![](/html/a1/a17d/a17de9bacf805fd72ae878dddb83bffbb6d1c409abc51b94e8ff189637fac17b/bg1.png)
CONTEMPORARY DRINKING FOUNTAINS
I N S TALLAT I O N / M A I N T E N A N C E I N S T R U C T I O N S
WATER COOLERS
I N S TALLAT I O N / M A I N T E N A N C E I N S T R U C T I O N S
INSTALLATION INSTRUCTIONS FOR GRT75-PF-RFS PET FOUNTAIN
Important: Read all instructions and refer to local codes
prior to installation.
l Local soil conditions may require more gravel for
drainage.
l It is recommended to include a supply stop
appropriately located on the supply line.
l An in-line PRV installed on the supply line is
recommended to ensure a working water pressure of 4060 psi.
l A water filter should be installed on the supply line if
sediment or mineral content is a problem.
l Provide 30" x 30" x 6" deep concrete pad minimum.
Prepare trench for water supply line and waste line (if
required). At fountain location prepare hole to trench depth
and large enough for a person to work. Lay supply and
waste into trench allowing extra length to be trimmed
during hook-up.
Depending on code and design requirements, drain may
be open, French or sanitary connection. For French drain,
place a minimum of three cubic feet of gravel under drain
opening. Local soil conditions may require more gravel
drainage.
Refill trench and hole, compacting back fill as required.
Leave sufficient depth in hole to accommodate concrete
pour.
Prepare the slab area surrounding fountain spreading and
compacting gravel as necessary. Prepare form
approximately 6" diameter to protect supply and waste
stub outs.
If required, fix 1/4”-20 UNC L-bolt anchors by others in
position arranging L-bolts according to pattern indicated
and pour concrete to grade. Leave enough thread for
mounting base. Ensure concrete top surface is flat and
level. If concrete has cured use appropriate ½” concrete
anchoring hardware by others following the manufacturer's
installation recommendations.
For freeze resistant option refer to
-FRU manual #9938-340-0M1.
3
" OD x 4" LONG
8
COPPER TUBE
30" x 30" x 6" DEEP
4"
MIN. CONCRETE PAD
`
4"
GRAVEL
EARTH
2" PVC DWV
RECOMMENDED
GRAVEL
MINIMUM 3 CUBIC FEET OF
POROUS GRAVEL FILL
7
7
8
TYP
"
BUBBLER
ORIENTATION
MOUNTING BASE DETAIL
Ø6"
PUSHBUTTON
ORIENTATION
9
Ø
"
16
Ø13"
1
Ø11
"
8
Valve Specifications:
Please visit www.murdock.com
for most current specifications.
Minimum/Maximum Pressure:
30/100 PSI
MURDOCK MFG. • 15125 Proctor Avenue • City of Industry, CA 91746 USA
Phone 800-453-7465 or 626-333-2543 • Fax 626-855-4860 • www.murdockmfg.com
9938-159-M01
Page 1 of 3
FROST LINE
WATER
SUPPLY
Member of
07/21/14
![](/html/a1/a17d/a17de9bacf805fd72ae878dddb83bffbb6d1c409abc51b94e8ff189637fac17b/bg2.png)
CONTEMPORARY DRINKING FOUNTAINS
I N S TALLAT I O N / M A I N T E N A N C E I N S T R U C T I O N S
WATER COOLERS
I N S TALLAT I O N / M A I N T E N A N C E I N S T R U C T I O N S
Allow concrete to cure before completing installation.
Remove basin from pedestal and set aside. Align
anchoring studs to pedestal mounting holes and secure
pedestal to slab. To ensure plumb installation, lay a bubble
level on fountain bowl and adjust using shims or washers
until unit is level.
Make up connections to 3/8" OD (1/4" nominal) x 4" long
copper tube with inline Y-strainer. Make up waste
connection to 1-1/4" OD tailpiece provided.
Turn on water supply and test operation of bubbler by
depressing button and adjust flow rate as required. Check
all connections for leaks.
Turn on water supply and test for proper operation and
checking for leaks.
FYI: Protect exposed valve assembly, tubing and tube
openings to prevent damage to equipment or to prevent
tubes from becoming filled with soil or debris.
Rough-in water supply for 3/8" OD (1/4" nominal) x 4" long
copper tube connected to inline Y-strainer inlet provided. A
supply stop by others is recommended.
Test operation of bubbler by depressing button and adjust
flow rate as required. Check all connections for leaks.
All normal maintenance is done from above ground.
v Always shut off water supply when doing any
maintenance.
v To remove pushbutton assembly remove bowl
from housing. From inside of the housing, remove
inlet and outlet lines from push-in ports of valve
body. Using a spanner wrench remove pushbutton
and retaining ring.
v To replace regulator, use a spanner wrench to
remove pushbutton and retaining ring from the
flange collar. Use a spanner wrench to remove
retainer from the inside of the flange collar. Remove
regulator, insert new regulator and align ports to new
regulator with mating ports of valve body then
replace retaining ring.
v To access bubbler, remove bowl from housing
assembly. Remove bubbler plug with a spanner
wrench and remove nut holding bubbler in place.
v Re-assemble in reverse order. When replacing
inlet and outlet lines, ensure to insert supply line into
valve port labeled “IN”. Ensure plastic lines are not
kinked when fountain is reassembled.
Ø3/16"
HOLE
DECREASE
FLOW
INCREASE
FLOW
SLOTTED
SCREWDRIVER
FLOW ADJUSTMENT
Please visit www.murdock.com
for most current specifications.
MURDOCK MFG. • 15125 Proctor Avenue • City of Industry, CA 91746 USA
Phone 800-453-7465 or 626-333-2543 • Fax 626-855-4860 • www.murdockmfg.com
9938-159-M01
Retaining
Ring
Page 2 of 3
Fiber Ring
Pushbutton
1/4" Push-In
Elbows
Regulator
Rubber Gasket
Valve Body w/
Flange Collar
Brass Nut
Retainer
Member of
07/21/14