FP-2000/2010 FieldPoint Quick Start Guide
1
Install the Network Module
1
Panel MountDIN Rail Mount
A. Unlock rail clip.
A. Unlock rail clip.
·
Network Module
·
Mounting Hardware (DIN rail
or panel mount accessory)
·
Terminal Base(s)
· I/O Module(s)
· Power Supply
· Accessories: Ethernet cable,
screwdriver
· PC running Windows
· FieldPoint Software CD
· LabVIEW RT
What You Need to Get Set Up
You can mount your modules on a DIN rail or to a panel.

B. Hook lip on back of module onto top
of DIN rail, press down, and snap
into place.
B. Snap panel mount accessory
(which you can order separately)
onto module.
Panel MountDIN Rail Mount
NOTE: Do not use spliced DIN
rails. Use only a single DIN rail.
C. Slide module into position and lock
rail clip.
C. Lock rail clip.
D. Use template that came with your
accessory to drill pilot holes and
mount module onto
panel using
accessory.
2

Install the Terminal Base(s)
CAUTION: Terminal bases must be connected to the network module
before applying power to the module. Do
not
connect or disconnect
terminal bases while power is applied to the network module.
2
DIN Rail Mount
A. Unlock rail clip.
B. Press base onto rail.
Panel Mount
A. Use template that came with your
accessory to drill pilot holes.
B. Connect terminal base to network
module connector, being careful not
to bend any connector pins.
C. Fasten terminal base to panel.
3

DIN Rail Mount
Panel Mount
D. Repeat for each terminal base, up
to nine for each network module in
most cases. You can use one or
two extender cables (which you can
order separately) if your FieldPoint
bank is too long for your available
space.
E. Place protective cover on last base,
and install rail locks at each end.
C. Slide into position and lock the rail
clip. Be careful not to bend any pins.
D. Repeat for each terminal base, up to
nine for each network module in
most cases. You can use one or two
extender cables (which you can order
separately) if your FieldPoint bank is
too long for your available space.
E. Place protective cover on last base.
4

3
Install the I/O Module(s)
A. Align slots on module with guide rails on
base, and press onto base until terminal
base’s latch locks the module in place.
B. Repeat for each I/O module.
It does not matter where you install each I/O module, except for
these types of situations:
····If you plan to cascade power between any I/O modules using the
V and C terminals, those modules should be grouped together.
····For more accurate measurements, you might want to locate any
thermocouple modules away from heat sources, including network
modules or relay modules, unless you are mounting them on an FP-TB-3.
4
Connect the Network Cables
Connect the FP-2000/2010 to an Ethernet network by connecting the RJ-45
Ethernet port of the FP-2000/2010 to an Ethernet hub using a standard
Category 5 Ethernet cable.
Straight-Through
UTP Cable
Straight-Through
UTP Cable
5

Do not use a cable longer than 100 m. If you are using a 100 Mbps Ethernet,
National Instruments recommends using a Category 5 shielded twisted-pair
Ethernet. If you need to build your own cable, refer to the
FP-2000/2010
User Manual
specifications section for cabling details.
5
Wire Power to Your FieldPoint System
A. Connect 12-30 VDC power supply leads to V and C terminals of the
network module. If you want to verify that your power supply is sufficient
for your modules and devices, refer to the
FP-2000/2010 User Manual
for
instructions on calculating power requirements.
B. Connect power to the FieldPoint modules that require external power for
outputs (output modules, counter modules, PWM, PG, QUAD). Refer to
the I/O module’s operating instructions for power requirement details.
You can power a module by connecting the V and C inputs on its terminal
base to a separate power supply, connecting the V and C outputs of a
neighboring terminal base or network module, or using a combination of
both methods. If you want to power field I/O devices from a terminal
base, supply power to the terminal base, and then connect the terminal
base V and C output terminals to the field device.
Optionally, you can connect an FP-2000/2010 directly to a computer using an
Ethernet crossover cable.
Cross-Over Cable
6

CAUTION: Cascading power from neighboring bases or network modules
defeats isolation between cascaded modules.
CAUTION: Cascading
power defeats isolation.
Shades of gray indicate
different voltage potentials.
Separate Power Supply
(Recommended)
Cascaded Power
(Reduces Isolation)
FP-2000 FP-AI-100 FP-AO-200 FP-RLY-420 FP-TC-120
No External
Power Required
7
V
1
32
C
17
18
15
31 32 C
16 V

6
Connect to Field Devices
Use each I/O module’s operating instructions, or the diagram under its
removable label, to help you connect your field devices.
FP-AI-110
Self-Powered
Floating Sensor
15
32
Loop-Powered
Sensor
17
2
I
Sensor
Channel 0
V
Sensor
Channel 7
To Po we r
Supply
NOTE: Either the self-powered
sensor or power supply should be
floating (not tied to earth ground).

7
Power Up Your FieldPoint System
CAUTION: Terminal bases must be connected to the FP-2000/2010
before power is applied to the FP-2000/2010.
Plug in each power supply
to your FieldPoint bank. You
should see the POWER and
STATUS LEDs come on. After
about 5 seconds, the STATUS
LED begins flashing, one flash
at a time. This indicates that
the FP-2000/2010 is ready to
be configured. (If the STATUS
LED turns off, and the A, B, C,
and D LEDs come on, the FP-2000/2010 has been configured and LabVIEW
RT is starting up.) If the LEDs do not follow this sequence, refer to the
FP-2000/2010 User Manual
troubleshooting appendix.
After the hardware is installed, you should verify communication, configure
the modules, and configure your power-up states and watchdog settings.
If you are using National Instruments FieldPoint software for these tasks,
continue to the following section.
9

8
Install the FieldPoint Software
A. Close all other applications. If you
plan to install National Instruments
development software such as
Lookout, LabVIEW, or Measurement
Studio, install them before you
install the FieldPoint software.
B. Insert the FieldPoint software CD and follow the onscreen instructions.
9
Configure the FP-2000/2010
Refer to the
FP-2000/2010 User Manual
for more information about
configuration settings.
A. Select Start»Programs»National Instruments FieldPoint»FieldPoint Explorer.
B. Click the + to expand the view.
C. Right-click on the
FieldPoint icon and
select Add a comm
resource to this
server.
10

D. In the Comm Resource
Configuration dialog box, select
Ethernet as the Type.
E. Click Browse to launch Remote
System Explorer.
F. Double-click the serial
number of the
FP-2000/2010 to
configure it.
11

G. On the Network Settings tab, enter
values for the IP address and
Subnet mask.
• IP address is the address of the
FP-2000/2010 on the network.
• Subnet mask is the code that one
device uses to determine whether
another device is on the same
subnet (255.255.255.0 is the
most common).
H. On the System tab, you can enter a
comment to help you identify the
FP-2000/2010 module.
12

I. On the Servers tab, enter a value
for the Time Server, which is the
address of the host computer that
runs the National Instruments
Time Service (installed with
Lookout 4.x, FieldPoint 2.x and 3.x,
or LabVIEW DSC.).
J. Click on OK and click Yes when
prompted to restart the
FP-2000/2010.
K. Highlight the FP-2000/2010
and click the Select button.
13

A. In the Comm Resource Configuration
dialog box, click on Find Devices.
B. Expand the +FP Res item on the left side
of the Explorer window to
see the devices and items
found on the network.
If your modules are not
listed, check the cable and
connections and make sure
the modules are all
powered on. If you still
have problems, refer to
your
FP-2000/2010 User Manual
for troubleshooting information.
C. Select an input module and click on the start monitoring button to
view live data.
D. Select an output channel and click on the write button to change
outputs.
E. Select File»Save.
Verify the Installation
10
14

11
Configure I/O Modules
A. Right-click on the device name in FieldPoint Explorer and select
Edit this Device.
B. Click on the Channel Configuration button to bring up the Channel
Configuration dialog box.
C. Select the type of
channel to show,
then select the
channel(s) that
you want to
change. To select
more than one
channel, uncheck
the One channel
at a time box.
NOTE: Configuration options are module-dependent. The options
shown here might not be available for your particular module.
Refer to your I/O module operating instructions for details on
configuration options.
15

D. Set the range and output values of the selected channel(s).
E. Set the attributes for the selected channel(s) by selecting the attribute and
entering the desired value.
F. Send commands to the selected channel(s) by choosing a command and
value and clicking on Send.
G. Repeat this procedure for each channel or group of channels you want
to configure.
H. Click on the OK button when you are finished, or click on the Apply
button to save the changes and continue to configure channels. When
you click on OK or Apply, the changes are immediately sent to the device.
I. Select File»Save when you are done.
12
Where to Go from Here
After you get your hardware up and running, you might want to implement
features such as power-up defaults, network watchdog settings, or security.
Refer to your
FP-2000/2010 User Manual
or online help for information
about features, configuration, application development, and troubleshooting.
16

17
FP-2000/2010 Specifications
Installation
Terminal wiring ......................16-26AWGcopper conductor wire with 7 mm
(0.275 in) strip length
Torque for screw terminals .............0.5–0.6Nm(4.4–5.3 in-lbs)
Network
Network interface ....................10BaseT and 100BaseTX Ethernet
Compatibility........................IEEE 802.3
Communications rate .................10Mbps, 100 Mbps, autonegotiated
Maximum cabling distance .............100m/segment
Power supply range ..................12to30VDC
Power consumption ..................4.5W+ 1.1
*
(I/Omodule power requirements)
Maximum terminal bases per bank .......9
Maximum number of banks .............determined by network topology
Weight ............................278 g(9.8 oz.)
Environmental
FieldPoint modules are intended for indoor use only.
Operating temperature.................–25to+55 °C
Storage temperature ..................–55to+85 °C
Humidity...........................10% to 90% to RH, noncondensing
Maximum altitude ....................2,000 m
Pollution degree .....................2

Safety
The FP-2000/2010 meets the requirements of the following standards for safety and electrical
equipment for measurement, control, and laboratory use:
• EN 61010-1:1993/A2:1995, IEC 61010-1:1990/A2:1995
• UL 3101-1:1993, UL 3111-1:1994, UL 3121:1998
• CAN/CSA c22.2 no. 1010.1:1992?A2:1997
Electromagnetic Compatibility
CE, C-Tick and FCC Part 15 (Class A) Compliant
Electrical emissions...................EN55011 Class A at 10 m FCC Part 15A
above 1 GHz
Electrical immunity ...................Evaluated to EN 61326: 1997/A1:1998, Table 1
NOTE: For full EMC compliance, you must operate this device with shielded cabling.
See the Declaration of Conformity (DoC) for this product for any additional regulatory
compliance information. To obtain the DoC for this product, click Declaration of
Conformity at ni.com/hardref.nsf/.
18

Mechanical Dimensions
Dimensions are given in millimeters [inches].
19
109.5
[4.31]
91.44 [3.60]
107.19 [4.22]

United States 512 795-8248
Australia 03 9879 5166, Austria 0662 45 7990 0, Belgium 02 757 00 20,
Brazil 011 284 5011, Canada (Calgary) 403 274 9391, Canada (Montreal) 514 288 5722,
Canada (Ottawa) 613 233 5949, Canada (Québec) 514 694 8521,
Canada (Toronto) 905 7850085, China (Shanghai) 021 6555 7838,
China (ShenZhen) 0755 3904939, Denmark 45 76 26 00, Finland 09 725 725 11,
France 01 48 14 24 24, Germany 089 741 31 30, Greece 30 1 42 96 427,
Hong Kong 2645 3186, India 91805275406, Israel 03 6120092, Italy 02 413091,
Japan 03 5472 2970, Korea 02 596 7456, Malaysia 603 9596711,
Mexico 5 280 7625, Netherlands 0348 433466, New Zealand 09914 0488,
Norway 32 27 73 00, Poland 0 22 52894 06, Portugal 351 1 726 9011,
Singapore 2265886, Spain 91 640 0085, Sweden 08 587 895 00,
Switzerland 056 200 51 51, Taiwan 02 2528 7227, United Kingdom 01635 523545
Copyright 2001 © National Instruments Corporation.
All rights reserved. CVI™, FieldPoint™, LabVIEW™, Lookout™, Measurement Studio™,
and ni.com™ are trademarks of National Instruments Corporation. Product and company names
mentioned herein are trademarks or trade names of their respective companies.
*322759B-01*
322759B-01 Jul01