NACECARE SOLUTIONS
Jet Steam 1500
NOTE: As with all electrical equipment, care and attention must be exercised at all times
during its use, in addition to ensuring that routine and preventative maintenance is carried out
periodically in order to ensure its safe operation. In particular the electrical supply cable and
flexible hose should be regularly inspected by a competent person and immediate action taken to
rectify any faults found. Failure to carry out maintenance as necessary, including replacement of
parts to the correct standard, could render the equipment unsafe and the manufacturer can accept
no responsibility in this respect. See the enclosed exploded drawings for correct replacement
parts.
_____________________________________________________
MACHINE OPERATION
Please see the enclosed machine and accessory drawings to identify components mentioned
below.
A) ELECTRICAL SUPPLY
Before operating the machine, make sure that the electrical requirements are met. The Jet Steam
1500 is designed to operate on 115V power supply fused with a 15 amp breaker. Insert the plug
into a 115V grounded outlet.
B) FILLING WITH WATER
Unscrew the valve cap (1) and add water using the fill bottle provided. When the boiler is full,
the valve on the fill bottle activate, preventing overfilling.
WARNING: Do not use any chemical agents in the boiler. This could cause blockages and
deterioration rendering the warranty null and void.
C) ATTACHING HOSE
Insert the steam hose (4) into the steam hose outlet (2) found on the front of the machine. This
fitting locks into place. It is recommended that hoses be fitted to the machine before turning the
boiler on.
D) BOILER ACTIVATION
Activate the boiler switch (5) and the steam/vacuum command switch (7). The handle control
switch (8) should be in the OFF position. When the water is heated to operating temperature the
green ready steam indicator (6) will light.
E) STEAM ACTIVATION
When the unit has reached operating temperature, steam will issue from the machine when the
steam command switch (8) is turned on. When the tools are cold, water caused by internal
condensation will issue from the nozzle before the steam. Steam volume can be regulated by
turning the steam volume knob (12) clockwise for minimum volume and counter-clockwise for
maximum steam. If the steam volume knob is turned all the way closkwise, the flow of steam
will be cut off.
F) ATTACHING ACCESSORY TOOLS
Note: The steam command switch (8) should be in the off position when changing tools.
To steam clean choose the appropriate accessory (e.g. rectangular brush (11), steam nozzle (17),
detailing brush (16)). Connect the extension tubes (15) and secure in place by setting the quick
release latches (9 & 10). You may choose to use one or more extension tubes. When using the
large rectangular or triangular brushes, wrap a cloth around them in order to maximize the
cleaning effect and collection of dirt. Use the special clamps provided on the tools to secure the
cloth in place.
G) REFILLING
When the water is depleted from the boiler, the red low water indicator (13) will light. It will
then be necessary to re-fill the boiler to continue use. Due to internal pressure it is not possible
to remove the valve cap (1). To release the internal pressure, turn the boiler switch off and turn
the steam command switch (8) on. This will release the internal pressure. Once the pressure is
reduced, the valve cap can be removed.
SAFETY DEVICES
The Jet Steam is fitted with 5 independent safety devices.
1) pressure switch
2) thermostat
3) safety valve (22)
4) temperature limiter
5) 12 Volt handle control switches
2