Nelson R75M Maintenance & Operation Instructions

R75M Debris Sweeping Sprinkler
Maintenance & Operation Instructions
Squeeze tabs on the side of the plate assembly and pull.
Inspect the 7TN nozzle for plugging or damage. Replace if necessary.
Reinstall plate assembly. Guide shift lever between stops as shown in Fig. 4.
The R75M Debris Sweeping Sprin­kler requires a ridgid inlet pipe, at least 6” long.
R75DSS 8/16
1 2 3 4
NOZZLE COMES FACTORY INSTALLED. TO ACCESS THE NOZZLE:
[CLICK!]
SHIFT LEVER
Make sure shift lever is between stops as shown. Adjust stops to give desired arc of coverage
STOPS
RIDGID PIPE
6” Min.
Pressure
(psi)
#52 (13/32") 7TN Nozzle
Flow (gpm)
40 30.0
45 31.7
50 33.6
55 35.3
60 36.8
PERFORMANCE (U.S. UNITS)
Pressure
(bar)
#52 (13/32") 7TN Nozzle
Flow (m3/h)
2.75 6.8
3.00 7.1
3.50 7.7
4.00 8.2
PERFORMANCE (METRIC UNITS)
R75M Debris Sweeping Sprinkler 1 1/4” MNPT #12699-001
WARRANTY AND DISCLAIMER: Nelson Irrigation’s R75M Debris Sweeping Sprinkler is warranted for one year from date of original sale to be free of defective materials and workmanship when used within the working specications for which the products were designed and under normal use and service. The manufacturer assumes no responsibility for installation, removal or unauthorized repair of defective parts. The manufacturer’s liability under this warranty is limited solely to replacement or repair of defective parts and the manufacturer will not be liable for any crop or other consequential damages resulting from defects or breach of warranty. THIS WARRANTY IS EXPRESSLY IN LIEU OF ALL OTHER WARRANTIES, EXPRESS OR IMPLIED, INCLUDING THE WARRANTIES OF MERCHANTABILITY AND FITNESS FOR PARTICULAR PURPOSES AND OF ALL OTHER OBLIGATIONS OR LIABILITIES OF MANUFACTURER. No agent, employee or representative of the manufacturer has authority to waive, alter or add to the provisions of this warranty, nor to make any representations or warranty not contained herein. This sprinkler may be covered by one or more of the following U.S. Patent Numbers 6,814,305 and 6,827,291 and other U.S. Patents pending or corresponding issued or pending foreign patents.
R75 performance data has been obtained under ideal test con­ditions and may be adversely affected by wind, poor hydraulic entrance conditions or other factors. No representation regard­ing droplet condition, uniformity, application rate, or suitability for a particular application is made herein.
Nelson Irrigation Corporation
848 Airport Road,
Walla Walla WA 99362 U.S.A.
Tel: 509.525.7660
nelsonirrigation.com
Loading...