National Instruments SCXI-1300, SCXI-1301 Installation Manual

INSTALLATION GUIDE
SCXI™-1300/1301 T
This guide describes how to install and use the SCXI-1300 and SCXI-1301 terminal block with your SCXI module.

Introduction

The following sections describe the SCXI-1300/1301 terminal blocks and their associated screw terminals.

SCXI-1300

Using the SCXI-1300 terminal block with 32-channel SCXI modules, you can conveniently connect signals through screw terminals. Your terminal block has the following features:
Seventy-two screw terminals
A cold-junction temperature sensor
Thirty-two pairs of screw terminals that connect to the 32 differential inputs of the SCXI module
Two screw terminals that connect to the module functional chassis ground pins
A solder lug available as a safety chassis ground
Additional screw terminals connect to the SCXI module OUTPUT, the SCXI module AOREF, and to the SCXIbus GUARD
ERMINALBLOCK

SCXI-1301

Using the SCXI-1301 terminal block, which has 20 screw terminals, you can conveniently connect signals to the SCXI-1140 module. Your terminal block has the following features:
Eight pairs of screw terminals connect to the eight differential inputs of the SCXI-1140 module
Two screw terminals that connect to the AGND of the module
Additional screw terminals that connect to the HOLD signal and functional chassis ground
LabVIEW™, National Instruments™, ni.com™, and SCXI™ are trademarks of National Instruments Corporation. Product and company names mentioned herein are trademarks or trade names of their respective companies.
322715A-01
Copyright 2000 National Instruments Corp. All rights reserved. May 2000

What You Need to Get Started

To set up and use your SCXI-1300/1301 terminal block, you need the following items:
SCXI-1300 or SCXI-1301 terminal blockSCXI-1300/1301 Terminal Block Installation GuideSCXI chassisSCXI moduleYour SCXI module user manualNumber 1 and 2 Phillips-head screwdrivers1/8 in. flathead screwdriverLong-nose pliersWire cutterWire insulation stripper
SCXI-1300/1301 Terminal Block 2 www.ni.com

Connecting Signal Wires to the Terminal Block

Connect signal wires to the terminal block using the following procedure, referring to Figures 1, 2, and 3 as necessary:
1. Unscrew the top cover screws and remove the top cover.
2. Loosen the strain-relief screws and remove the strain-relief bar.
2
1
Back View Front View
1 Strain-Relief Bar 2 Strain-Relief Screws
4
3 Earth-Ground
Solder Lug
3
Figure 1.
6
5
4 Mating Connector 5 Thumbscrew
SCXI-1300/1301 Parts Locator Diagram
6 Top Cover Screws 7 Top Cover
7
3. Run the signal wires through the strain-relief opening. You can add insulation or padding if necessary.
4. Prepare your signal wire by stripping the insulation to no more than 7 mm.
5. Connect the signal wires to the screw terminals by inserting the stripped end of the wire fully into the terminals and tighten the screws with a flathead screwdriver. Tighten the screws to a torque of 5 to 7 in.-lb.
Caution
Uninsulated wire extending past the screw terminal increases the risk of short
circuiting adjacent signals, causing the circuit to fail.
© National Instruments Corporation 3 SCXI-1300/1301 Terminal Block
Loading...
+ 7 hidden pages