ASSEMBLY INSTRUCTIONS
The Devonshire Arbor
85 in
84 in
49 in
Please read through before starting assembly.
IMPORTANT: CHECK THE INSIDE OF YOUR POSTS FOR ALL MATERIALS.
Check Box for These Contents
In the event of missing or defective parts please call our customer service dept. at
1. Rafter End Caps (20)
2. Arch Rafters (10)
3. Arches (4)
4. Arch Couplers (4)
5. Post Trims (4)
6. Keystone Cap (2)
7. Keystone Body (2)
8.
Side Panel Curved Top-Rails
Side Panel Vertical Spindles - 52.75
9.
10. Side Panel Vertical Spindles - 51.5 in (4)
11. Side Panel Vertical Spindles - 51 in (2)
12. 1 3/4 in square
13. Side Panel Middle Rail (2)
14. Posts (4)
15. 2 in x 3.5 in Brackets (4)
Side Panel Bottom Rails
16.
17.
3/4
in
Stainless Steel Screws
in
18. 1 1/2
19.
3 in
20.
Tubes of Vinyl Glue
Stainless Steel Screws
Stainless Steel Screws
brackets
(2)
(2)
(4)
(4)
(2)
(32)
(16)
(36)
Material You Will Need (Not Included)
• 4 in x 4 in x 8 ft Pressure Treated Lumber (4)
Tools You Will Need
• Hammer
• Tape Measure
• Level
• Stool or Short Ladder
• Shovel or Auger
• Cordless Drill
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
59 in
1 800 282 9346, ext #20 (Mon. to Fri. 8:00 AM to 4:00 PM EST).
www.newenglandarbors.com
84 in
11 in
24.5 in
25.5 in
General Information
•
Read Instructions through carefully before beginning assembly.
• When assembling components, place on a non-abrasive surface
(i.e. shipping box) to avoid scratching.
• We recommend an area approx 10’x 8’ for unobstructed assembling.
• You should not need to use excessive force when assembling components.
17
18
19
(Not to scale)
20
Ver 1.1/FEB 2012
1
STEP ONE
Assemble the Posts
Lay down one of the post on its side as shown and insert
1
the 4x4 Pressure Treated Lumber 60” into the post (36” out).
Mount the 2 x 3 1/2 and 1 3/4 x 1 3/4 Brackets onto the post at
2
10 7/8“ and 51 1/2” respectively from the bottom of the post*.
Use the provided 3“ Screws (2 per bracket).
Ensure the opening of the 2 x 3 1/2 bracket is facing up.
*) Note: Measurements are from the bottom of the post to the
bottom of each bracket.
Bottom View of Post
3” Screws
Vinyl
Post
Bracket
www.newenglandarbors.com
2
Wood
Post
1
Repeat for all four posts. Note the location of the wood posts
3
as they should be symmetrical and opposite to each other.
Consult the below diagram for reference.
2
2
The Devonsh ire Arbo r
STEP T WO
STEP T WO
Assemble Side Panels
Assemble the side panel together as shown. You will need 1 x Bottom Rail, 1 x Middle Rail, 1 x Top Arch Rail and 5 x Vertical Spindles.
1
Note the three different lengths of the Vertical Spindles.
Top Arch Rail
Bottom Rail
2
3
1
Carefully navigate the side panel assembly on top of a post as shown below. Assemble by firstly inserting the Top Arch Rail into
the routed hole, followed by the middle rail and bottom rail.
Fasten the rails into its corresponding bracket using the 3/4” screws provided (2 screws per bracket) as shown.
Middle Rail
51” Spindles
51 1/2” Spindles
52 3/4” Spindles
3
2
insert 1st
insert 2nd
insert 3rd
Lay down a second post, align, and insert the panel from the previous step following the same
4
order from step number two.
Fasten the rails into its corresponding bracket using the 3/4” screws provided (2 screws per bracket) as shown.
5
5
4
insert 1st
insert 2nd
insert 3rd
The Devonsh ire Arbo r
3