S23DW CONTINUOUS INSTALLATION INSTRUCTIONS
NOTE: WE RECOMMEND TO MOUNT FIXTURE
TO WALL BY WOODEN SCREW WITH
1. REMOVE LENS.
AND WALL MOUNTING
BRACKETS.
BEND DOWN SOCKET
TRAY AT ENDS.
WASHER(NOT BY NEO-RAY).
FIXTURE WITH FEED MAY BE INSTALL
OVER JUNCTION BOX.
IF IT IS NECESSARY, CONTRACTOR HAVE
TO PROVIDE BLOCKS AT PLACE OF FIXTURE
MOUNTING POINTS.
Document P/N: 23DW02
2. INSTALL WALL MOUNTING BRACKETS BY PLAN ON
WALL USING WOODEN SCREW(OR 8-32 SCREW ON
JUNCTION BOX)(NOT FROM NEORAY).
PUSH THROUGH FEED CORD IN TO FEED HOLE
OF MOUNTING BRACKET BOR FIXTURE.
BRING BOR FIXTURE UP TO WALL.
3. PUSH FEED CORD THROUGH FEED HOLE OF BOR FIXTURE,
HANG UP BOR FIXTURE ON WALL MOUNTING
BRACKET AND FIX BY SCREW
100 Andrews Rd, Hicksville, NY 11801 • p: 516-470-1000 • f: 516-470-1077 • www.neoray-lighting.com Page 1 of 3

S23DW CONTINUOUS INSTALLATION INSTRUCTIONS
Document P/N: 23DW02
4. INSTALL
STRAIN
RELIEF
5. SPLICE WIRES
7. INSTALL WALL MOUNTING BRACKET
OF INT FIXTURE BY PLAN AND FIX IT
TO WALL BY WOODEN SCREW.
BRING INT FIXTURE TO INSTALLED
BOR FIXTURE.
6. BEND TRAY UP.
FIX WITH 8-32
MACHINE SCREW
8-32 Machine
Screw
8. INSTALL INT FIXTURE ON WALL MOUNTING
BRACKET
100 Andrews Rd, Hicksville, NY 11801 • p: 516-470-1000 • f: 516-470-1077 • www.neoray-lighting.com Page 2 of 3

S23DW CONTINUOUS INSTALLATION INSTRUCTIONS
INT Section
Joiner Nut
Bulkhead Opening
Carriage Bolt
Aligner Pin
BOR Section
9. CONNECT INT FIXTURE TO INSTALLED BOR FIXTURE
BY CARRIAGE BOLT THROUGH HOLE IN BLACKHEAD
OF INT FIXTURE, PUT NUT ON A FEW THREADS.
10. INSERT ALIGNER PINS INTO ADJACENT HOUSING OF
INT FIXTURE GROOVES.
Document P/N: 23DW02
10. WITH SUPPORT INT FIXTURE
TIGHTEN JOINER NUT.
11. SPLICE RUN THROUGH WIRES.
BEND TRAYS UP. FIX WITH 8-32
MACHINE SCREWS.
12. REPEAT STEPS FROM
7 THROUGH 11 TO
CREATE RUN.
13. INSTALL LAMPS.
14. CHECK FIXTURE FUNCTION.
15. INSTALL LENSES.