New England Arbors VA68188 User Manual

ASSEMBLY INSTRUCTIONS
The Milan Trellis
Please read through before starting assembly.
55.26
4
www.edenarbors.com
59.26
20
27.27
IMPORTANT: CHECK THE INSIDE OF YOUR POSTS FOR ALL MATERIALS.
Check Box for These Contents
In the event of missing or defective parts please call our customer service dept. at
1 800 282 9346, ext #20 (Mon. to Fri. 8:00 AM to 4:00 PM EST).
1.
Arched Top Rail
2. Post Caps (2)
3. Posts (2)
4.
Vertical Spindle Left
5.
Vertical Spindle Right
6.
Horizontal Spindles
7.
Diamonds
8.
Bottom Rail
9. Ground Anchoring Stakes (2)
10. 5/8” Self-Auguring Stainless Steel Screws (12)
(1)
(1)
(4)
(2)
(1)
1
2
3
4
5
6
7
Tools You Will Need
• Cordless Drill
• Hammer
• Tape Measure
• Level
• Shovel
8
General Information
Read Instructions through carefully before beginning assembly.
• When assembling components, place on a non-abrasive surface
(i.e. shipping box) to avoid scratching.
• We recommend an area approx 5’x 8’ for unobstructed assembling.
• You should not need to use excessive force when assembling components.
9
10
Not to Scale
Ver 1/Nov 2008
1
STEP ONE
Assemble the Side Panels
NOTE: There are locking tabs located at the ends of the horizontal rails. Once inserted and pushed into the routed holes, they will lock into place.
1
Layout the horizontal bottom rail and insert the two long
vertical spindles. Ensure the routed holes on the spindles are
orientated correctly to eventually receive diamonds (see Figure 1).
The spindles are identified inside the notch at the top with
either the letter L for Left or R for Right.
2
Install the arched top rail over the ends of the vertical spindles
ensuring the architectural detail faces out (same as bottom rail).
3
Insert the four horizontal spindles ensuring that the routed holes
on the spindles are positioned to accept the diamonds
(see Figure 2).
4
Pressure fit the diamonds into the square area designated by
tensioning into the horizontal and vertical routed holes (four
points of contact).
R
L
R
Fig. 1
1
Holes
L
R
2
5
Set out one post and complete the side panel by inserting it into
the post. Start with the bent top rail first.
6
Lay out the second post with holes facing upwards and insert
the completed panel and connected post.
7
Flip the trellis over and install screws into the two pre-drilled holes per post. This will lock the horizontal rails into the
vertical posts.
Insert 1st
Insert 2nd
Insert 2nd
3
Insert 1st
Fig. 2
4
2
Insert 3rd
5
Insert 3rd
6
7
www.edenarbors.com
Loading...
+ 1 hidden pages