MRP Ribbon SETUP PROCEDURE AND SETTINGS CHART

SETUP PROCEDURE AND SETTINGS CHART
AIR FILL:
1. Unthread and remove the negative air chamber cap found on the bottom of the spring leg.
2. Attach a high-pressure, suspension specific pump to the valve and using the pump’s bleed button, remove all pressure. Remove the pump.
3. Unthread and remove the positive air chamber cap (at the top of the spring leg) and attach a high-pressure suspension specific pump to the valve.
5. Return to the negative air chamber; attach the pump, fill to the desired pressure, remove the pump, and re-install the negative air chamber cap.
REBOUND:
Utilize these recommened settings by turning the rebound knob fully clockwise then turning it back counter-clockwise until you reach the desired number of “clicks”.
Loading...