employees can view or download this manual from the Rice Lake
Weighing Systems distributor site at
www.ricelake.com.
Safety
Safety Symbol Definitions:
Indicates an imminently hazardous situation that, if not avoided, will result in death or serious injury.
Indicates a potentially hazardous situation that, if not avoided, could result in serious injury or death, and
includes hazards that are exposed when guards are removed.
Indicates a potentially hazardous situation
Indicates information about procedures that, if not observed, could result in damage to equipment or
corruption to and loss of data.
that, if not avoided, may result in minor or moderate injury.
General Safety
Do not operate or work on this equipment unless you have read and understand the instructions and
warnings in this manual. Failure to follow the instructions o
death. Contact any Rice Lake Weighing Systems dealer for replacement manuals.
Proper care is your responsibility.
Failure to heed may result in serious injury or death.
DO NOT allow minors (children) or inexperienced persons to operate this unit.
DO NOT operate without all shields and guards in place.
DO NOT jump on the scale.
DO NOT use for purposes other than weight taking.
DO NOT place fingers into slots or possible pinch points.
DO NOT use any load bearing component that is
DO NOT use this product if any of the components are cracked.
DO NOT exceed the rated load limit of the unit.
DO NOT make alterations or modifications to the unit.
DO NOT remove or obscure warning labels.
Keep hands, feet and loose clothing away from moving parts.
worn beyond 5% of the original dimension.
r heed the warnings could result in injury or
1
Page 7
1.0Considerations Before Installation
WARNING
Important
WARNING
Failure to observe these recommendations and instructions could result in a hazardous
operating condition.
This manual is intended to provide information for the mounting of Onboard Weighing Systems sensors in a
variety of applications. In applying the installation procedures, which follow, some fundamental precautions and
recommendations must be observed by the installer:
• Rice Lake Weighing Systems’ Onboard Scales are design
ed for applications covering a broad range of
vehicle types. Things to take into consideration are:
- Significant variations in mountings
- Variations in load sensor models
- Specifications
- System configurations
• Installation procedures are similar for both new vehicle mountings
and retro-fit mountings. When doing a
retro-fit mounting, ensure that all vehicle structures are free from cracks, excessive wear, corrosion,
alignment problems, etc. that could affect safety and scale performance.
• Load cells, load cell bearing plates, mounting brackets an
d load cell hardware should be painted upon
installation to help protect the installation from corrosion. Industry appropriate, quality enamel paint is
recommended.
- For environments where high concentrations of sa
lts are used on road surfaces, under-body coating is
recommended (3M™ Underseal™ part number 3M-8883 Universal Rubb erized Undercoating).
- Load cells, bearing plates, brackets and hardware shou
ld be periodically inspected for any evidence of
rust or corrosion. If areas of corrosion are present, they should be cleaned with a wire brush and
re-painted or undercoated.
- Load cell connectors must be connected or capped during painting or undercoating.
• The instructions outlined herein are designed to
ensure that a correct installation will provide maximum
safety, optimum system performance and accuracy, a long operating life, and reasonable installation costs. It
is required that the installer comply with all guidelines and material specifications outlined in this manual,
with special emphasis on detail and inspection of work.
• Installation must comply with appropriate
regulations of the U.S. Department of Transport ation (DOT), state
and local regulations, the recommended standards and practices of the Society of Automotive Engineers
(SAE), standards of the American W elding Society (AWS), and the recommendations of the truck, trailer and
body, hoist and/or suspension manufacturer.
1.1Welding Specifications
Welding, metalworking and assembly shou ld only be performed by qualified personnel experienced in welding on
vehicle body structures and sub frames. Only welding equipment of the highest quality should be used in the
welding of load cell bearing plates. When welding, use procedures that ensure high quality welds. Over-welding
may result in distortion and damage, while under welding may not develop adequate strength.
Rice Lake Weighing Systems recommends removal of load cell after tack welding bearing plates in
position so that final welding is performed without load ce
current, or cable damage.
If welding with load cells in position, the installer must ensure that electrical current cannot flow through the load
cell. All load cell terminals must be shorted together. Attach the ground strap directly to the vehicle frame member
to which the bearing plates will be welded. Never weld directly to a load cell.
Always disconnect battery terminals before performing any welding.
2LoadRunner™ Series Installation & Service Manual
ll being subjected to excessive heat, weld
Page 8
2.0Load Pin and Transducer Specification
1, 2
3, 9
7
Battery
4
5
6
8
10
The Rice Lake Roll Off and Dump Truck kits are typically LIFT-TO-WEIGH KITS. This means that with the hoist
in the relaxed state (on the chassis), no weight reading is available. The hoist needs to be elevated to a position
showing the correct angle on the in-cab digital display unit, approximately 4 degrees, for the weight reading
degrees to be valid and accurate.
2.1Onboard Roll Off Kit Parts
Figure 2-1. Onboard System – Roll-Off Kit Illustration
Item No.Part No.DescriptionQty
1131204Pin, Load Roll Off2
2153104Assy, Roll Off Kit1
153098Ring, Roll Off 4 OD x2
153116Nut, Top Lock 1/2-20 NF2
153117Screw, Cap 1/2-20NF x 5”2
3131222Inclinometer, Onboard1
4131200Transducer, Hydraulic1
5131219Indicator, OB3502 Channel1
6131221Cable Assembly Fuse1
7131226Splitter, Cable Y-Splitter1
8131228Cable Assembly 15’ (5M)1
9158196Bracket, Onboard Inclinometer1
10131800Cable Assembly 6’3
Table 2-1. Onboard System – Roll-Off Kit Parts List
Load Pin and Transducer Specification3
Page 9
2.2Load Pins
Electrical
Connector
Double shear load pin
made from heat treated alloy steel
nickel plated for corrosion resistance
fitted with an M12 commercial vehicle class connector
11.8" (300 mm)
2"
(49 mm)
0.79"
(20 mm)
5.5"
(142 mm)
0.79"
(20 mm)
0.5 Ø (14 mm )
Orientation and
Anti-rotation
Reaction
Force
Reaction Force
2.4"
(62 mm)
6.4"
(162 mm)
2"
(53 mm)
Chamfer
0.12"
(3 mm) x 45°
Both Ends
0.4"
(10 mm)
Ø 2" d10 Ø
50.70
50.58
Direction of Load
Direction
of Load
0.4"
(10 mm)
2.5" Ø d10 Ø
63.40
63.28
Electrical
Connector
10.8" (275 mm)
2"
(51 mm)
0.79"
(20 mm)
3.5"
(90 mm)
0.79"
(20 mm)
Direction of Load
0.5 Ø (14 mm ) Hole
Orientation and
Anti-rotation
Reaction ForceReaction Force
2.5"
(64 mm)
4.3"
(110 mm)
3.3"
(86 mm)
Chamfer
0.12"
(3 mm) x 45°
Both Ends
Double shear load pin
made from heat treated alloy steel
nickel plated for corrosion resistance
fitted with an M12 commercial vehicle class connector
Direction
of Load
Hinge pivot and lift cylinder load pins built by Rice Lake Weighing Systems are available in two sizes:
•2 inch diame ter (see Figure 2-2) Dump Truck
•2.5 inch diameter (see Figure 2-3) Roll Off
Full length hinge bars are also available a
Lake Weighing Systems dealer or the factory). All load pins are supplied with collars and bolts with locknuts to
secure pin position. The installer must ensure that all load pin installations can receive required initial and periodic
lubrication.
s direct replacements for tipping bodies with hinge bars (contact a Rice
Figure 2-2. 2 Inch Diameter Load Pin (PN 131207)
Figure 2-3. 2.5 Inch Diameter Load Pin (PN 131204)
4LoadRunner™ Series Installation & Service Manual
Page 10
2.3Pressure Transducer
1.2" A/F
(30 mm)
0.25" (6 mm)
0.31"
(8 mm)
2" (50 mm)
1" Ø
(26 mm)
9/16
"-18 SAE
1.2" Ø
(33 mm)
16' (5 M) if four core cable
with a M12 fully moulded male connector
Material: Stainless Steel
Sealing: Fully welded to IP68
Ø 4.00" (102 mm)
Ø 2.625" (66.675 mm)
1.50"
(38 mm)
0.625"
(16 mm)
Ø 0.530"
(13.5 mm)
2.4Roll Off Collar
Figure 2-4. Oil Pressure Transducer (PN 131211)
Figure 2-5. Roll Off Collar (PN 153098)
Load Pin and Transducer Specification5
Page 11
3.0Roll Off Load Pin Installation
Important
Load
Pins
Inclinometer
Y Cable
Battery
Tran sd uc er
Indicator
Power Cable
Homerun Cable
Note
Remove existing pin and
prepare surface for load
pin installation
Load pins supplied are custom sized to fit the specific hinge and ram brackets of the vehicle. The LoadRunner Roll
Off system is compatible with Galbreath, Accurate and Ruddco. Installation requires removal of existing pins, and
replacements of these pins with Rice Lake load pins and collars.
All load pin installations require lubrication facilities. Normally lubrication is provided through the central
pivot area.
Lake pivots are furnished with drilled and tapped holes for the insertion of a standard lube zirk which
must be supplied and installed by the system installer.
OEM Roll Off pivots typically have existing lubrication fittings included in their pivots. Rice
Figure 3-1. LoadRunner System Layout
3.1Installing the Load Pins
1. Remove the rear fenders from the truck, if required, to gain free and clear access to the pivots.
2. Use jacks or a forklift to support the
pivot pins are being replaced.
3. Remove the bolt and washer from
Removing pivot pins on some vehicles may be difficult if rust is present or if the hoist chassis pivot and the truck
chassis supports are out of alignment. If rust is an issue,
tapping the pivot pin out. Use a pry bar as a lever to assist with any misalignment problems to remove the
existing pivot pins.
4. Push the pivot pins into the frame and out the other side, removing the inside collar as well.
5. Remove the outer collar if still attached
6. Using a power grinder or a wire brush, clean around the
frame.
7. Grind the frame smooth to ensure a cl
8. Remove any debris that is inside and around
rear of the hoist chassis and maintain its position/alignment while the
the outer collar on the pivot.
use a penetrating lubricant and appropriate tools for
to the frame.
hole where the pivot was located, both sides of the
ean weld at load cell installation.
the
holes of the chassis supports and the pivots.
6LoadRunner™ Series Installation & Service Manual
Figure 3-2. Remove Existing Pin
Page 12
9. Using grease, lubricate the hole and insert the load pin into the frame ensuring the strain gauge seals are
Left Rear – Connector should face toward cab.
Right Rear – Connector should face away from
cab
Cab of Truck
Load Pins
Connectors
Note
Collar and bolt
Important
Important
facing toward the front of the truck. The load pins have arrows indicating the downward force, or direction
of load applied to register a positive weight value.
The load pin should extrude from the outside of the frame 4 inches.
Figure 3-3. Install Load Pin
See Figure 2-2 and 2-3 for load pin specifications and load direction.
10. T o install the collar kit, place collar on the load pin aligning the holes and secure with bolt. Pin should go in
from the top and be vertical. Use a small square to ensure the bolt is precisely vertical.
Figure 3-4. Install Collar and Bolt
11. Tack weld the collar to the frame to hold in place.
DO NOT overheat the load pin when tack welding. This may damage the load pin. Do not exceed 140° F.
12. Remove the load pin from the frame.
Load pin should be easily removed by hand. If not, use a wood block (or similar material) to cushion the
load pin, and tap lightly to remove.
Do NOT strike the load pin directly, it may cause damage to the load pin.
13.
Skip-weld the collar to frame with four welds of 1 inch each, is adequate. However if the installer prefers,
the entire collar can be welded in place. Allow collar to cool before proceeding to next step. Ensure there
are no weld remnants inside the collar or pivots. Remove any such residuals.
Roll Off Load Pin Installation7
Page 13
Skip weld collar to frame
Note
Leave access to easily install the bolt and nut that secures the load cell.
1/2-20 x 5”
Screw
Load Pin
Important
Figure 3-5. Skip Weld Collar to Frame
14. Apply grease to each center pivot using existing lubrication points.
15. Reinstall the load pin, lining up the bolt
Do NOT strike the load cell directly, as it may cause damage to the load cell. Use a wood block (or similar
material) to cushion the load cell, and tap lightly. If the
tapping, the holes need to be aligned better, or opened up with a grinder.
hole with the hole in the collar.
load pin does not go in by hand, or with moderate
16. Insert bolt through the top of the collar and secure with nut at the bottom.
Figure 3-6. Insert Load Pin
17. Repeat steps 3 through 16 for the other side of truck.
8LoadRunner™ Series Installation & Service Manual
Page 14
3.2Installing the Inclinometer
Inclinometer Bracket
Hoist Frame
Inclinometer
Important
Note
Inclinometer should be installed on the hoist as close as possible to the load pins. Grind off any paint or rough areas
of the frame.
The inclinometer should be installed on a flat surface that will not interfere with any moving parts on the
frame. It must be installed as level to the frame as possible.
Figure 3-7. Install Inclinometer
Rice Lake Weighing Systems recommends one of the following mounting options, dependant on the type of
truck frame the unit is being mounted to.
Mounting Bracket Option 1
1. Align the mounting bracket to the frame and mark the holes.
2. Set the bracket aside and drill holes
3. Align the bracket with the holes and
Mounting Bracket Option 2
1. Align the mounting bracket to the frame and mark the holes.
2. Weld mounting studs tot he frame
3. Place the bracket on the mounting studs and se
Mounting Bracket Option 3
1. Align the mounting bracket to be level with the frame.
2. Weld around the bracket to secure to frame.
Installing Inclinometer
1. Install the inclinometer to the bracket using the hardware included. The cable connection should be at the
bottom.
in the frame where marked.
secure with bolts, washer and nuts.
where marked.
cure with washers and nuts.
Roll Off Load Pin Installation9
Page 15
3.3Power Cable Connection to Battery
Brown wire to positive
Fuse
Blue wire to negative
Tee Fitting
Reducing Fitting
Transducer
Hydraulic Valve
Important
Note
Figure 3-8. Power Connection to Battery
1. Wire the fuse (5A) to the brown wire.
2. Connect the power cable to the battery.
- Brown wire connects to positive terminal.
- Blue wire connects to ground.
3.4Hydraulic Pressure Transducer
The hydraulic pressure transducer should be installed at the hydraulic control valve.
Figure 3-9. Install Hydraulic Pressure Transducer
1. Remove the hose where the transducer is to be installed.
2. Install a tee fitting to connect the hose to the hydraulic valve.
3. Insert a reducer if required (
4. Run the cable along the frame to the cable access hole in the cab.
transducer
Allow for slack when fitting and securing hydraulic hose lines as these move during normal operation.
) to the opening in the tee where the transducer is to be installed.
9/1
6” straight thread with O-ring is required to fit the Rice Lake pressure
Wire-tie the cable to the frame.
10LoadRunner™ Series Installation & Service Manual
Plan a transducer cabling route that has little or no risk
Use split loom on all exposed cable to protect in areas where damage could be an issue.
of pinching, stretching or melting the cables.
Page 16
3.5Routing Wiring
Important
Note
Load
Pins
Inclinometer
Y Cable
Battery
Tran sd uc er
Indicator
Power Cable
15
’ Cable
6’ Cable
Note
Because each truck is different, cable routing will be specific to the truck the system will be installed on.
Plan a route that has little or no risk of pinching, stretching or melting the cables.
Use split loom on all exposed cable to protect in areas where damage could be an issue.
Wire tie any excess cable to the frame.
For cab-over type truck cabs, all scale system cabling must run around the main pivot point of the cab-over
hinge. For conventional cabs, look for cab access grommets in
For ease of connection, label the cables used in installation prior to threading through the hole into the cab.
1. Connect 6’ ca
bles to the load pins.
2. Connect the load pin cables to the Y cable.
3. Connect 15’ cable and 3’ cable (if
4. Route the 15’ cable along
frame to the indicator through access hole in the cab.
5. Wire tie the cable to the frame
necessary) to the Y cable.
approximately every 18 inches.
6. Follow the same route with the inclinometer cable.
7. Route the power cable from the battery to the
Connecting wiring to the indicator is shown in Section 3.6.
indicator location.
the flooring near the driver seat area.
Figure 3-10. Wiring Diagram
Roll Off Load Pin Installation11
Page 17
3.6Install the Indicator
Panel mount
Roof/under dash mount
Dash mount
Optional Radio DIN mount
0.71 in
(18 mm)
4.00 in
(100.5 mm)
2.50 in
(62.5 mm)
5.71 in
(145 mm)
1.73 in
(44 mm)
5.71 in
(145 mm)
4.80 in
(122 mm)
1.57 in
(40 mm)
2.32 in
(59 mm)
3.54 in
(90 mm)
3.54 in
(90 mm)
Ø 0.25 in (6.5 mm)
holes for u-brackets
0.157 in (4 mm) self taper
0.137 in (3.5 mm) deep
Panel mount holes
Important
Figure 3-11. Indicator Mounting Options
If the indicator will be installed in the cab, choose an area that is easily visible to the driver. A mounting bracket is
provided.
When running cable to the indicator, use existing access hole if available, if not, a hole will need to be
drilled in the cab. Insert a grommet to protect wiring.
Do not allow cable jacket to contact bare metal edges.
12LoadRunner™ Series Installation & Service Manual
Figure 3-12. Indicator Dimensions
Page 18
3.6.1Electrical Wiring and Data Connections
1
3
2
4
5
6
12B1D4FB
T
The indicator is fitted with one Power and one Input Channel connector as standard. CANbus, Channel 2 and RS-232 are optional.
Full connector options are shown below.
Figure 3-13. Rear Panel Identification and Bulkhead Connectors
1
2
3
4
5
6
Input Channel 1, Max +/-39.0625 milli-Volts (Hydraulic Pressure Transducer)
Input Channel 2, Max +/-39.0625 milli-Volts (Load Pin Connection)
Power Input
CANbus digital input & output (Inclinometer Connection)
RS-232 output for printers and data captur
receive)
Alpha-numeric unique indicator serial number, also appears on power-on
POWER & ALARM, socket is MALE – CON 1 on PCB
Pin 1
Pin 2
Pin 3
Pin 4
BROWNVehicle voltageSupply 12V (LCV) or 24V (MCV & HGV)
WHITEOutput 112V or 24V
BLUEGroundGround 0 Volts (common)
BLACKOutput 212V or 24V
3.7Final Installation
1. Reinstall the fenders.
2. T est the hoist to make sure none of the cables at risk
lowered.
3. Test the hoist to make sure the scale reads positively with applied weight. If positive weight is not
displayed, it is possible
that the load pins or a load pin are not in the correct position and reading
backwards. Pin position can be changed by rotating 180 degrees.
of being pinched, stretched or cut when it is raised and
Roll Off Load Pin Installation13
Page 19
4.0Configuration and Calibration
Note
OptionsAlarms
Alarm 1
Alarm 2
Cells
CAN
Diagnostics
Menu
OLED
Info
Display
Split
Input 2
Input 1
Configuration
Span
Zero
Tare
Calibration
Modes
RS-232
PRINTER
Count
1 lb
10 lb
20 lb
50 lb
100 lb
200 lb
INC
ON
OFF
System
PUK
Pin
Clock
Net
Gross
Net & Gross
ON
OFF
Chan
Load
Z/Func
Keyboard
Inhibit
Keyboard
Printer
Printer CSV Data
Printer G PVWS
None
Format 1-4
Scoreboard
Net 4
Gross 4-5
G PVWS
BA4840
4.1User and Setup Menu
The menu structure has two levels of security: an open user menu for driver operators and a password setup menu
for calibrations and options for making changes to the user menu.
The default password is 0350. Keep this for your records.
Figure 4-1. User and Setup Menu – Electrical Wiring and Data Connections
User and Setup Menu
ParameterChoices
DisplayOLED
DiagnosticsCells
AlarmsAlarm 1
Info
CAN
Alarm 2
Table 4-1. User and Setup Menu – Electrical Wiring and Data Connections
Adjust the brightness of the display; High, Med or Low.
Firmware version and serial number display.
To display mV/V for load cells or transducers on seperate channels.
To display CANbus diagnostics (not used).
Allows configuration of audible alarms.
Description
14LoadRunner™ Series Installation & Service Manual
Page 20
Symbols
Keys
M
E
N
U
(OK)
Diagnostics
Alarms
Options
Configuration
Calibration
System
ABCD
E
User and Setup Menu
ParameterChoices
OptionsModesSelect weighing mode to be displayed -
Load/ChanLoad function gives the option to accumulate the amount of load (wei
collected from site.
Channel Function - Split screen function is added to the MENU screen.
RS-232Select or change RS-232 output option.
CountSelect count by in kg - 1, 2, 5, 10, 20, 50, 100, 200,
Z/FuncAllows operator access to Zero/Tare function on the display.
IncFor use with roll off systems and
inclinometer.
ConfigurationInput 1(F)
Input 2 (R)
Split
CAN
CalibrationTa re
Zero
Span
SystemPin
PUK
Clock
Air/Oil pressure transducer or load cell setting on truck type.
Air/Oil pressure transducer or load cell setting on truck type.
Setting varies depending on input 1/input 2 values.
Not Used
Entry of empty vehicle weight for gross weight calculation.
No load zero calibration.
Entry of load for span calibration.
Enter a password.
Not Used.
Change system time and date.
Description
Net. Gross or Net & Gross. See Section 4.6.
ght) delivered or
dump trucks, turn on to calibrate zero degrees of
Table 4-1. User and Setup Menu – Electrical Wiring and Data Connections
The following configuration and calibration instructions require symbols to make selections. When selecting a
symbol, press the corresponding key below the symbol. See
Figure 4-2.
(OK)
Figure 4-2. Symbol Keys
4.2Initial Setup of the OB-350 Indicator
The system password allows access modification of the options: Configuration, Calibration and System Setup
menus. When in the configuration and setup menus, the function keys will perform the following functions:
Figure 4-3. Setup Mode
A
B
C
D
E
Accept or Enter key - enters data
Down arrow key - scrolls down wi
Up arrow key - scrolls up within the menu selection
Carriage Return/Circle - Previous screen or back function
When in a menu function (passwor
Selectable MENU options
thin the menu selection
d) and OK is not visible, use this key as the enter and accept.
Configuration and Calibration15
Page 21
4.2.1Initial Password Entry and Clock Setup
1. Press the power button to power on the indicator.
2. Press the Circle key to enter the menu screen.
3. Use
4. Press
5. Press to select Pin.
6. Press (OK) to display PIN input screen.
7. Enter Password or Pin code,
•Press
•Press
8. When PIN is correct, press
9. Press
or to scroll to System.
(OK).
0 3 5 0, using the following:
or to number 0-9.
to move cursor left.
to enter code.
(OK) to accept PIN.
10. Press
11. To Set PIN, select PIN, press
12. Use
13. Press
to back up to MENU.
(OK) and repeat 2 - 6.
or to scroll to Clock.
(OK).
14. Select the edit key to modify time (military) and date (international)
•Press
•Press
15. When complete, press
or to number 0-9.
to move cursor left.
three times to exit and return to system setup
menu
4.2.2Configuration of Input Channels
1. Scroll to Configuration.
2. Press
3. Press
4. Press
5. Use
6. Press
7. Use
8. Press
9. Use
10. Press
(OK).
(OK) with Input 1 selected.
(OK) again to configure the channel.
or to scroll to Air/Oil Transducer.
.
or to scroll to Input 2.
(OK) again to configure the channel.
or to scroll to load cells.
to return to the system setup menu.
16LoadRunner™ Series Installation & Service Manual
Page 22
4.3Configuration of Count By
Note
Note
The count by value in the division size, in lbs, that the scale will increment by
on the display.
1. Use
or to scroll to Option. Press (OK).
2. Use or to scroll to Count. Press (OK).
3. Use or to scroll to the Count By value. Press .
Selectable count by values are 1, 2, 5, 10, 20, 50, 100 and 200 lbs.
Rice Lake Weighing Systems recommends using 20 lb minimum.
Choosing a lower weight value may cause your weight to fluctuate
may be more difficult.
Example: If 50lb is selected, the weight values will increase by a factor of 50lbs: 50, 100, 150, etc.
on the display and returning to zero weight
4. Scroll to Z/Func: and press (OK).
4.4Configuration of Zero Function
The Zero function setting allows you to turn on and off the zero key when in normal weighing mode.
Selectable zero function settings are:
• Allow Keypad Zero – Activate container tare (Gross Mode) or Zero (Net Mode) button on main menu to
zero load up to 1
When the tare button is pressed in gross mode, the weight will return to the original empty weight tare value.
• Inhibit zero – De-activate operator zero functionality
To set the Zero Function:
100 lbs of weight by the operator.
MENU, select Options.
1. In
2. Press (OK).
3. In OPTIONS menu, select Z/Func.
4. Press
(OK).
5. Use or to scroll to desired option.
6. Press
7. Zero is be added to the
to confirm setting.
MENU screen.
4.5Configuration ofInclinometer Calibration
On dump truck and roll off applications, the load runner system uses the load
pins and hydraulic pressure transducer to determine a weight value. To achieve
the best accuracy, calibrate the system at the same incline that weight will be
read, with +/- 1-2°.
The Inclinometer setup scree
and absolute angle (abs 0.0). For this application, use the level indicators,
which light up for every degree the body is raised.
The numeric value will indicate a negative value as the body is raised, which is
normal. The level
indicators to the right will light up, 1° per circle.
The inclinometer function allows v
to achieve an accurate weight value consistently.
1. Make sure the truck is on a level surface
position.
2. Scroll to
Option, press (OK).
3. Scroll to Inc, press (OK).
4. Use to scroll to ON.
5. Ensure the body is in the down position and the truck is on a level
surface.
6. Press
CAL to zero the inclinometer.
n shows both the body angle in a numeric value
isual determination of the height of the body
and the body is in the down
Configuration and Calibration17
Page 23
4.6Configuration of Modes
Truck Scale
Note
With the inclinometer option turned on, the inclinometer screen is visible by switching display screens when
pressing the menu button.
The display screen will toggle between the following when configured for:
Gross Mode:
Toggles between gross only weight display, inclinome
Net Mode:
Toggles between net only weight display, inclinom
Net and Gross Mode (factory recommended setting):
Toggles between net only weight display, gross only weight display
menu mode.
To set mode:
1. In
MENU, select Options.
2. Press (OK).
3. In OPTIONS menu, select Modes.
4. Press
(OK).
5. In MODES menu, press to toggle between
NET & GROSS
GROSS
NET
ter standard display and menu mode
eter with net weight display and menu mode
, inclinometer with net weight display and
6. Press to confirm setting.
4.7Calibration
Calibration requires the use of a truck scale in order to calibrate the system. First determine the empty vehicle
weight or tare weight of the truck. Once the tare and zero calibration are performed, load the vehicle as close to its
legal maximum limit as possible to determine the span or net weight value used for calibration.
4.7.1Calculating the SPAN (Net Weight)
1. To determine actual TARE weight, drive the empty vehicle onto a truck scale and note the total weight.
Figure 4-4. Vehicle on Truck Scale
2. Load the vehicle as close to its legal maximum as possible.
3. Weigh the loaded vehicle, using the sa
4. Calculate
NET weight using: Gross - Tare = Net.
me truck scale, and record the GROSS vehicle weight.
Prior to calibration, with the display in the Inclinometer/Net Weight or Inclinometer mode raise the body clear of
the chassis (the factory recommendation is three or four de
on span calibration and normal weighing.
18LoadRunner™ Series Installation & Service Manual
grees). Record the bubble indication setting for use
Page 24
4.7.2Enter Tare Weight
lb
lb
lb
lb
lb
Prior to calibration, with the display in the Inclinometer/Net Weight or
Inclinometer mode raise the body clear of the chassis (the factory
recommendation is three or four degrees). Record the bubble
indication setting for use on span calibration and normal weighing.
Note
lb
lb
Note
1. Ensure vehicle is empty, then weigh and record T ARE (empty vehicle)
weight on an accurate truck scale.
MENU screen, select Calibration and press ok.
2. In
3. Select Tar e.
4. Press ok (defaults to 10000).
5. Press
6. Enter vehicle TARE (empty) weight recorded in Section 4.7.1.
edit.
7. Press
8.
Press again to return to MENU screen.
.
4.7.3Set Zero Calibration
1. Make sure the vehicle is on level ground.
Tippers: raise the body clear of the c
four degrees.
2. In
CAL menu, press to select Zero.
3. Press
4. Press
5. Press
ok.
cal.
ok to Confirm Ch 1 Zero.
hassis, approximately three or
6. Press
The Rice Lake Roll Off and Dump Truck kits are typically LIFT-TO-WEIGH KITS. This means that with the hoist in
the relaxed state (on the chassis), no weight reading is available. The hoist needs to be elevated to a position
showi
degrees to be valid and accurate.
to return to CAL menu.
ng the correct angle on the in-cab digital display unit, approximately 4 degrees, for the weight reading
Configuration and Calibration19
Page 25
4.7.4Full Span (Net Load) Calibration
lb
lb
lb
lb
lb
lb
1. Load vehicle to its legal max, record GROSS weight.
2. Weigh and record the TARE (empty) vehicle.
3. Subtract the T ARE weight from the GROSS weight to give
the SPAN (NET) weight.
31900 -12500 =19400 kg SPAN (NET) PAYLOAD
If the vehicle is a tipper, raise the body clear of the chassis.
4. In
CAL menu, press to Span.
5. Press
6. Press
7. Edit the SPAN (NET) weight, as in steps 1 & 2 above.
ok (defaults to 22680 lb).
edit.
8. Press
9. Press
10. Press
11. Press
when done.
cal.
ok to Confirm Ch 1 Span cal.
twice to return to MENU screen.
20LoadRunner™ Series Installation & Service Manual
Page 26
5.0Service and Troubleshooting
WARNING
5.1System Maintenance
This section of the manual is intended to assist the user with techniques for system maintenance and
troubleshooting. Maintenance of the onboard scale can be done quickly and needs to be done at regular intervals.
For service issues make sure you have original
source quickly. Scale meters are built with simple but effective internal system diagnostics programs that isolate
component performance.
With reference to onboar d scale service an
some fundamental precautions and recommendations must be observed by servicing personnel.
Failure to observe these recommendations and instructions could result in a hazardous operating
condition.
• Servicing personnel must ensure that all vehicle structures are free from cracks, excessive wear, corrosion,
alignment problems, etc. that can affect safety and scale performance.
• The instructions outlined herein are designed to ensure
maximum safety, optimum system performance and accuracy, for a long operating life. It is therefore
extremely necessary that the installer comply with all guidelines and material specifications outlined in this
manual, with special emphasis on detail and inspection of work.
• Service and repair work must be in compliance with ap
Transportation (DOT), state and local regulations, the recommended standards and practices of the Society
of Automotive Engineers (SAE), standards of the American Welding Society (AWS), and the
recommendations of the truck, trailer and body, hoist and/or suspension manufacturer.
test numbers to work with, the test numbers help locate a problem
d repair procedures that involve load pins, trunnions and air transducers,
that a properly serviced installation will provide
propriate regulations of the U.S. Department of
5.2Calibration
System calibration needs to be performed at the time of original scale installation. Rice Lake Weighing Systems
recommends that scale calibration be repeated about one month after original scale installation to adjust for any
mechanical influences that "seat" a new scale.
There is no typical interval for scale ca
comparison data of onboard scale loads as compared to weights obtained from certified platform scales or
pre-measured loads. If this is not possible, six-month re-calibration intervals are recommended. See Section 4.7.
libration that can be universally specified. Instead, operators should keep
5.3Sensor Maintenance
5.3.1Load Pins
For hinge load pins, thorough pin lubrication is critical to proper scale performance . Ensure all load pins used in
roll-off and other pin applications are always well-lubricated.
5.3.2Visual Inspection
At the end of each day, service personnel should perform visual inspections that look for:
• Signs of wear or "polishing"
• Signs of weld cracking or failure
• Evidence of excessive corrosion
• Evidence of potential chassis
• Body runner or support structure cracking or bending
When the load pins were originally installed,
rigid and co-planar surfaces for welding. If these surfaces have become cracked, corroded or out of alignment, then
corrective action must be taken to ensure proper performance and safety of the onboard scale installation.
instructions specified that mounting brackets required clean, flat,
Service and Troubleshooting21
Page 27
5.4Cables and Connectors
5.4.1Cables
Inspect for any loosening of cables that might result in exposure to damage. Repair by adding more cable ties to
tighten up the cable run.
5.4.2Connections
Rice Lake We ighing Systems uses special connectors which do not corrode and can withstand extremely cold
conditions. When aluminum connectors are present, especially in environments with high humidity or ro ad salts,
the connectors should be periodically cleaned and protected with plumbers tape. If a connector is severely
corroded, contact Rice Lake Weighing Systems for replacement information.
22LoadRunner™ Series Installation & Service Manual
Page 28
Hardware Warranty Statement
Rice Lake Weighing Systems (RLWS) warrants that all RLWS brand equipment and systems properly installed by
a Distributor or Original Equipment Manufacturer (OEM) will operate per written specifications as confirmed by
the Distributor/OEM and accepted by RLWS. All systems and components are warranted against defects in
materials and workmanship for two (2) years, unless otherwise stated.
RLWS warrants that the equipment sold hereunder will conform to the current written specifications authorized by
RLWS. RLWS warrants the equipment against faulty workma nship and defective mate rial s. If any equipment fails
to conform to these warranties, RLWS will, at its option, repair or replace such goods returned within the warranty
period subject to the following conditions:
Upon discovery by Buyer of such non-conformity, RLWS will be given prompt written notice with a detailed
explanation of the alleged deficiencies.
Individual electronic components returned to RLWS for warranty purposes must be packaged to prevent
electrostatic discharge (ESD) damage in shipment. Packaging requirements are listed in a publication, "Protecting
Your Components From Static Damage in Shipment," available from RLWS Equipment Return Department.
Examination of such equipment by RLWS confirms that the non-conformity actually exists, and was not caused by
accident, misuse, neglect, alteration, improper installation, improper repair, or improper testing. RLWS shall be the
sole judge of all alleged non-conformities.
Such equipment has not been modified, altered, or changed by any person other than RLWS or its duly authorized
repair agents.
RLWS will have a reasonable time to repair or replace the defective equipment. Buyer is responsible for shipping
charges both ways
In no event will RLWS be responsible for travel time or on-location repairs, including assembly or disassembly of
equipment. Nor will RLWS be liable for th e cost of any repairs made by others.
Installer is completely responsible for the design and fitting of the installation, and any changes which might result
in voidance of the warranty of the manufacturer of equipment to which the products are installed.
THESE WARRANTIES EXCLUDE ALL OTHER WARRANTIES, EXPRESSED OR IMPLIED,
INCLUDING WITHOUT LIMIT ATION WARRANTIES OF MERCHANT ABILITY OR FITNESS FOR A
PARTICULAR PURPOSE. NEITHER RLWS NOR DISTRIBUTOR WILL, IN ANY EVENT, BE LIABLE
FOR INCIDENTAL OR CONSEQUENTIAL DAMAGES.
RLWS AND BU YER AGREE THAT RLWS' SOLE AND EXCLUSIVE LIABILITY HEREUNDER IS
LIMITED TO REPAIR OR R EPLACEMENT OF SUCH GOODS. IN ACCEPTI NG THIS WA RRANTY,
THE BUYER WAIVES ANY AND ALL OTHER CLAIMS TO WA RRANTY.
SHOULD THE SELLER BE OTHER THAN RLWS, THE BUYER AGREES TO LOOK ONLY TO THE
SELLER FOR WARRANTY CLAIMS.
No terms, conditions, understanding, or agreements purporting to modify the terms of this warranty shall have any
legal effect unless made in writing and signed by a corporate officer of RLWS and the Buyer.