New England Arbors VA68217 User Manual

Urbanscape Raised Planter Box
www.newenglandarbors.com
Please read through before starting assembly.
Check Box for These Contents
In the event of missing or defective parts please call our customer service dept. at 1 800 282 9346, ext #20 (Mon. to Fri. 8:00 AM to 4:00 PM EST)
1. Pre-Assembled Side Wall Panels with Posts Connected (2)
2. Floor Panels (2)
3. Pre-Assembled Front and Back Wall Panels (2)
4. Floor Supports (2)
5. Shelf Boards (7)
6. Shelf Rails (2)
7. Post Caps (4) 5/8 Stainless Steel Screws (4)
8.
1 1/2 Stainless Steel Screws (8)
9.
1
2
3
4
5
8
9
7
Not to Scale
6
General Information
Read Instructions through carefully before beginning assembly.
• When assembling components, place on a non-abrasive surface
(i.e. shipping box) to avoid scratching.
• We recommend an area approx 4’x 8’ for unobstructed assembling.
• You should not need to use excessive force when assembling components.
Ver 1.0/JULY 2012
1
The Urbanscape Raised Planter Box
STE P ONE
1
Insert the seven Shelf Boards into the Shelf Rails as shown aside Note that there are tabs located at the ends of the Shelf Boards.
Push Shelf Boards until tabs are locked into place.
2
Lay down one of the pre-assembled side panel with post down
and insert the bottom shelft as well as the two front and back
panels. Push the bottom shelf until the tabs lock into place.
3
Align and insert the second pre-assembled side panel as shown.
Push down until the bottom shelf rail tabs lock into place.
4
Carefully stand the planter box on it’s legs and insert the two floor
supports into place as shown.
1
www.newenglandarbors.com
2
3
4
2
The Urbanscape Raised Planter Box
Loading...
+ 2 hidden pages