Draft. Nr.: BDA Update:380 13.07.2016 Data subject to change withoutprior notice. 201 NEUTRIK . ALLRIGHTS RESERVED.5 NEUTRIK are registered trademark.
II
©
® ®
NEUTRIK AG T: F:LI +423 /237 24 24 +423 232 53 93/
NEUTRIK USA Inc. T: F :USA +1 704/ 972 3050 +1 704 438 9202/
NEUTRIK UK Ltd.
()
T: F:UK +44 1983/ 811441 +44 1983 811 439/
NEUTRIK Vertriebs GmbH T: F:DE/NL/AT/DK +49 8131 /280 890 +49 8131 280 830/
NEUTRIK France FR T: F:+33 1 4131 6750 +33 1 4131 0511//
NEUTRIK Tokyo Ltd. JP T: F :+81 3 3663 4733 +81 3 3663 4796//
NEUTRIK Hong Kong Ltd. T: F:HK +852 2687 6055 +852 2687 6052//
NEUTRIK India Pvt. Ltd. IND T: F:+ +91 22 26163 54091/ 982 05 43 424 /
ASSEMBLY INSTRUCTION powerCON TRUE1
I
R
20
250
P S
E
JET
16
250
20
250
NAC3MX-W
20
250
P S
E
JET
16
250
20
250
NAC3MX-W
Torque Value 0.7 Nm
5.
Torque Value 2.0Nm
PRESS FIRMLY
Torx size
T8
1.
2.
4.
Wrench size
13 mm
6.
3.
Important:
Push and turn simultaneously.
FOR DISASSEMBLY - OPEN TWIST LOCK!
1. Press with screw driver to unlock
Turn bushing 360°.2.
Repat step 1 + 2 until bushing is unscrewed.3.
1.
2.
CAUTION
To ensure protection
category, do not expose the
connection to bending forces
(e.g. do not attach loads to
the cable, no free-dangling
cable windings etc.).
LIECHTENSTEIN
20
250
P S
E
JET
G
E
F
Important:
Align r keyubber
latch.and
Insert the wires into the terminals and fasten the
screw with Torx size T8.
Wiring VDE UL
blackL brownÞ
whiteN blueÞ
green / yellow greenÞ
Slide the chuck onto the insert (1) and then both
together into housing (2).
Important: Align the chuck byand insert
positioning the nose into keyway.the
Slide the bushing up the cable tighten itand with
the tool as shown.
Important: Yellow O-ring to hide to achieve IP
protection (6).
(Tool available: Art. No. HTAC)
FORCE
SAFETY WARNING
For safety and certification reasons the connector must be
replaced in case of any broken parts or serious damage.