MRC x, x3, x5 Series Manual

on purchasing your new xSeries Reactor
Congratulations
®
MRC x3 & x5
Initial Inspection and Set-up
1.
Visually inspect the unit for any visible shipping
damages
2.
Loosen 6 thumb screws a few turns to allow the lid to turn clockwise, then remove by gently lifting straight up(Figure 1)
3.
Inspect the o-ring to ensure that it is undamaged, free of debris, and seated properly in the groove.
(Figure 2)
Figure 1
Figure 2
O-Ring groove
4.
Remove the top blue diffusing plate(Figure 3) and black sponge
5.
Locate and remove the parts pack which is inside the unit
6.
Make sure bottom sponge is pushed all the way down. Be careful of using your hand as the tube could get stuck around it or your arm. We recommend using rod or something similar to push the sponge flat to bottom plate.
7.
Using the provided 60" roll of PTFE tape and wrap both threads on the included barb fittings. Hint: Leave first thread or two unwrapped, be sure to wrap the fitting clock-wise or the same way the fitting turns installing. Otherwise you will unthread the tape lead to a leak. Fittings should be wrapped so snug when twisted in by hand. Be careful not too much tape or over tighten these fittings, unit may occur if done
damage to
the
when
and can
they are
to wrap
Figure 3
a
Figure 4
Water input
8.
Reassemble the unit, always hand tighten the six thumb screws. Using tools may damage the unit and/or Oring seal.
9.
On the lid the center fitting is the water input and outer fitting is the water return to system(Figure 4)
the
Water Return
Loading...
+ 1 hidden pages