Nelson GA-2307, Nelson Heat Trace LPK-LM Insulation Entry Kit Installation Instructions

NELSON™ HEAT TRACE
LPK-LM INSULATION ENTRY SEAL KIT

DESCRIPTION

Note: This kit is designed to be mounted directly on the lagging material and requires a minimum clearance hole of
40mm (1.5625”)
1. Install gland fitting body on mounting plate and secure with the supplied locknut as shown in the diagram above.
2. Insert the cable through the gland fitting body allowing enough cable to reach desired termination location.
3. Apply silicone sealant to underside of mounting plate and position on lagging material. Secure in place with the
supplied screws.
4. Slide the grommet and retaining cap over the end of cable to be terminated.
5. Tighten retaining cap securely to gland fitting body. To avoid possible leaks, be careful not to over-tighten.
Sealing Grommet
Heating Cable
Mounting Plate
INSTALLATION
INSTRUCTIONS

KIT CONTENTS

1 Cable Gland, .M25 thread 1 Conduit Locknut 1 Grommet, Heating Cable 1 Mounting Plate, Stainless Steel 1 Tube of Silicone
Retaining Cap
Gland Fitting Body
*Metal Screws (4)
Locknut
*ITEMS NOT INCLUDED IN KIT
P. O. BOX 726 TULSA, OK 74101 TEL 918-627-5530 FAX 918-641-7336  www.nelsonheaters.com
GA-2307 Rev. 1
Sheet 1 of 1
April 2008
Loading...