Neutrik NE8MX6-B-T Assembly Instruction [EN]

R
ASSEMBLY INSTRUCTION
Tools: HX-CAT6A or pliers wrenchl Wire cutterl
A
2.
B
1.
2.
etherCON NE8MX-T* - CAT6A Cable Connector
l Cable pulling lubricant
1.
10 mm
A
40 mm
S / FTP
|
Insulation Diameter: > 0.85 - 1.10 mm Wire Size: AWG 26/1 - AWG 22/1 (solid) AWG 27/7 - AWG 22/7 (stranded)
A
Slide the boot (1.) and the chuck (2.) onto the cable.
To ease the boot assembly apply some cable pulling lubricant to the cable ends.
1. Prepare the cable as shown and strip the jacket at a
B
length of 40 mm.
U / FTP
B
B. U / FTP Remove the foil of the paired wires and bend back the drain wire for easier handling during assembly. Drain wire to be used for grounding.
10 mm
C
C. SF / UTP Cut off braided shield to approx 10 mm and fold the shield backwards. Cut and remove the foil screen.
SF / UTP
6 mm
3.
4.
C
3. Remove the pair screening (if existing) to max. 6 mm.
4. Presort and untwist the pairs as shown.
Insert the wires into the designated position of the wire
C
management as per below wiring scheme, either T568A
Compon en t
side!
7
7
8
8
2
A
2
A
1
7
8
2
1
B
1
or T568B
Compon en t
side!
1 2 8 7
3 6 4 5
Connec ti on
Color code
T56 8A T56 8B
W - G
G
W - O
BL
W - BL
O
W - BR
BR
W - O
O
W - G
BL
W - BL
G
W - BR
BR
RJ 45
PIN No.
1 2 3 4 5 6 7 8
Page 1BDA 462
etherCON CAT6A - ASSEMBLY INSTRUCTION
B
D
m
mm
5
. 0.
x
a
7
8
2
1
2.
7
8
2
1
1.
7
7
8
8
B
2
A
1
2
A
1
15 - 17 mm
3.
1.
E
1. Use HX-CAT6A or pliers wrench to press the wire
D
management together.
Attention:
Distance between the cable jacket and the wire management shall not exceed 15 - 17 mm.
2. Cut all wires with a wire cutter.
Allow wires to protrude max. 0.5 mm.
3. Remove the assembly guidance.
Position the ground-shells over the wires as shown.
E
Attention:
7
7
8
8
B
2
A
1
2
A
B
1
Align the coding nibs of the ground shells to the grooves in between the wire pairs in the wire management.
A
F
S / FTP & SF / UTP U / FTP
B
A. Put the cable-shield over the ground shell and
F
distribute the shield wires circumferentially.
7
7
8
8
B
2
A
1
2
A
1
7
7
8
8
B
2
A
1
2
A
1
B. Put the drain wire over the ground shell and
wrap the drain wire circumferentially.
G
H
Slide the chuck over the cable-shield / drain wire and
G
the ground shell towards the end-position.
B
A
B
A
7
7
8
8
B
2
A
1
2
A
1
Attention: Align the slots of the chuck to the ribs of the ground shell.
Slide the pre assembled cable (step G) into the housing.
H
Attention: Align the side of the wire management with wire numbers 1/2, 8/7 to the side of the housing that has the Neutrik logo and the slot.
7
8
B
2
A
1
A
Slide the gasket onto the chuck.
7
8
2
1
A
Finish the installation by turning the bushing onto the
II
connector.
NEUTRIK AG LI T: +423 / 237 24 2 4 F: +423 / 232 53 9 3 NEUTRIK USA Inc. US A T: +1 704 / 972 3050 F: +1 704 / 438 920 2 NEUTRIK UK Ltd. UK T: +44 1983 / 811 441 F: +44 1983 / 811 439 NEUTRIK Vertriebs GmbH DE / NL / AT/DK T: +49 81 31 / 280 8 90 F: +49 8131 / 28 0 830
Draft. Nr.: BDA 462 Update: 28.08.2017 Data subject t o change without prior n otice. 2017 NEU TRIK . ALL RIGHTS RESERVE D. NEUTRIK , eth erCON is a regi stered trademark.
www.neutrik.com
( )
I I
©
Page 2
NEUTRIK France FR T: +33 1 / 4131 675 0 F: +33 1 / 413 1 0511 NEUTRIK Tokyo Ltd. JP T: +81 3 / 366 3 4733 F: +81 3 / 3663 4796 NEUTRIK Hong Kong Ltd. HK T: +852 / 2687 6055 F: +852 / 2687 605 2 NEUTRIK India Pvt. Ltd. IND T: +91 / 982 05 43 4 24 F: +91 / 22 26163 540
® ® ®
R
Loading...