Nemtek Druid LCD 2X Network Manual

Page 1
Network Guide
For Druid LCD 2X Energizers
Page 2
2 Disclaimer 3
3 NEMTEK Group Outlets 4
4 4-Zone Keypad Energizer Setup 5
5 NEMTEK Ethernet Module Setup 8
6 Ethernet Network Setup 11
6.1 Basic Ethernet Setup 11
6.2 Ethernet/Optic Fibre Network Setup 16
6.3 Ethernet/Optic Fibre Ring Example 17
6.4 Ethernet/Wireless Network Setup 18
7 RS485 Network 20
7.1 Daisy Chain Network Setup 20
7.2 Star Network Setup 27
7.3 RS485/Optic Fibre Network Setup 32
8 Ethernet/Optic Fibre/RS485 Combined Network 38
9 8-Way Smart IO Board Setup 40
Table of Contents
2
Page 3
1 INTRODUCTION
The NEMTEK Druid LCD 2x energizer and NEMTEK 8-way Relay Board provide the network connection capability for the synchronisation, centralised control and/or remote control and feedback of multiple energizers and relay boards. Various network topologies are possible, ranging from a simple two energizer network linked by a keypad, to a large network consisting of up to 32 energizers and up to 32 relay boards linked by ethernet cable, optic fibre, RS485 or wireless connection.
This manual aims to provide a setup guide for these different topologies on hardware and software level. All software mentioned in this guide can be found online at http://www.nemtek-druid-fenceprobe.com. All required hardware mentioned in this manual is available directly from NEMTEK.
2 DISCLAIMER
NEMTEK Holdings (Pty) Ltd or any of its subsidiary companies does not guarantee that the operation of the products will be uninterrupted or totally error free. NEMTEK shall not be liable for any special, incidental, consequential, direct or indirect damages, whether based on contract, tort, or any other legal theory.
Product specifications may be altered without prior notification.
Introduction & Disclaimer
3
Page 4
HEAD OFFICE
Tel: +27 (0)11 462 8283 Northriding Commercial Park Fax: +27 (0)11 462 7132 Stand 251, Aintree Street, Northriding
Randburg, South Africa
EXPORTS
Tel: +27 (0)11 462 8283 exports@nemtek.com Fax: +27 (0)11 462 7132
EDENVALE
Tel: +27 (0)11 453 1970 Unit 4, Meadowdale Park Fax: +27 (0)11 453 1858 Cnr. Dick Kemp & Herman Roads
Meadowdale, Edenvale, South Africa
CAPE TOWN
Tel: +27 (0)21 386-3742 27B Concord Crescent, Airport City Fax: +27 (0)21 386-5573 Cape Town, South Africa
NELSPRUIT
Tel: +27 (0)13 752-2187 Waterval Ave, Riverside Industrial Fax: +27 (0)13 752-2188 Nelspruit, South Africa
KWAZULU-NATAL
Tel: +27 (0)31 701-2125 19 Henwood Road Fax: +27 (0)31 701-2125 Pinetown, South Africa
AUSTRALIA
Tel: (08) 9303 9855 Unit 5, 19 Innovation Circuit, Email: nemtek@bigpond.net.au Wangara, 6065, Perth, WA, Australia
Website: www.nemtek.com
E-mail: nemtek@nemtek.com
Manufactured in South Africa
3 NEMTEK Group Outlets
4
Page 5
4 4-Zone Keypad Energizer Setup A
5
A 4-zone energizer network can be c re ate d by con ne ct ing two Dru id LC D 2 x en er giz er v ia
the keypad bus, using the NEMTEK 4-Zone Keypa d. Both energ izers can be control led with one keypad and alarms ge ne rat ed on e ith er en er gizer wi ll b e v i sible o n the ke ypad. The output pulses of both energizers will a lso be sy nch roni sed w ith thi s setup. The master energizer will be displayed as Energ ize r 1 ( Zone 1 & 2) an d t he sla ve energ izer a s Energizer 2 (Zone 3 & 4) o n t he key pa d. F o llo w th e set up inst ruc tio n s chro nol og ica lly , with the corresponding number in the fi gure, g iven a fte r the st eps in b rac kets .
1. Set up the master energizer:
a. Disconnect the energize r mains
and battery power. [1, 2]
b. Connect the keypad’s power
(marked + and -) and data line (marked DATA) to the master energizer. [3]
6
3
10
7
Page 6
c. Ensure the energizer is restored to factory default:
i. Reconnect the battery power. [2] ii. Reconnect the mains power. [1] iii. Within 60 seconds of reconnecting the power, enter 2389# on the keypad. d. Enter installer mode by entering 012345*0#. Ensure the energizer LCD display turns purple. [4] e. Enter 5001*# to activate 4-zone mode. Refer to the Druid LCD installer manual for more detail on the codes. f. Configure all user-preferences, for example alarm bypasses, specific to this energizer as individual energizer configuration is not possi bl e on ce c on n ected in the 4-zone configuration. g. Exit installer mode by entering *#. Ensure the energizer LCD display turns
blue. [4] h. Disconnect the energizer mains and battery power. [1, 2] i. Remove the keypad from the energizer. [3]
2. Set up the slave energizer:
a. Disconnect the energizer mains and battery power. [5, 6] b. Connect the keypad to the slave energizer and reset to factory default by
following the same procedure as the master. [7] c. Configure all user-preferences, for example alarm bypasses, specific to this energizer as individual energizer configuration is not possible once connected in the 4-zone configuration. d. Insert the slave jumper JP3. [8] e. Power up the energizer by first connecting the battery and then the mains power. [6, 5] f. Ensure that “SLAVE” is displayed on the LCD. [9] g. Disconnect the energizer mains and battery power. [5, 6] h. Remove the keypad from the energizer. [7]
4 4-Zone Keypad Energizer Setup B
6
Page 7
4 4-Zone Keypad Energizer Setup C
7
3. Connect the master energizer, slave energizer and keypad:
a. Connect the master energizer’s keypad
ground (marked -), data line (marked DATA) and synchronisation line (marked SYNC) to the slave energizer’s keypad ground, data line and synchronisation line. (Do not Connect the master and slave energizer’ s
positive lines (marked +) together). [3, 7] b. Connect the keypad’s power (marked + and -) to the master or slave energizer. Note the ground terminals on both energizers were already
used to connect the energizers together (step 1), therefore two wires
must be fastened together in the same terminal. [3, 7] b. Connect the keypad’s data line (marked DATA) to the same data line used
to connect the master and slave energizers, by connecting the wire to
either the master or slave energizer. Note the data terminal on both
energizers were already used to connect the energizers together (step 1),
therefore two wires must be fastened together in the same terminal.
[3, 7]
4. Testing the connection:
a. Power both energizers by first connecting the battery and then the mains power. [2, 1, 6, 5] b. Open the gate contact on the “slave” energizer and make sure it is
displayed on the keypad. Close the gate contact. [10] c. Enter 1234# and make sure both energizers are activated.
Page 8
5 NEMTEK Ethernet Module Setup A
8
The NEMTEK Ethernet Module provides network connectivity to
various NEMTEK products. To set up the module successfully, follow these steps:
1. Download and save the USR-M0 setup software from http://www.NEMTEK-druid-fenceprobe.com/downloads/USR-M0-V2.1.2.118.exe
2. Install the jumper as per the relevant NEMTEK product shown in the figures below.
3. Connect the Ethernet Module directly to your computer using a suitable Ethernet cable.
4. Power up the NEMTEK board and ensure the green POWER LED is lit (For the NemLink board, power the board via either the J1 or J2 connector).
5. Run the USR-M0 setup software on your computer.
6. Click on the
“Search Device”
button.
7. A device should appear in the dialog box above the
“Search Device”
button. If no device appears check that the jumper is correctly installed, the ethernet cable is connected and that the board is powered.
8. Click on the device to display the d e vice parameters.
Page 9
5 NEMTEK Ethernet Module Setup B
9
9. If the module is still configured as factory default, the following parameters should
be displayed (if the parameters differ, change the fields as shown in the figure):
10. If you are configuring a NemLink Ethernet Module connected to an energizer or 8-way Relay Board, and the device is installed on a local, private network, ONLY the
“ModuleStaticIP”
needs to be changed as explained in step 13 (Step 14 can
be ignored).
11. If you are configuring a NemLink Ethernet Module connected to an FG7 or 8-way Smart IO Board, and the device is installed on a local, private network, the
“Module
work mode”
needs to be changed to
“UDP”.
The
“ModuleStaticIP”
and
”RemoteIP”
need to be changed as explained in step 13 and 14.
12. Large, public networks, including routing and remote access via an internet connection, are not covered by this guide. Please consult your network administrator.
13. Enter a new
“ModuleStaticIP”
adhering to the following criteria:
a. Every NEMTEK network device needs to have a unique
“ModuleStaticIP”
address. Devices cannot share the same address.
b. It is recommended that the
“ModuleStaticIP”
is chosen from the range
192.168.0.1 to 192.168.0.254
Page 10
5 NEMTEK Ethernet Module Setup C
10
c. Ensure that all
“ModuleStaticIP”
addresses are in the same IP range. This
means that for the range ment ion ed in ( b. ), t he fir st 3 nu mber s (e . g. 1 92.1 68.0) of the
“ModuleStaticIP”
address must be exactly the same for all network
devices and the last number may range from 1 to 254. An example of valid
“ModuleStaticIP”
addresses on the same network will be: i. NEMTEK NemLink (connected to NEMTEK FG7): 192.168.0.150 ii. NEMTEK NemLink (connected to Energizer): 192.168.0.100 iii. NEMTEK 8-way Relay Board: 192.168.0.55 iv. NEMTEK Smart IO Board: 192.168.0.200
14. Enter a new
“RemoteIP”
adhering to the following criteria:
a. The NemLink connected to the FG7, must have a
“Remote IP”
address where the first three numbers are exactly the same as the first three numbers of all the devices on the network and the last number is 255.
b. The NEMTEK Smart IO Board can only communicate with one energizer,
therefore the
“RemoteIP”
must be identical to the
“ModuleStaticIP”
of the
energizer it communicates with.
c. With reference to the
“ModuleStaticIP”
addresses in the example in step 13,
the following is an exa mple of va li d
“RemoteIP”
addresses on the same network: i. NEMTEK NemLink (connected to NEMTEK FG7): 192.168.0.255 ii. NEMTEK NemLink (connected to Energizer): not required iii. NEMTEK 8-way Relay Board: not required iv. NEMTEK Smart IO card: 192.168.0.100
15. Click on
“Save Config”
to change the parameters on the module.
“ACK”
will appear
three times in the lower left dialog box if the changes were successful.
16. To check that the settings were saved successfully, click on the
“Search Device”
button again. The changed network device IP address should appear in the dialog box above the
“Search Device”
button. Click on this device and ensure that all
parameters were changed correc tl y.
17. Remove the jumper as mentioned in step 2 for the Taut Wire Node, NemLink and Nemlink Network IO boards. Install the jumper on the 2 lower pins for the 8-way Relay Board and 8-way Smart IO Board.
18. The network device is now ready for installation.
Page 11
By using a NEMTEK FG7 module and associated hardware, remote control and
feedback are possible to multiple Druid LCD 2x and 8-way Relay Boards, via an ethernet or network.
6.1 Basic Ethernet Setup
The example diagram below illustrates the required hardware and wiring required for the network setup. Note that the NEMTEK GPS module can be used to synchronise the pulsing of multiple energizers, where physical wiring between the energizers are not possible. The NEMTEK Power Pack may be used to provide a 12V supply with battery backup to the FG7 and 8-way Relay Board. Note that all ethernet cables should have a maximum length of 100m and the FG7-Nemlink pigtail and 10-way ribbon should have a maximum length of 1m.
To set up the network successfully, follow these ste ps:
1. Configure all Ethernet Modules installed on the Nemlinks and 8-way Relay Boards by referring to section 5 of this document.
2. For the connection setup between the PC and FG7 module, refer to the FG7 installer manual. The PC to FG7 link is optional to run the NEMTEK Fenceprobe software.
6 Ethernet Network Setup A
11
Page 12
6 Ethernet Network Setup B
12
3. For the FG7:
a. Disconnect the power and open the NEMTEK FG7 (Refer to the FG7 Installer
Manual). b. Connect the supplied FG7-Nemlink pigtail to the FG7 J7 connector. [1] c. Connect the other end of the pigtail to the Nemlink J1 connector. [2] d. Configure the SERIAL SELECT jumper JP7 to TTL.
No other jumpers need to be changed. Refer to
the Installer Manual for a complete list of jumper
configurations. [3] e. Close the FG7. f. Connect the FG7 to a port on the ethernet switch (the
port number does not matter) with an ethernet cable. [4] g. Power up the FG7. h. Configure the FG7 software by referring to the FG7 Installer Manual.
2
Page 13
4. For the Druid LCD 2x energizer:
a. Disconnect t h e energizer mains
and battery power. [1, 2] b. Install the Nemlink board on top
of the battery brace and fasten
with 4 screws. [3] c. Install the 10-way ribbon cable
between the energizer and
Nemlink board. [4] d. Connect a keypad to the
energizer. [5] e. Ensure the energizer is restored
to factory default:
i. Reconnect the battery
power. [2]
ii. Reconnect the mains
power. [1]
iii. Within 60 seconds of reconnecting the power, enter 2389# on the keypad. f. Enter installer mode by entering 012345*0# on the keypad. Ensure the
energizer LCD display turns purple. [6] g. Configure the network address from by entering 51xx*#, where xx is the
address from 1 to 32. Energizer add r es s es mus t b e chronologically
configured starting at 1. For example, three energizers on a network with
addresses 5, 18 and 22 is not allowed, as they need to be addressed 1, 2
and 3. Relay boards and energizers are addressed separately from 1 to 32. h. Exit installer mode by entering *#. Ensure the energizer LCD display turns blue. [6] i. Ensure the energizer network address is displayed on the LCD. [6] j. Connect the energizer to a port on the ethernet switch (the port number does
not matter) with an ethernet cable. [7] k. Route the ethernet cable out the bottom of the energizer enclosure and install
the lid.
6 Ethernet Network Setup C
6
2
13
1
5
3
6
Page 14
14
6 Ethernet Network Setup D
5. For the Ethernet 8-way Relay Board:
a. Disconnect the power connector. [1] b. Configure the address of each relay board chronologically using jumpers JP7 1
to 16. When all jumpers are populated, the address is 1. When a jumper is
removed, the corresponding number will be added to the network address.
For example, if jumpers 1, 4 and 8 are removed, the address will be 1+1+4+8=14.
The first relay board in the network MUST be configured as address 1, the
second as address 2 etc. Addressing, for example, 3 boards in the network
with addresses 3, 6 and 20 is not allowed, as their addresses must be 1, 2 and 3.
Relay boards and energizers are addressed separately from 1 to 32. Relay boards
and energizers are addressed separately from 1 to 32. On the FG7 module, an
address offset of 32 is added to all relay boards. Therefore, relay board 1 will
be referred to as 33 (1+32), relay board 2 as 34 (2+32) etc. on the FG7. [2] c. Ensure jumpers JP5 B and C are populated. Jumpers JP5 A and D can either be
populated or not. [3] d. Connect the relay board to a port on the ethernet switch (the port number
does not matter) with an ethernet cable. [4] e. Power up the relay board (The NEMTEK Power Pack can be used to power the
relay board).
1
2
3
Page 15
15
6 Ethernet Network Setup E
6. For the NEMTEK GPS Module:
a. Disconne ct the energizer mains
and battery power. [1, 2] b. Connect connecting the GPS
module’s power (marked GND
and +12V) and synchronisation
line (marked SYN), to the
energizer’s external power
(marked EXT POWER INPUT
+ and -) and synchronisation
line (marked SYNC),
respectively. [3, 4]
c. Connect a keypad to the
energizer. [3] d. Connect the battery and mains power. [2, 1] e. Enter installer mode by entering 012345*0# on the keypad. Ensure the
energizer LCD display turns purple. [5] f. Configure passive synchronisation (GPS synchronisation) by entering 5031*#. g. Exit installer mode by entering *#. Ensure the energizer LCD display turns blue. [5] h. The red SYNC LED on the GPS module will start flashing if a GPS signal was
obtained. The time to obtain a signal will vary depending on the signal
strength. Ensure the GPS module is not obstructed to the sky by metal or
thick concrete structures, which will lead to a loss of signal. I Route the GPS cable out the bottom of the energizer enclosure and install the lid. j. The energizer will automatically go into low voltage mode if the
synchronisation GPS signal is lost. A synchronisation error will also be
displayed on the FG7 screen, under the energizer tab.
2
1
3
Page 16
16
6 Ethernet Network Setup E
6.2 Ethernet/Optic Fibre Network Setup
Where ethernet communication further than 100m are required for the network mentioned in section 6, the long-distance cables can be replaced with optic fibre, as shown in the figure below. The ethernet signals are converted to and from optic signals, by using a pair of ethernet/optic fibre converters. Either Single-Mode converters and cable, with a maximum distance of 20km, or Multi-Mode converter and cable, with a maximum distance of 2km, may be used. These converters require a 12V dc power supply, which can be supplied by the NEMTEK Power Pack. The rest of the network configuration remains the same as explained in section 6.1.
Page 17
17
6 Ethernet Network Setup F
6.3 Ethernet/Optic Fibre Ring Example
The ethernet/optic fibre network discussed in section 7 may be installed in a ring-like fashion as shown in the figure below, by using multiple network switches. This is useful when optic fibre cables are installed along the perimeter fence/wall and energizers or IO boards need to be installed consecutively near the fence/wall. More than one energizer or IO board can be installed on any ethernet switch as long as the total number of energizers and IO boards in the network are both less or equal than 32. Note the power supplies were omitted, but can be installed as in section 7.
Page 18
6 Ethernet Network Setup G
6.4 Ethernet/Wireless Network Setup
Long distance ethernet cables may also be rep lace d w ith w ireles s tech nolog y f or ease of installation. Different topologies are po ss ible depen ding on th e c lie nt’ s req uir ement s a s shown in the figures below. The software setup explained in this document will be identical for the different topologies. Note that all antennas depicted have built-in r adios.
18
Page 19
19
6 Ethernet Network Setup H
The antennas should be set up and configured to the specific manufacturer
requirements. The network parameters should be as follows:
a. IP address: Should be in the same IP range as the rest of the NEMTEK network
devices and all antenna should have a unique static IP. Don not use DHCP.
See section 5 of this document for further details. b. Subnet mask: Should be in the same as the rest of the NEMTEK network
devices (recommended 255.255.255.0). See section 5 of this document for
further details. c. Network mode (all antennas): Bridge d. Wireless mode (antenna on FG7 side): Access point e. Wireless mode (antenna on energizer/relay board side): Station
Page 20
20
7 RS485 Network A
By using a NEMTEK FG7 module and associated hardware, remote control and
feedback are possible to multiple Druid LCD 2x and 8-way Relay Boards, via an RS458 daisy chain or star network. The RS485 board also has the capability to synchronise energizer pulsing on a separate RS485 synchronisation channel. The synchronisation network is separate from the data network and can be configured for daisy chain or star, irrespective of the data network configuration. Alternatively, GPS synchronisation, as discussed in section 6, can still be used if required.
7.1 Daisy Chain Network Setup
The example diagram below illustrates the required hardware and wiring required for an RS485 daisy chain network setup. The NEMTEK Power Pack may be used to provide a 12V supply with battery backup to the FG7 and 8-way Relay Board. Note that all RS485 3-core cables should have a maximum length of 1000m and the 10-way ribbon should have a maximum length of 1m. It is recommended that the 3-core cables for RS485 communication are shielded and that the shields are grounded only on one end of the cable to prevent ground loops. Ensure that the daisy chain forms a complete ring by wiring the DATA OUT terminal of each RS485 device to the subsequent device’s DATA IN terminal, as in the figure below.
Page 21
21
7 RS485 Network B
To set up the network, follow these steps:
1. For the connection setup between the PC and FG7 module, refer to the FG7 installer manual. The PC to FG7 link is optional to run the NEMTEK Fenceprobe software.
2. For the FG7:
a. Disconnect the power and open the NEMTEK FG7 (Refer to the FG7 Installer
Manual).
b. Connect the GND, A and B wires coming from the DATA OUT of the previous
RS485 network device to the RS485 IN GND, A and B terminals of the FG7. [1]
c. Connect the GND, A and B wires going to the next RS485 network device to
the RS458 OUT GND, A and B terminals of the FG7. [2] d. Configure the LINE BIAS jumper JP1 to DISABLE. [3] e. Configure the RX EN and TX EN jumpers JP2 and JP3 to ENABLE. [4] f. Configure the SERIAL SELECT jumper JP7 to RSXXX. [5] g. Configure the RSXXX jumper JP8 to RS485. [6] h. Close the FG7. i. Power up the FG7, when all network connections have been done. j. Configure the FG7 software by referring to the FG7 Installer Manual.
Page 22
22
7 RS485 Network C
3. For the Druid LCD 2x energizer:
a. Disconne ct the energizer
mains and battery power. [1, 2] b. Install the RS485 board on top
of the battery brace and fasten
with 4 screws. [3] c. Install the 10-way ribbon cable
between the energizer and
RS485 board. [4] d. Connect a keypad to the
energizer. [5] e. Connect the GND, A and B
wires coming from the DATA
OUT of the previous RS485
network device to the DATA
IN GND (marked G), A and B
terminals of the RS485
board. [6]
f. Connect the GND, A and B wires going to the next RS485 network device to
the DATA OUT GND (marked G), A and B terminals of the RS458 board. [6]
g. Configure jumpers JP1, JP2, JP3, JP5 and JP6 like
in the figure on the right. For jumper functions
refer to the RS485 board installer manual. [7]
Page 23
23
7 RS485 Network D
h. Ensure the energizer is restored to factory default:
i. Reconnect the battery power. [2]
ii. Reconnect the mains power. [1]
iii. Within 60 seconds of reconnecting the power, enter 2389# on the keypad. i. Enter installer mode by entering 012345*0# on the keypad. Ensure the
energizer LCD display turns purple. [8] j. Configure the network address from by entering 51xx*#, where xx is the
address from 1 to 32. Energizer addresses must be chronologically
configured starting at 1. For example, three energizers on a network with
addresses 5, 18 and 22 is not allowed, as they need to be addressed 1, 2
and 3. Relay boards and energizers are addressed separately from 1 to 32. k. Exit installer mode by entering *#. Ensure the energizer LCD display turns blue. [8] l. Ensure the energizer network address is displayed on the LCD. [8] m. Route the cables out the bottom of the e n er gi z er enclosure and install the lid.
4. For the RS485 8-way Relay Board:
a. Disconnect the power connector. [1] b. Configure jumper JP1 for “YES” for data pass through. [2]
c. Configure jumper JP2 for daisy chain. [3]
Page 24
24
7 RS485 Network E
d. Configure the address of each relay board chronologically using jumpers JP7
1 to 16. When all jumpers are populated, the address is 1. When a jumper is
removed, the corresponding number will be added to the network address.
For example, if jumpers 1, 4 and 8 are removed, the address will be
1+1+4+8 =14. The first relay board in the network MUST be configured as
address 1, the second as address 2 etc. Addressing, for example, 3 boards in
the network with addresses 3, 6 and 20 is not allowed, as their addresses must
be 1, 2 and 3. Relay boards and energizers are addressed separately from
1 to 32. On the FG7 module, an address offset of 32 is added to all relay
boards. Therefore, relay board 1 will be referred to as 33 (1+32), relay board 2
as 34 (2+32) etc. on the FG7. [4] e. Ensure jumpers JP5 B and C are populated. Jumpers JP5 A and D can either be
populated or not. [5]
f. Connect the GND, A and B wires coming from the
DATA OUT of the previous RS485 network device
to the DATA IN GND, A and B terminals of the relay
board. [6]
g. Connect the GND, A and B wires going to the next
RS485 network device to th e DATA OUT GND,
A and B terminals of the relay board. [6]
h. Power up the relay board once all data connections in the daisy chain ring has
been completed. (The NEMTEK Power Pack can be used to power the relay
board)
Page 25
25
7 RS485 Network F
5. For energizer synchronisation:
a. Follow steps 3. a – d in
this section to install the
RS485 board and keypad,
if not already completed.
Ensure the power is
disconnected before
continuing. b. Choose one energizer in
the network that will be
used as the master for
synchronisation.
Connect a single core wire
from the master energizer’s
sync terminal (marked
SYNC) to the synchronisation
input terminal (marked IN)
of the RS485 board. [1, 2]
c. Connect the SYNC GND, A and B wires going to the next energizer’s RS485
synchronisation terminals to the SYNC OUT GND (marked G), A and B
terminals of the master energizer’s RS485 board. [3]
d. Configure jumper JP4 like in the figure on the right. [7]
5
Page 26
7 RS485 Network G
e. Reconnect the battery and mains power. [4, 5]
f. Repeat step a. and d. for all other slave energizers on the network. g. Connect a single core wire from the slave energizer’s sync terminal (marked
SYNC) to the synchronisation output terminal (OUT) of the RS485 board. [1, 2]
h. Connect the SYNC GND, A and B wires going to the next energizer’s RS485
synchronisation terminals to the SYNC OUT GND (marked G), A and B
terminals of the energizer’s RS485 board. If this is the last energizer in the
network DO NOT connect the SYNC OUT terminals to the first energizer. [3]
i. Connect the SYNC GND, A and B wires coming from the previous energizer’s
RS485 synchronisation terminals to the SYNC IN GND (marked G), A and B
terminals of the energizer’s RS485 board. [3]
j. Enter installer mode by entering 012345*0# on the keypad. Ensure the
energizer LCD display turns purple. [6] k. Enter 5030*# to put the slave energizer in passive synchronisation mode. Do
not perform this step for the master energizer. l. Exit installer mode by entering *#. Ensure the energizer LCD display turns blue. [6] m. Route the cables out the bottom of t he energizer enclosure and install th e lid . n. All energizers on the network should now pulse at the same time when activated.
26
Page 27
27
7 RS485 Network H
7.2 Star Network Setup
The example diagram below illustrates the required hardware and wiring required for an RS485 star network setup. The NEMTEK Power Pack may be used to provide a 12V supply with battery backup to the FG7 and 8-way Relay Board. Note that all RS485 5-core cables should have a maximum length of 1000m and the 10-way ribbon should have a maximum length of 1m. It is recommen ded that the 5-core cables for RS485 communication are shielded and that the shields are grounded only at one end of the cable to prevent ground loops.
To set up the network, follow these steps:
1. For the connection setup between the PC and FG7 module, refer to the FG7
installer manual. The PC to FG7 link is optional to run the NEMTEK Fenceprobe
software.
Page 28
28
7 RS485 Network I
2. For the FG7:
a. Disconnect the power and open the NEMTEK FG7 (Refer to the FG7
Installer Manual).
b. Connect the GND, A and B wires going to the all RS485 network device IN
terminals, as explained in steps 3 and 4, to the RS485 OUT GND, A and B terminals of the FG7. Since more than one network device may be connected to the FG7, it will be necessary to add all the wires together in the same screw terminal. [1]
c. Connect the A and B wires going to the all RS485 network device OUT
terminals, as explained in steps 3 and 4, to the RS485 IN A and B terminals of the FG7. Since more than one network device may be connected to the FG7, it will be necessary to add all the wires together in the same screw
terminal. The ground wire does not need to be connected in this step. [2] d. Configure the LINE BIAS jumper JP1 to ENABLE. [3] e. Configure the RX EN and TX EN jumpers JP2 and JP3 to ENABLE. [4] f. Configure the SERIAL SELECT jumper JP7 to RSXXX. [5] g. Configure the RSXXX jumper JP8 to RS485. [6] h. Close the FG7. i. Power up the FG7, when all network connections have been done. j. Configure the FG7 software by referring to the FG7 Installer Manual.
Page 29
7 RS485 Network J
3. For the Druid LCD 2x energizer:
a. Disconne ct the energizer mains
and battery power. [1, 2]
b. Install the RS485 board on top
of the battery brace and fasten with 4 screws. [3]
c. Install the 10-way ribbon
cable between the energizer and RS485 board. [4]
d. Connect a keypad to the
energizer. [5]
e. Connect the GND, A and B
wires coming from the DATA OUT of the FG7 to the DATA IN GND (marked G), A and B terminals of the RS485 board. [6]
f. Connect the A and B wires coming from the DATA IN of the FG7 to the
DATA OUT A and B terminals of the RS485 board. It is not necessary to connect the GND terminals in this step. [6]
g. Configure jumpers JP1, JP2, JP3, JP5 and JP6 like
in the figure on the right. For jumper functions refer to the RS485 board installer manual. [7]
5
29
Page 30
30
7 RS485 Network K
h. Ensure the energizer is restored to factory defau lt:
i. Reconnect the battery power. [2] ii. Reconnect the mains power. [1] iii. Within 60 seconds of reconnecting the power, enter 2389# on the keypad.
i. Enter installer mode by entering 012345*0# on the keypad. Ensure the
energizer LCD display turns purple. [8]
j. Configure the network address from by entering 51xx*#, where xx is the
address from 1 to 32. Energizer addresses must be chronologically configured starting at 1. For example, three energizers on a network with addresses 5, 18 and 22 is not allowed, as they need to be addressed 1, 2 and 3. Relay boards and energizers are addressed separately from 1 to 32.
k. Exit installer mode by entering *#. Ensure the energizer LCD display turns blue. [8] l. Ensure the energizer network address is displayed on the LCD. [8] m. Route the cables out the bottom of the e n er gi z er enclosure and install the lid.
4. For the RS485 8-way Relay Board:
a. Disconnect the power connector. [1] b. Configure jumper JP1 for “NO” for data pass through. [2] c. Configure jumper JP2 for daisy chain. [3]
Page 31
31
7 RS485 Network L
d. Configure the address of each relay board chronologically using jumpers JP7 1
to 16. When all jumpers are populated, the address is 1. When a jumper is removed, the corresponding number will be added to the network address. For example, if jumpers 1, 4 and 8 are removed, the address will be 1+1+4+8=14. The first relay board in the network MUST be configured as address 1, the second as address 2 etc. Addressing, for example, 3 boards in the network with addresses 3, 6 and 20 is not allowed, as their addresses must be 1, 2 and 3. Relay boards and energizers are addressed separately from 1 to
32. On the FG7 module, an address offset of 32 is added to all relay boards. Therefore, relay board 1 will be referred to as 33 (1+32), relay board 2 as 34 (2+32) etc. on the FG7. [4]
e. Ensure jumpers JP5 C is populated and JP5 B not. Jumpers JP5 A and D can
either be populated or not. [5]
f. Connect the GND, A and B wires coming from the
DATA OUT of the FG7 to the DATA IN GND, A and B terminals of the relay board. [6]
g. Connect the GND, A and B wires coming from
the DATA IN of the FG7 to the DATA OUT GND, A and B terminals of the relay board. [6]
h. Power up the relay board once all data connections
in the multi-drop network has been completed (The NEMTEK Power Pack can be used to power the relay board).
5. For the NEMTEK GPS Module:
For the GPS module setup refer to step 6 in section 6.1.
Page 32
32
7 RS485 Network M
7.3 RS485/Optic Fibre Network Setup
Where RS485 communication further than 1000m are required, the long-distance cables can be replaced with optic fibre. The RS485 signals are converted to and from optic signals, by using a pair of RS485/optic fibre converters. Either Single-Mode converters and cable, with a maximum distance of 20km, or Multi-Mode converter and cable, with a maximum distance of 2km, may be used. These converters require a 12 Vdc power supply (not shown in figure), which can be supplied by the NEMTEK Power Pack. The diagrams below show the different possible optic fibre configurations. Note the wiring from the RS485/Fibre converter to the energizers or relay boards must be in a star topology and will not function correctly if wired in a daisy chain topology.
To set up the network, follow these steps:
1. For the connection setup between the PC and FG7 module, refer to the FG7 installer manual. The PC to FG7 link is optional to run the NEMTEK Fenceprobe
software.
Page 33
33
7 RS485 Network N
2. For the FG7:
a. Set the FG7 up by following the steps in section 7.1 b. Connect the GND, RX+ and RX- wires going to the first RS485/fibre converter
to the RS458 OUT GND, A and B terminals of the FG7 (see FG7 figure in section 7.1).
c. Connect the GND, TX+ and TX- wires coming from the of the last RS485/fibre
converter back to the RS485 IN GND, A and B terminals of the FG7 (see FG7 figure in section 7.1).
3. For the RS485/fibre converters on the FG7 side:
a. Connect the GND, A and B wires coming
from the output of the FG7 to the GND, RX+ and RX- of the first RS485/fibre converter.
b. Connect the GND, TX+ and TX- wires to the next RS485/fibre converter’s GND,
RX+ and RX- terminals, to form a chain.
c. Connect the GND, A and B wires going
to the input of the FG7 to the GND, TX+ and TX- of the last RS485/fibre converter, to complete the chain.
d. Connect the fibre optic cable going to
the RX port of the RS485/fibre converter at the energizers or relay boards, to the TX port.
e. Connect the fibre optic cable going to
the TX port of the RS485/fibre converter at the energizers or relay boards, to the RX port.
Page 34
34
7 RS485 Network O
4. For the RS485/fibre converters on the energizer/relay board side:
a. Connect the wires going to the
DATA IN GND, A and B of all energizers and relay boards, to the GND, TX+ and TX- connectors of the RS485/fibre converter.
b. Connect the wires going to the
DATA OUT A and B of all energizers and relay boards, to the RX+ and RX­connectors of the RS485/fibre converter. It is not necessary to connect the GND wire.
c. Connect the optic fibre cables as mentioned for the converters on the FG7 side.
5. For the Druid LCD 2x energizer:
Set up the energizer by following the steps in section 7.2 and replacing the FG7 with the RS485/fibre converter. The converter’s TX+ and TX- terminals are the same as the FG7’s RS485 Output A and B terminals. The converter’s RX+ and RX­terminals are the same as the FG7’s RS485 Input A and B terminals.
6. For the RS485 8-way Relay Board:
Set up the relay board by following the steps in section 7.2 and replacing the FG7 with the RS485/fibre converter. The converter’s TX+ and TX- terminals are the same as the FG7’s RS485 Output A and B terminals. The converter’s RX+ and RX­terminals are the same as the FG7’s RS485 Input A and B terminals.
7. For the NEMTEK GPS Module:
For the GPS module setup refer to step 6 in the section 6.1 section.
Page 35
35
7 RS485 Network P
To set up the network, follow t hese steps:
1. For the connection setup between the PC and FG7 module, refer to the FG7 installer manual. The PC to FG7 link is optional to run the NEMTEK Fenceprobe software.
2. For the FG7:
a. Set the FG7 up by following the steps in section 7.2 . b. Connect the GND, RX+ and RX- wires going to all RS485/fibre converters to the
RS458 OUT GND, A and B ter mina l s of t he F G7 (s ee FG 7 f ig ur e in sectio n 7. 2).
c. Connect the GND, TX+ and TX- wires coming from all the RS485/fibre
converters to the RS485 IN GND, A and B terminals of the FG7 (see FG7 figure in section 7.2).
Page 36
36
7 RS485 Network Q
3. For the RS485/fibre converters on the FG7 side:
a. Connect the GND, A and B wires coming
from the output of the FG7 to the GND, RX+ and RX- of all the RS485/fibre converters.
b. Connect the A and B wires going to the
input of the FG7 to the TX+ and TX- of all the RS485/fibre converters. It is not necessary to connect the ground wire.
c. Connect the fibre optic cable going to
the RX port of the RS485/fibre converter at the energizers or relay boards, to the TX port.
d. Connect the fibre optic cable going to
the TX port of the RS485/fibre converter at the energizers or relay boards, to the RX port.
4. For the RS485/fibre converters on the energizer/relay board side:
Set up the RS485/fibre converters as explained in step 4 of the previous topology.
5. For the Druid LCD 2x:
Set up the energizer as explained in step 5 of the previous topology.
6. For the RS485 8-way Relay Board:
Set up the relay board as explained in step 6 of the previous topology.
7. For the NEMTEK GPS Module:
For the GPS module setup refer to step 6 in the section 6.1 section.
Page 37
37
7 RS485 Network R
To set up the network, foll ow t hese steps:
1. For the connection setup between the PC and FG7 module, refer to the FG7
installer manual. The PC to FG7 link is optional to run the NEMTEK Fenceprobe software.
2. There will only be one RS485/fibre converter per network device (FG7,
Energizer, Relay board) in this topology, but all wiring can be done as explained in the previous topology, ex ce pt for the fibre connections.
3. Connect the converters’ optic fibre ports in a daisy chain topology, making sure
the previous converter’s TX port is connected to the next converter’s RX port. The last converter’s TX port will must be connected back to the FG7’s converter’s RX port.
Page 38
38
8 Ethernet/Optic Fibre/RS485
Combined Network A
8 Ethernet/Optic Fibre/RS485 Combined Network
The example diagram below illu strat es the re qu i red h ardw are a nd w i ring re qu ir ed for a network that combines ethernet, optic fibr e a nd RS4 85 star topo lo gy. The N EMT EK Power Pack may be used to pro vi de a 12V supply with battery b ac kup F G7 a nd 8-way Relay Board and optic fibre converters. Note that the ethe r net, R S48 5 5-core and 10-way ribbon cables should have a maximum lengt h of 100m , 1000m and 1m respect ively . It is recommended that the 5-core cables for RS 485 co mm un ic at ion a re shie lde d a nd that the shields are grounded only a t one end of t he c able to p revent g round loo ps.
To set up the network, follow these steps:
1. For the connection setup between the PC and FG7 module, refer to the FG7 installer
manual. The PC to FG7 link is optional to run the NEMTEK Fenceprobe soft ware.
2. For the setup of the ethernet part of the network including the FG7, Nemlink
and Ethernet/Fibre converters, refer to section 5 (NEMTEK Ethernet Module Setup) and 6.2 (Ethernet/Optic Fibre Network Setup) of this document.
Page 39
39
8 Ethernet/Optic Fibre/RS485
Combined Network B
3. For the Nemlink Network IO:
a. Configure the ethernet module by referring to section 5 of this document. [1] b. Disconnect the power connector. [2] c. Connect the GND, A and B wires coming from the
DATA OUT of all the network devices in this network section to the DATA IN GND (marked G), A (marked AR_IO) and B (marked BR_IO) terminals of the Nemlink Network IO board. Since more than one network device may be connected to this board, it will be necessary to add all the wires together in the same screw terminal. [3]
d. Connect the A and B wires coming from the DATA IN
of all the network devices in this network section to the DATA OUT A (marked AL_IO) and B (marked BL_IO) terminals of the Nemlink Network IO board. It is not necessary to connect the GND terminals in this step. Since more than one network device may be connected to this board, it will be necessary to add all
the wires together in the same screw terminal. [3] e. Connect the ethernet cable to the board. [1] f. Connect the power connector. [2]
4. For the setup of the 8-way relay board and energizer in RS485 star topology, refer to section 7.2 of this document. Instead of connecting the devices to the FG7, as explained in section 7.2, connect them to the Nemlink Network IO board.
5. For the setup of the GPS module, refer to step 6 in section 6.1.
3
2
Page 40
40
The NEMTEK 8-way Smart IO Board can be used for one-to-one communication to a Druid
2x energizer or 8-way Relay Board. This is useful where the energizer needs remote communication to a third-party device like an alarm panel. The board provides 8 inputs and 8 relay outputs that can be independently linked to different inputs and outputs of the energizer (or 8-way Relay Board), by using the software application. The figure below shows the possible connections. Although the boards and energizers are connected on an Ethernet network in the third diagram, every Smart IO Board can only communicate to one energizer. The ethernet link between the two network switches can be replaced with an optic fibre link if longer distances are required. The NEMTEK Power Pack may be used to provide a 12V supply with battery backup to the FG7 and 8-way Smart IO Board.
9 8-Way Smart IO Board Setup
Page 41
9 8-Way Smart IO Board Setup
41
To set up the network successfully , fo llow these step s:
1. Configure all Ethernet Modules installed on the 8-way Smart IO Board, Nemlinks and 8-way Relay Boards by referring to section 5.
2. For the 8-way Smart IO Board:
a. Disconnect the power connector. [1] b. Configure the address of the board to 1, by populating jumpers JP7 1, 2, 4
and 16. Refer to section 6.1 step 5b for more detail. [2] c. Populate jumper JP7 A to put the board in programming mode. [3] d. Jumper JP7 C is only used when the board is connected to a Druid energizer.
When the jumper is populated, the Smart IO board will force the state of its
inputs onto the energizer and no cha nges wil l be pos s i bl e on t he energizer
itself. When the jumper is not populated changes are possible on the energizer
and the Smart IO board will only change the energizer state, once a change on
the Smart IO board inputs happen. [3] e. Jumpers JP7 B and D can either be populated, or not. [3] f. Connect the Smart IO board to a computer, using and ethernet cable. [4]
2
3
1
5
Page 42
42
9 8-Way Smart IO Board Setup
g. Download and save the NEMTEK SIO8Cfg setup software from
http://www.NEMTEK-druid-fenceprobe.com/
downloads/NemtekSmartIOCardConfigurationSoftware.exe h. Power up the board (The NEMTEK Power Pack can be used to power the
board). i. Open the NEMTEK SIO8Cfg.exe application on the computer j. Select the device (Druid 2x, TW Node or 8-way Relay Board) to which the
Smart IO board will be connected to by clicking on one of the three top tabs. k. Enter the same IP address (
ModuleStaticIP
) of the Smart IO board that was
configured in step one, in the IP address field, in the top right corner. l. Ensure 20108 is entered in the Port field, in the top right corner. m. If the Smart IO board will be connected to an energizer, map the energizer
status and alarms to the Smart IO relay outputs, by ticking appropriate boxes.
The Smart IO Board Inputs are preconfigured to activate certain functions on
the energizer and can’t be changed. For more detail refer to the Smart IO
board manual. n. If the Smart IO board will be connected to an 8-way Relay Board, map the
8-way Relay Board inputs to the Smart IO relay outputs, by ticking the
appropriate boxes. The Smart IO Board inputs are configured one-to-one to
the 8-way Relay Board’s outputs and can’t be changed. For more detail refer
to the Smart IO board manual. o. Click Send in the lower left corner. The VALID COMMAND LED will momentarily
flash on the Smart IO Board, indicating the board was programmed. [5] p. Remove jumper JP7 A. [3] q. Disconnect the board from the computer and connect to the energizer, relay
card or ethernet switch with an ethernet cable.
Page 43
43
9 8-Way Smart IO Board Setup
8. For the Druid LCD 2x energizer:
Set up the energizer by following the steps in section 6.1 and setting the energizer address to 1.
9. For the Ethernet 8-way Relay Board:
Set up the relay board by following the steps in section 6.1 and setting the board address to 1.
Rev 1.0, 5 June 2018
Print Code:
Loading...