![](/html/27/2721/272105a87a4844b9b90fa3e6e3f25f4c32e28be8a82b68c412cff0afe7b95eb5/bg2.png)
The following is to keep in mind before putting the
machine into operation and carry out:
• The machine must be in balance
• The pump selector switch (illuminates blue in the operating
and indicating that the feed pump operates) must not be
pressed
• Fill the supplied water canister with DISTILLED water, put into
the provided recess of the machine and insert the hose with
the pump into the canister
• Put the fog fluid canister also in the provided recess and
insert the fluid hose into the canister