mr. steam MS-65T, MS-90T, MS-300T, MS-400T, MS-150T Maintance Manual

...
Page 1
Residential Steambath Generator Systems
____________________________________________________________
Installation, Operation & Maintenance Manual
A Lifetime of Pleasure
®
MrSteam
®
Page 2
2. Check with a physician before use of the Steambath if you are pregnant, have a coronary condition, are in
poor health, are being treated for any other medical condition, or are using medication or drugs.
3. Exit Steam Room immediately if you feel faint, dizzy, sleepy, or otherwise uncomfortable.
4. Do not use the Steambath if you have recently consumed alcohol.
5. Condensation and moisture may cause the the Steambath floor and other surfaces to become slippery and
dangerous. Installation of non-skid floor materials or the use of proper footwear is recommended at all times.
IMPORTANT!
Read the manual provided for use and safety information.
MODELS:
____
MS-65T MS-90T MS-150T MS-225T MS-300T MS-400T MS-SUPER 1T MS-SUPER 2T MS-SUPER 3T MS-Super 4T MS-Super 5T MS-Super 6T
IMPORTANT NOTE
:
As you follow these instructions, you will notice warning and caution symbols. This blocked information is important for the safe and efficient installation and operation of this generator. These are types of potential hazards that may occur during this installation and operation:
All information in these instructions is based on the latest product information available at the time of publication. Sussman-Automatic Corporation reserves the right to make changes at any time without notice.
!
WARNING
!
CAUTION
Table of Contents: . . . . . . Page
Before Installing. . . . . . . . . . . . . . . . . . . . . 1
Steam Room Guidelines . . . . . . . . . . . . . . . 1
Locating the Steam Generator Unit. . . . . . 2
Typical Installation . . . . . . . . . . . . . . . . . . . 2
MS Super-4T, 5T, 6T Typical Installation . . . 3
Installation . . . . . . . . . . . . . . . . . . . . . . . . . 4
Plumbing
Water Supply
Generator Dimensions . . . . . . . . . . . . . . . . 5
Electrical Specifications . . . . . . . . . . . . . . . 6
Field Power Wiring. . . . . . . . . . . . . . . . . . . 7
Wiring Diagrams . . . . . . . . . . . . . . . . . 8 –10
Initial Start-Up and Checkout. . . . . . . . . . 11
Maintenance . . . . . . . . . . . . . . . . . . . . . . 11
Optional AutoFlush System . . . . . . . . 12–13
Using AromaSteam Essential Oils. . . . . . . 13
Liquid Level Control Board. . . . . . . . . . . . 14
Select Your MrSteam Model. . . . . . . . . . . 15
Replacement Parts Diagram . . . . . . . . . . . 16
Replacement Parts List . . . . . . . . . . . . . . . 17
states a hazard may cause serious injury or death if precautions are not followed.
signals a situation where minor injury or product damage may occur if you do not follow instructions.
IMPORTANT NOTE:
This highlights information that is especially relevant to a problem-free installation.
PUR 101289 Rev. 6.3/03
MrSteam
®
Residential Steambath Generator Systems
Installation,Operation & Maintenance Manual
A Division of Sussman-Automatic Corporation
43-20 34th Street, Long Island City, NY 11101 • (718) 937-4500 1-800-767- 8326 • Fax: (718) 472-3256 • www.mrsteam.com
Western Regional Offices
9410 S. La Cienega Blvd., Inglewood CA 90301 1-800 72 STEAM (1-800 727-8326) • Fax: (310) 216-2944
Steam Outlet Steam Head
Made in USA
Listed Steam Bath
Generator 777D
ANSI
Drain Safety Valve
MODEL____________ Serial No._________________
PEEL & STICK WARNING
Note:
MrSteam strongly recommends that this warning be peeled off and posted in a conspicuous location near the steambath.
MrSteam
®
Sussman Lifestyle Group
®
43-20 34th Street , Long Island City NY 11101 • 1 800 76 STEAM • www.mrsteam.com
PUR100378 6.3/03
WARNING
!
Page 3
MrSteam
®
Installation, Operation & Maintenance Manual
IMPORTANT:
The following general information should be used in conjunction with consultations with your architect,
designer and contractor in determining all factors necessary in providing a suitable and safe steam room.
Read these instructions before installation or service. Although this MS steambath generator has been fully qualified for ship­ment by MrSteam, the following must be reviewed for proper, safe and enjoyable steam bathing.
Verify that the model and accessories are correct, including incoming line voltage.
Insure steambath generator has been correctly sized for the steambath room. Pay particular attention to room volume and construction. If any questions, please refer to MrSteam sizing guide enclosed.
(see page 15)
Marble or glass walls or ceilings, or exterior walls “ENLARGE” the room’s size, requiring a generator larger than one based only on the room’s cubic foot (L x H x W) volume.
The physical size of the unit, clearance for plumbing servicing, and its distance from the steam room must all be consid­ered before final installation.
IMPORTANT
:
MrSteam units are intended to be operated with MrSteam TEMPO/PLUS,TEMPO,TEMPO/REMOTE and TEMPO/EXT Controls only, and are to be installed strictly in accordance with the specific instructions contained in this man­ual and as supplied in the manuals provided with the controls.
ELECTRICAL SHOCK HAZARD. MrSteam steam generators are connected to 240V line voltage and contain live electrical components. All installation and service to be performed by qualified and licensed
electricians and plumbers only. Installation or service by unqualified persons may void the warranty.
1.
Steam room must be completely enclosed, with full walls, door, floor and ceiling.
2.
It is recommended that a gasketed door is used for heat sealing and steam containment.
3.
If tile-type or other smooth surfaced flooring is used provide suitable anti-skid strips or equivalent, to prevent user slipping
and injury.
4.
Walls and ceilings must be constructed of water-resistant, non-corrosive surface, such as tile, marble, molded acrylic, or
other non-porous material.The ceiling should be sloped to prevent dripping of condensate. If acrylic, fiberglass or other non-heat resistant materials are used as part of the steamroom enclosure, see page 4, "Steamhead" for additional details.
5.
Provide a floor drain.
6.
No heating, venting or air conditioning devices should be installed inside the steam room.
7.
Steam room construction information is available from the Tile Council of America, Inc. at (864) 646-8453 or
www.tileusa.com.
8.
MrSteam strongly recommends that a warning be posted in a conspicuous location near the steambath.
A peel-off warning has been provided (on the inside front cover) for installation. See Warning facsimile below.
The MS series of steam generators are for residential use only. Commercial or other non residential applications void the warranty and may adversely affect product performance.
Before Installing
1
Steam Room Guidelines
!
WARNING
!
WARNING
2. Check with a physician before use of the Steambath if you are pregnant, have a coronary condition, are in
poor health, are being treated for any other medical condition, or are using medication or drugs.
3. Exit Steam Room immediately if you feel faint, dizzy, sleepy, or otherwise uncomfortable.
4. Do not use the Steambath if you have recently consumed alcohol.
5. Condensation and moisture may cause the the Steambath floor and other surfaces to become slippery and
dangerous. Installation of non-skid floor materials or the use of proper footwear is recommended at all times.
IMPORTANT!
Read the manual provided for use and safety information.
MrSteam
®
Sussman Lifestyle Group
®
43-20 34th Street , Long Island City NY 11101 • 1 800 76 STEAM • www.mrsteam.com
PUR100378 6.3/03
WARNING
!
Page 4
Mr
Steam
®
Installation, Operation & Maintenance Manual
Select a location as near as practical to the steam room.Typical locations include: closet, vanity cabinet, heated attic or basement.
1.
Locate steambath generator within 25 feet of steam room.
2.
Do not install steambath generator inside steam room.
3.
Do not
install steambath generator outdoors or wherever environmental conditions may affect the safety and/or
performance of the generator.
4.
Do not install steambath generator in unheated attic or any locations where water could freeze.
5.
Do not
install steambath generator near flammable or corrosive materials or chemicals such as gasoline, paint thinners, or
the like. Installation in areas having high concentrations of chlorine (such as pool equipment room) must be avoided.
6.
Install steambath generator on a solid and level surface.
7.
Install steambath generator in an upright position only.
8.
Install anti-water hammer device as required.
9.
Provide a minimum of (12) inches to both ends and top of the steam generator or as required for servicing. See page (5).
10.
Provide unions as required to facilitate installation and disconnection of piping.
11. IMPORTANT:
Steam line, safety valve
, drain valve, plumbing and steamheads become hot during operation and remain hot after shutdown for a period of time. Provide appropriate protection, including insulating plumbing lines. Avoid plumbing runs and steamhead locations that can come in contact with bathers.
12.
MrSteam controls can be located inside the steam room or on the outside of the steam room. See separate CONTROL INSTALLATION AND OPERATION INSTRUCTIONS for specific details. If the controls are located outside the steamroom, a remote sensor (part number MSTS) is required.
NOTE: The TEMPO series controls are suitable for use with UL Listed MrSteam generators and for use in a wet environment.
The MS series of steam generators are for residential use only. Commercial or other
non-residential applications void the warranty and may adversely affect product performance. Use only MrSteam TEMPO series controls.
Locating the Steam Generator Unit
Typical MrSteam Installation
P
A
U
S
E
O
N
O
F
F
T EM
P
T I M
E
O N O FF
P A U
S E
P R
O G
1
P
R O
G
2
T EM
P
T I M
E
O N O FF
P A U
S E
P R
O G
1
P
R O
G
2
2
!
WARNING
NOTE:
For illustrative purposes only.
Consult with qualified designer, architect or contractor for steam room construction details.
Provide unions as required to facilitate installation and disconnect of piping
Steam generator
Field installed power supply
Field installed steam supply pipe
Valve is
shown open
Control cable
Steam Head (shown with optional acrylic shield) See page 4 for Steam Head Installation information
TEMPO®or TEMPO/PLUS® Control See Control Manual for installation information
Field installed water supply pipe
Page 5
Mr
Steam
®
Installation, Operation & Maintenance Manual
MS Super 4T, 5T, 6T Typical Configuration
3
Diagram B
Assembled and Installed
MS Super 4T, 5T, 6T
Typical Installation shown
with Optional AutoFlush
Diagram A
Printed Circuit Board Component shown enlarged for illustrative purpose.
Interconnecting Cable PN: 103904
Primary Unit
Secondary Unit
TEMPO/PLUS Control
Optional AutoFlush, see AutoFlush Installation pg. 11
Provide unions as required to facilitate installation and disconnection of piping
Steam Heads
NOTE:
For illustrative purposes only. Consult with qualified
designer, architiect or contractor for steam room construction details.
NOTE:
For illustrative purposes only.
Units shown prior to plumbing and installation.
Installation Instructions for Models: MS-Super 4T, MS-Super 5T and MS-Super 6T
1.
Install each steam generator as in a single installation.
Install generators as close as possible to each other, not exceeding 12 feet.The interconnecting cable length is 12 feet.
2. IMPORTANT:
Power must be disconnected at the main electrical supply. Remove steam generator covers. Retain screws and cover for reuse.
3.
Connect the TEMPO/PLUS control to either unit per
instructions supplied with the TEMPO/PLUS control.
4.
Remove one knock-out on each generator as shown.
Insert the ends of interconnecting cable provided (PN 103904) through the knock-outs as shown in Diagram A. Connect each end to the printed circuit board connector labeled "TANDEM" as shown.
5.
Connect separate plumbing and power supplies for
each unit. Replace covers with cover screws.
Power
Supply
Page 6
MrSteam
®
Installation, Operation & Maintenance Manual
Plumbing
All plumbing shall be performed by a qualified licnesed plumber and in accordance with applicable National and local codes.
• Use unions on all pipe connections.
• Use only brass piping or copper tubing
• Do not use black, galvanized or PVC pipe.
Water Supply (3/8” NPT)
1.
Connect hot or cold water line. Hot water line is preferable, however hot water should not exceed 160° F.
2.
Provide a shut off valve in the water supply line upstream of the steambath generator.
3.
Do not overheat inlet solenoid valve with solder connections. Overheating will damage parts.
4.
Flush inlet water line thoroughly before making connection to unit.
5.
Strainer recommended upstream of feed water connection.
6.
For best performance water pressure should be 15 to 20 PSIG. Reduce pressure as required if necessary.
7.
Provide anti-water hammer device as required.
Steam Outlet (1/2” NPT)
1.
Do not install a valve in steam line. Flow of steam must be unobstructed.
2.
Use 1/2-inch brass pipe or copper tubing from unit to steam head.
3.
Insulate steam line using pipe insulation rated 250° F or higher.
4.
Pitch steam line 1/4" per foot towards steam head or steam generator to avoid valleys and trapping of condensate.
NOTE:
Running the steam line down and then up will create a steam trap blocking the flow of steam.
Steam Head (1/2” NPT)
INSTALLER: Because the steam head and direct steam emissions are very hot, locate the steam head where incidental contact by bather with the steam head or direct steam emission cannot occur.
1.
Locate steam head 6-12 inches above floor, except for
Tub/shower enclosures, install 6 inches above tub top edge.
For enclosures with acrylic or other non-heat resistant flooring install Acrylic Shield Part Number MS-103412.
2.
Install steam head with steam slot facing downward.
IMPORTANT:
To preserve steam head finish, do not use wrench or other tools to tighten. Hand tightening is sufficient when Teflon or equal pipe thread sealing compound is used. Use no abrasive cleansers or chemicals. Use only mild soap and sponge.
3.
IMPORTANT:
Consult with supplier of acrylic, fiberglass and other non-heat resistant enclosures for recommended steam head location.
Drain (1/2” NPT)
NOTE:
A drain valve is provided to facilitate servicing. Provide a drain line connection from steambath generator drain valve accord­ing to National and local Codes. Check local plumbing code for receptor, trap and vent requirements. Unit drains by gravity.
Safety Valve (3/4” NPT)
Where permitted by local codes, provide an outlet plumbing connection for safety valve.
To insure proper and automatic safety valve operation: DO NOT connect a shut off valve or a plug at safety valve outlet. DO NOT connect a shut off valve in steam supply pipe.
Installation
4
!
WARNING
!
CAUTION
Steam Supply Pipe
Steam Head
1/2" (without Acrylic Shield) 3/4" (with Acrylic Shield)
1/4" minimum clearance required when Acrylic Shield (PN 103412) is used. See installation instructions provided with the Acrylic Shield.
Fill gap with silicone or equal sealant as required for moisture seal.
Finished interior face of steam room wall
Use Teflon or equal sealant on pipe threads
Y Min Required for Steam Shield (PN 103412)
X
Finished Face of Steam Room Wall
Page 7
Mr
Steam
®
Installation, Operation & Maintenance Manual
Field Power Wiring
7
Models MS 65T – MS 400T (single phase wiring shown)
L1, L2, Ground by field wiring
L1, L2, Ground by field wiring
Models MS Super 1T – MS Super 6T (single phase wiring shown)
_________________________________________________ TO AVOID EQUIPMENT DAMAGE DO NOT CONNECT
POWER SUPPLY DIRECTLY TO ELEMENTS !!! _________________________________________________
!
CAUTION
NOTE:
For illustrative purposes only. Consult with qualified licensed
electrician for electrical installation.
_________________________________________________ TO AVOID EQUIPMENT DAMAGE DO NOT CONNECT
POWER SUPPLY DIRECTLY TO ELEMENTS !!! _________________________________________________
!
CAUTION
NOTE:
For illustrative purposes only. Consult with qualified licensed
electrician for electrical installation.
(conduit and fittings
Ground Lug
Ground
L1
L2
Contactor
Knockout
omitted for clarity)
(conduit and fittings
omitted for clarity)
Knock-out
Power block
L1
L2
Ground
Ground lug
Fuse
Fuse block
Contactor
Page 8
MrSteam
®
Installation, Operation & Maintenance Manual
8
Wiring Diagrams
ELEMENT
OUND
OR
C
POWER INPUT
POWER INPUT
FUSES
LEGEND
L1
L2
G
GROUND
SOLENOID
GREEN
PURPLE
SOLENOID
TRANSFORMER
GREEN
WHITE
LIGHT BLUE
WHITE
S
GRAY
WATER
FEED
VAVLE
TRANSFORMER
WHITE
LIGHT BLUE
WHITE
S
GRAY
WATER
FEED
VALVE
BLACK
BLACK
C
CONTACTOR
HEATING ELEMENT
L2
L1
BLACK
BLACK
CONTACT
WHITE
DARK BLUE
CONTROL BOARD
WHITE
DARK BLUE
CONTROL BOARD
PURPLE
PURPLE
TO PROBE
CABLE
CABLE
TO PROBE
CABLE
CABLE
SINGLE PHASE
MS-65T, MS-90T, MS-150T, MS-225T, MS-300T, MS-400T
TEMPO or TEMPO/PLUS CONTROL
TEMPO/EXT (optional)
AUTOFLUSH (optional)
SINGLE PHASE
MS-SUPER-1T MS SUPER-2T MS-SUPER-3
TEMPO or TEMPO/PLUS CONTROL
TEMPO/EXT (optional)
AUTOFLUSH (optional)
(All Diagrams)
FIELD WIRING
FACTORY WIRING
T
POWER INPUT
L2 L3
L1
BLACK
BLACK
GREEN
GROUND
C
CONTACTOR
WATER
FEED
HEATING ELEMENT
SOLENOID
VALVE
TRANSFORMER
WHITE
LIGHT BLUE
WHITE
S
GRAY
WHITE
DARK BLUE
CONTROL BOARD
PURPLE
TO PROBE
CABLE
CABLE
THREE PHASE
MS-65T, MS-90T, MS-150T, MS-225T, MS-300T, MS-400T, MS-SUPER-1T, MS SUPER-2T, MS-SUPER-3T
TEMPO or TEMPO/PLUS CONTROL
TEMPO/EXT (optional)
AUTOFLUSH (optional)
Page 9
Installation Instructions for Models: MS-Super 4T, MS-Super 5T and MS-Super 6T
1.
Install each unit as in a single installation as close to each other as possible.
2. IMPORTANT
Power must be disconnected at the main electrical supply. Remove steam generator covers.
3.
Connect the TEMPO/PLUS control to either unit per instructions supplied
with the TEMPO/PLUS control.
4.
Remove one knock-out on each generator as shown. Insert the ends of interconnecting cable provided
(PN 103904) through the knock-outs as shown in diagram A, page 3. Connect each end to the printed
circuit board as shown.
5.
Connect separate plumbing and power supplies for each unit.
Single Phase Wiring Diagram
with TEMPO
/
PLUS control
MrSteam
®
Installation, Operation & Maintenance Manual
9
R
D
Wiring Diagram: MS-Super 4T, MS-Super 5T,
MS-Super 6T Single Phase Models
NOTE:
Cable length is 12 feet
POWER INPUT
FUSES
HEATING ELEMENT
L2L1
BLACK
BLACK
GROUND
C
CONTACTOR
G
GREEN
WATER
FEED
SOLENOID
VALVE
TRANSFORMER
WHITE
LIGHT BLUE
WHITE
S
GRAY
WHITE
DARK
BLUE
CONTROL BOARD
PURPLE
TO PROBE
CABLE
CABLE
LEGEND
TEMPO/PLUS
TEMPO/EXT
(optional)
AUTOFLUSH
(optional)
(All Diagrams)
FIELD WIRING
FACTORY WIRING
POWER INPUT
L1 L2
BLACK
BLACK
FUSES
CONTACTO
G
GREEN
N
WATER
FEED
SOLENOID
VALVE
TRANSFORMER
WHITE
LIGHT
BLUE
WHITE
S
GRAY
WHITE DARK
BLUE
CONTROL BOARD
PURPLE
TO PROBE
CABLE
CABLE
TANDEM
CABLE
103904
AUTOFLUSH (optional)
Page 10
MrSteam
®
Installation, Operation & Maintenance Manual
10
Three Phase Wiring Diagram
with TEMPO/PLUS control
Installation Instructions for Models: MS-Super 4T, MS-Super 5T and MS-Super 6T
1.
Install each unit as in a single installation as close to each other as possible.
2. IMPORTANT:
Power must be disconnected at the main electrical supply. Remove steam generator covers.
3.
Connect the TEMPO/PLUS control to either unit per instructions supplied
with the TEMPO/PLUS control.
4.
Remove one knock-out on each generator as shown. Insert the ends of interconnecting cable provided
(PN 103904) through the knock-outs as shown in diagram A, page 3. Connect each end to the printed
circuit board as shown.
5.
Connect separate plumbing and power supplies for each unit.
Wiring Diagram: MS-Super 4T, MS-Super 5T,
MS-Super 6T Three Phase Models
NOTE:
Cable length is 12 feet
POWER INPUT
L3L2L1
BLACK
BLACK
G
GREEN
TRANSFORMER
DARK BLUE
WHITE
LEGEND
(All Diagrams)
FIELD WIRING
FACTORY WIRING
HEATING ELEMENT
POWER INPUT
L1 L2 L3
HEATING ELEMENT
GROUND
C
CONTACTOR
G
BLACK
BLACK
GROUND
C
CONTACTOR
WHITE
LIGHT BLUE
S
WATER
FEED
SOLENOID
VALVE
TRANSFORMER
GREEN
LIGHT BLUE
S
WATER
FEED
SOLENOID
VALVE
WHITE
GRAY
WHITE
GRAY
CONTROL BOARD
WHITE
DARK BLUE
CONTROL BOARD
PURPLE
PURPLE
TO PROBE
CABLE
CABLE
TO PROBE
CABLE
CABLE
TEMPO/PLUS
TEMPO/EXT
(optional)
AUTOFLUSH (optional)
TANDEM
CABLE
103904
AUTOFLUSH (optional)
Page 11
Installation Instructions
1.
Disconnect all power supplied to the unit.
2.
Plumbing to be performed by a qualified licensed
plumber and shall be in accordance with applicable National and Local Codes. Unit drains by gravity. A drain line that is lower than the AutoFlush assembly must be available.
The AutoFlush valve outlet is threaded 1/2" NPT. Check plumbing code for recep­tor, trap and vent requirements.
3.
Use copper or brass nipple 1/2" NPT x 3-1/2" or
longer (not supplied) to connect AutoFlush valve (end "B") to the Drain Valve (valve end “A” and “B” are indicated on bottom of AutoFlush Valve)
NOTE:
If there is not enough room for the valve, an
elbow and a short nipple (not provided) can be added.
4.
Open Drain Valve (handle must be aligned with
brass nipple as shown).
5.
Connect the AutoFlush cord connector to the two pin connector (C) as shown.
Do not drain into a steam enclosure or any location where accidental contact with drain water may occur. In the event of a power failure the Autoflush valve will open and discharge hot water.
(continued on next page)
Operation
The optional AutoFlush
®
feature automatically drains the MrSteam system follow­ing each use. The stainless steel tank is flushed and remains empty until the steam generator is used again. A time delay (about two hours) allows the water to cool down before it drains resulting in a safe and gentle operation.
MrSteam
®
Installation, Operation & Maintenance Manual
Optional AutoFlush
®
System
12
Mr
S
team
AutoFlush Cord
AutoFlush Valve
(2) Pin Connector for AutoFlush
(9) Pin Connector
for Tempo and
Tempo/Plus Controls
AutoFlush Cord Connector
Drain Valve
(shown in the correct
open position)
Steam Generator
Nipple
(copper or brass nipple
1/2" NPT x 3-1/2" or
longer (not supplied)
End "B" End "A"
Plumb to Drain Line in accordance with Code
Arrow indicates correct direction of flow
BOX CONTENTS:
• AutoFlush Valve with Cord
• Installation instructions.
Drain Valve
Steam Generator
Nipple
Plumb to Drain Line
AutoFlush
Valve
!
WARNING
(3) Pin Connector
for Tempo/Ext
AutoFlush shown fully assembled
NOTE:
For illustrative purposes only.
MrSteam
Page 12
MrSteam
®
Installation, Operation & Maintenance Manual
Enjoy Aromasteam essential oils by placing a drop or two into your Aromasteam steamhead as shown in the attached illustration. Only use
Mrsteam
AromaSteam Essential Oils in a
Mrsteam
Aromasteam steam head, or any other equivalent oil deemed suitable for use in the
Mrsteam
AromaSteam steamhead.
Use essential oils with caution. Essential oils are for
external use only. Keep out of reach of children. Essential oils are highly concentrated and are potent substances and should not be applied directly to the skin as they can be irritants. Use essential oils with caution.
Place the drops into the
Mrsteam
AromaSteam
steam head recess prior to turning on the steambath. Do not place drops in a hot steam head as SERIOUS INJURY CAN RESULT IF YOU DO NOT FOLLOW THIS WARNING.
Start with one drop to gauge strength and suitability. Limit to a maximum of a few drops during a
steambathing session. Some people may find that the aroma makes them dizzy and the user should exit the steam bath IMMEDIATELY. If skin irritation occurs stop using the oils immediately. Remove any excess oil by washing in mild soap and water. If ingested, rinse mouth with water.Administer water or milk to dilute. Contact a physician immediately.
Tightly close containers when storing oils. Keep away from sources of ignition.
Optional AutoFlush
®
System (cont.)
Using MrSteam Essential Oils
13
Sweat Fittings
When using sweat fittings use only tin base solder with a melting point below 600 degrees F. Do not overheat. Ends of water supply tubing must be thoroughly cleaned for a minimum distance of 1" from ends. Do not remove valve cover.
To Check Operation
1.
Turn on MrSteam and allow tank to fill with water. (see Mr Steam instruction manual)
2.
Turn off MrSteam control. Water should stay in tank.
3.
Turn off power at the panel box. Water should discharge from tank.
4.
Turn on power at panel box.
5.
Repeat
PROVIDE DRAIN PLUMBING ACCORDING TO LOCAL CODES. PLUMB AS REQUIRED FOR GRAVITY DRAIN SYSTEM.
!
CAUTION
!
CAUTION
!
CAUTION
!
CAUTION
AromaSteam 10ml bottle with integrated dropper
Recess for essential oil
AromSteam steam head
(install per instructions on page 4)
Steam emission slot
Page 13
MrSteam
®
Installation, Operation & Maintenance Manual
14
Liquid Level Control Board- Explanation of LED Indicators
With TEMPO or TEMPO/PLUS control OFF
______________________________________________________________________________________
DRY Water level indicator–LED is ON when no water is detected (for more that 5 seconds). OFF
when water level is satisfactory. For units with AutoFlush, if more that two hours have elapsed since last usage and this LED is OFF it is indicative of an autoflush or water level probe circuit malfunction.
______________________________________________________________________________________
75 MIN LED is ON when 75-minute time out feature is active.
______________________________________________________________________________________
5V +5 VDC indicator –LED is ON when there is 208/240 Volt incoming power connected,
24 Volt transformer secondary output and on-board 5 Volt DC control power are present.
______________________________________________________________________________________
With TEMPO or TEMPO/PLUS control ON
______________________________________________________________________________________
Room temperature status indicator–LED is ON when control is calling for heat, OFF when temperature is satisfied or PAUSE button is engaged.
______________________________________________________________________________________
Water feed solenoid relay indicator–LED is ON when relay is closed and sending 24 Volts to the water feed solenoid valve coil, OFF when water level is satisfied and relay is open.
______________________________________________________________________________________
AutoFlush relay indicator–LED is ON when relay is closed an sending 24 Volts to AutoFlush valve motor (closing valve).
______________________________________________________________________________________
Contactor relay indicator–LED is ON when relay is closed and sending 24 Volts to the contactor coil. (This LED comes ON after LED's ”DRY” & “RLY HTR” go OFF.)
______________________________________________________________________________________
HTR
RLY WTR
RLY FLUSH
RLY HTR
Liquid Level Control Board
PN 103899 (shown without wiring)
Enlarged Detail
of LED Indicators
TANDEM MAIN CONTROL AUX
TEMP PROBE
Page 14
16
MrS
team
®
Installation, Operation & Maintenance Manual
MS Super Models MSSuper 1T-MSSuper 6T (with AutoFlush)
shown with cover removed
MS Regular Models MS65T - MS400T (with AutoFlush)
shown with cover removed
NOTE:
F
or illustrative purposes only.
Some components may be omitted or altered for clarity. Do not use for wiring, repair or other purposes not related to component identification.
NOTE:
F
or illustrative purposes only.
Some components may be omitted or altered for clarity. Do not use for wiring, repair or other purposes not related to component identification.
Transformer
Liquid Level
Power Block
Power Supply
Knock-Out
Liquid Level Probe
Access Cover
Control Board
Water Feed Solenoid
Water Feed
Plug and Play Connection
Water Feed Hose
(see page 11)
Steam Outlet
Safety Valve
AutoFlush Valve
(optional)
Heating Element
Stainless Steel Tank
Data Plate
Ground Lug
Power Block
Power Supply
Knock-Out
Liquid Level Probe
Access Cover
Fuse
Fuse Block
Contactor
Liquid Level Control Board
Transformer
Drain Line
Water Feed Solenoid
Plug and Play Connection
(see page 11)
Water Feed
Steam Outlet
Safety Valve
Water Feed Hose
Heating Element
Stainless Steel Tank
Data Plate
AutoFlush Valve
(optional)
Drain Line
Page 15
A Division of Sussman-Automatic Corporation
43-20 34th Street, Long Island City, NY 11101 • (718) 937-4500 •
1-800-767- 8326 • Fax: (718) 472-3256 • www.mrsteam.com
Western Regional Offices: 9410 S. La Cienega Blvd., Inglewood CA 90301 • 1-800 72 STEAM (1-800 727-8326) • Fax: (310) 216-2944
PUR 101289 Rev 6.3/03
Loading...