MPP Solar 3k hybrid User Manual

Hybrid PV Inverter
Version: 2.1
Table Of Contents
1. Introduction ........................................................................................1
2. Important Safety Warning ..................................................................2
3. Unpacking & Overview ........................................................................4
3-1. Packing List ........................................................................................ 4
3-2. Product Overview ............................................................................... 4
4. Installation ..........................................................................................5
4-1. Selecting Mounting Location ................................................................ 5
4-2. Mounting Unit..................................................................................... 5
5. Grid (Utility) Connection ........................................................................7
5-1. Preparation ........................................................................................ 7
5-2. Connecting to the AC Utility ................................................................. 7
6. PV Module (DC) Connection ................................................................8
7. Battery Connection ........................................................................... 10
8. Load (AC Output) Connection .......................................................... 11
9. Communication ................................................................................ 12
10. Commissioning ................................................................................. 13
11. Initial Setup ...................................................................................... 14
12. Operation .......................................................................................... 27
12-1. Interface ........................................................................................ 27
12-2. LCD Information Define................................................................... 27
12-3. Button Definition ............................................................................ 29
12-4 Query Menu Operation ..................................................................... 29
12-5. Operation Mode & Display ............................................................... 34
13. Charging Management ..................................................................... 39
14. Applications with Energy Meter ........................................................ 41
15. Maintenance & Cleaning ................................................................... 42
16. Trouble Shooting ............................................................................... 43
16-1. Warning List ................................................................................... 43
16-2. Fault Reference Codes ..................................................................... 44
17. Specifications .................................................................................... 49
1
1. Introduction
This hybrid PV inverter can provide power to connected loads by utilizing PV power, utility power and battery power.
Figure 1 Basic hybrid PV System Overview
Depending on different power situations, this hybrid inverter is designed to generate continuous power from PV solar modules (solar panels), battery, and the utility. When MPP input voltage of PV modules is within acceptable range (see specification for the details), this inverter is able to generate power to feed the grid (utility) and charge battery. This inverter is only compatible with PV module types of single crystalline and poly crystalline. Do not connect any PV array types other than these two types of PV modules to the inverter. See Figure 1 for a simple diagram of a typical solar system with this hybrid inverter.
Note: When PV input voltage is lower than 250V for 3KW and 3KW plus and 150V for 2KW,
the power of PV input will de-rate.
PV module
Battery
Hybrid inverter
Distribution Box
Electric grids
Load
2
Conventions used: WARNING! Warnings identify conditions or practices that could result in personal injury; CAUTION! Caution identify conditions or practices that could result in damaged to the
unit or other equipment connected.
2. Important Safety Warning
Before using the inverter, please read all instructions and cautionary markings on the unit and this manual. Store the manual where it can be accessed easily.
This manual is for qualified personnel. The tasks described in this manual may be performed by qualified personnel only.
General Precaution-
WARNING! Before installing and using this inverter, read all instructions and cautionary
markings on the inverter and all appropriate sections of this guide.
WARNING! Normally grounded conductors may be ungrounded and energized when a ground fault is indicated.
WARNING! This inverter is heavy. It should be lifted by at least two persons.
CAUTION! Authorized service personnel should reduce the risk of electrical shock by
disconnecting AC, DC and battery power from the inverter before attempting any maintenance or cleaning or working on any circuits connected to the inverter. Turning off controls will not reduce this risk. Internal capacitors can remain charged for 5 minutes after disconnecting all sources of power.
CAUTION! Do not disassemble this inverter yourself. It contains no user-serviceable parts. Attempt to service this inverter yourself may cause a risk of electrical shock or fire and will void the warranty from the manufacturer.
CAUTION! To avoid a risk of fire and electric shock, make sure that existing wiring is in good condition and that the wire is not undersized. Do not operate the Inverter with damaged or substandard wiring.
CAUTION! Under high temperature environment, the cover of this inverter could be hot enough to cause skin burns if accidentally touched. Ensure that this inverter is away from normal traffic areas.
3
CAUTION! Use only recommended accessories from installer . Otherwise, not-qualified tools may cause a risk of fire, electric shock, or injury to persons.
CAUTION! To reduce risk of fire hazard, do not cover or obstruct the cooling fan.
CAUTION! Do not operate the Inverter if it has received a sharp blow, been dropped, or
otherwise damaged in any way. If the Inverter is damaged, called for an RMA (Return Material Authorization).
Symbols used in Equipment Markings
Refer to the operating instructions
Caution, risk of danger
Caution, risk of electric shock
Caution, risk of electric shock, Energy storage timed discharge
Caution, hot surface
4
3. Unpacking & Overview
3-1. Packing List
Before installation, please inspect the unit. Be sure that nothing inside the package is damaged. You should have received the following items inside of package:
Inverter unit Software CD Manual USB cable
3-2. Product Overview
1) PV connectors
2) Grid connectors
3) Battery connectors
4) AC output connectors (Load connection)
5) RS-232 communication port
6) USB communication port
7) Intelligent slot
8) Grounding
9) LCD display panel (Please check section 10 for detailed LCD operation)
10) Operation buttons
5
WARNING!! Remember that this inverter is heavy! Please be carefully when lifting out from the package.
WARNING!! FIRE HAZARD. SUITABLE FOR MOUNTING ON CONCRETE OR OTHER NON-COMBUSTIBLE SURFACE ONLY.
4. Installation
4-1. Selecting Mounting Location
Consider the following points before selecting where to install:
Do not mount the inverter on flammable construction materials. Mount on a solid surface This inverter can make noises during operation which may be perceived as a nuisance in
a living area.
Install this inverter at eye level in order to allow the LCD display to be read at all times. For proper air circulation to dissipate heat, allow a clearance of approx. 20 cm to the
side and approx. 50 cm above and below the unit.
Dusty conditions on the unit may impair the performance of this inverter. The ambient temperature should be between 0°C and 40°C and relative humidity should
be between 5% and 85% to ensure optimal operation.
The recommended installation position is to be adhered to (vertical). For proper operation of this inverter, please use appropriate cables for grid connection. The pollution degree of the inverter is PD2. Select an appropriate mounting location.
Install the solar inverter in a protected area that is dry, free of excessive dust and has adequate air flow. Do NOT operate it where the temperature and humidity is beyond the specific limits. (Please check the specs for the limitations.)
Installation position shall not prevent access to the disconnection means. This inverter is designed with IP20 for indoor applications only. Regularly clean the fan filter.
4-2. Mounting Unit
Installation to the wall should be implemented with the proper screws. After that, the device should be bolted on securely.
The inverter only can be used in a CLOSED ELECTRICAL OPERATING AREA.
6
1. Drill four holes in the marked locations
with four screws.
2. Place the unit on the surface and align the
mounting holes with the four screws.
3. Check if the solar inverter is firmly
secured.
Note: Recommended specs for screws.
7
Chart 2
5. Grid (Utility) Connection
5-1. Preparation
Before connecting to AC utility, please install a separate AC circuit breaker between inverter and AC utility. This will ensure the inverter can be securely disconnected during maintenance and fully protected from over current of AC input. NOTE1: Although this inverter is equipped with 250VAC/30A fuse, it’s still necessary to install a separate circuit breaker for safety consideration. Please use 250VAC/30A circuit breaker between inverter and AC utility. NOTE2: The overvoltage category of the AC input is III. It should be connected to the power distribution.
WARNING! It's very important for system safety and efficient operation to use appropriate cable for grid (utility) connection. To reduce risk of injury, please use the proper recommended cable size as below. Suggested cable requirement for AC wire
Model
2KW
3KW
3KW Plus
Nominal Grid Voltage
101/110/120/127 VAC
208/220/230/240 VAC
Conductor cross-section (mm2)
4~6
AWG no.
10~12
5-2. Connecting to the AC Utility
Step 1: Check the grid voltage and frequency with an AC voltmeter. It should be the same to VAC” value on the product label.
Step 2: Turn off the circuit breaker.
Step 3: Remove insulation sleeve 8 mm for three conductors. And shorten phase L and neutral conductor N 3 mm. Refer to chart 1.
Step 4: Connect wires according to polarities indicated on terminal block. Be sure to connect PE protective conductor ( ) first.
LLINE (brown or black)
Ground (yellow-green)
NNeutral (blue)
Step 5: Make sure the wires are securely connected. The reference tightening torque is 0.82 N.m.
Chart 1
8
Step 6: For safe operation, please use one more wire with ring terminal to connect grounding. Refer to Chart 3.
Chart 3
Recommended wire and terminal size:
Wire Size
Ring Terminal
Torque value
Cable mm2
Dimensions
D (mm)
L (mm)
10 AWG
6
4.3
21.8
1.2~ 2 Nm
6. PV Module (DC) Connection
CAUTION: Do NOT connect battery or DC source to PV connectors. Otherwise, it will cause
inverter damage. CAUTION: Before connecting to PV modules, please install separately a DC circuit breaker between inverter and PV modules. NOTE1: Please use 600VDC/20A circuit breaker for 3KW, 600VDC/25A for 3KW Plus; 500VDC/25A for 2KW. NOTE2: The overvoltage category of the PV input is II. Please follow below steps to implement PV module connection:
CAUTION: To prevent risk of electric shock, ensure the ground wire is properly earthed
before operating this hybrid inverter no matter the grid is connected or not.
WARNING: Because this inverter is non-isolated, only three types of PV modules are acceptable: single crystalline and poly crystalline only class A-reated and CIGS mdules. To avoid any malfunction, do not connect any PV modules with possibility of leakage current to the inverter. For example, grounded PV modules will cause leakage current to the inverter. When using CIGS modules, please be sure do NOT grounding. CAUTION: It’s requested to have PV junction box with surge protection. Otherwise, it will cause inverter damage when lightning occurs on PV modules.
Ring terminal:
9
Step 1: Check the input voltage of PV array modules. The acceptable input voltage of the solar inverter is 250VDC - 450VDC for 3KW/3KW Plus and 150VDC-320VDC for 2KW. This system is only applied with one string of PV array. Please make sure that the maximum current load of PV input connector is 13A for 3KW, 18A for 3KW Plus and 15A for 2KW.
Step 2: Disconnect the circuit breaker.
Step 3: Remove insulation sleeve 10 mm for positive and negative conductors. Refer to chart 4.
Step 4: Check correct polarity of connection cable from PV modules and PV input connectors. Then, connect positive pole (+) of connection cable to positive pole (+) of PV input connector. Connect negative pole (-) of connection cable to negative pole (-) of PV input connector. Refer to Chart 5.
Step 5: Make sure the wires are securely connected. The reference tightening torque is 1.22 N.m.
WARNING! It's very important for system safety and efficient operation to use appropriate cable for PV module connection. To reduce risk of injury, please use the proper recommended cable size as below.
Conductor cross-section (mm2)
AWG no.
4~6
10 ~ 12
CAUTION: Exceeding the maximum input voltage can destroy the unit!! Check the system before wire connection.
CAUTION: Do NOT touch the inverter to avoid electric shock. When PV modules are exposed to sunlight, it may generate DC voltage to the inverter.
CAUTION: Never directly touch terminals of the inverter. It will cause lethal electric shock.
Chart 5
Chart 4
10
7. Battery Connection
CAUTION: Before connecting to batteries, please install separately a DC circuit breaker
between inverter and batteries. NOTE: Please only use sealed lead acid battery, vented and Gel battery. Please check maximum charging voltage and current when first using this inverter. If using Lithium iron or Nicd battery, please consult with installer for the details. NOTE: Please use 60VDC/100A circuit breaker for 3KW/3KW Plus and 60VDC/80A circuit breaker for 2KW. Please follow below steps to implement battery connection: Step 1: Check the nominal voltage of batteries. The nominal input voltage for hybrid inverter is 48VDC.
Step 2: Use two battery cables. Remove insulation sleeve 12 mm and insert conductor into cable ring terminal. Refer to chart
6.
Step 3: Following battery polarity guide printed near the battery terminal! Place the external battery cable ring terminal over the battery terminal. Refer to Chart 7.
RED cable to the positive terminal (+); BLACK cable to the negative terminal (-).
Step 4: Make sure the wires are securely connected. The reference tightening torque is 2.04 N.m.
WARNING! It's very important for system safety and efficient operation to use appropriate cable for battery connection. To reduce risk of injury, please use the proper recommended cable size as below.
Model
2KW
3KW,3KW Plus
Nominal Grid Voltage
101/110/120/127 VAC
208/220/230/240 VAC
Conductor cross-section (mm2)
8
14
AWG no. 8 6
Chart 6
Chart 7
11
Chart 9
8. Load (AC Output) Connection
CAUTION: To prevent further supply to the load via the inverter during any mode of
operation, an additional disconnection device should be placed on in the building wiring installation. WARNING! It's very important for system safety and efficient operation to use appropriate cable for AC connection. To reduce risk of injury, please use the proper recommended cable size as below.
Model
2KW,
3KW
3KW Plus
Nominal Grid Voltage
101/110/120/127 VAC
208/220/230/240 VAC
Conductor cross-section (mm2)
4 ~ 6
AWG no.
10 ~ 12
Step 1: Remove insulation sleeve 8 mm for three conductors. And shorten phase L and neutral conductor N 3 mm. Refer to chart 8.
Step 2: Connect wires according to polarities indicated on terminal block. Be sure to connect PE protective
conductor ( ) first. Refer to Chart 9.
LLINE (brown or black)
Ground (yellow-green)
NNeutral (blue)
Step 3: Make sure the wires are securely connected. The reference tightening torque is 0.82 N.m.
CAUTION: It’s only allowed to connect load to “AC Output Connector”. Do NOT connect the utility to “AC Output Connector”. CAUTION: Be sure to connect L terminal of load to L terminal of “AC Output Connector and N terminal of load to N terminal of “AC Output Connector”. The G terminal of AC Output Connector is connected to grounding of the load. Do NOT mis-connect. CAUTION: This inverter is not allowed to operate in parallel. Please do NOT parallel connect more than one unit in AC output connector. Otherwise, it will damage this inverter.
Chart 8
12
9. Communication
The inverter is equipped with RS232 and USB ports and it is also equipped with a slot for alternative communication interfaces in order to communicate with a PC with corresponding software. This intelligent slot is suitable to install with SNMP card and Modbus card. Follow below procedure to connect communication wiring and install the software.
For RS232 port, you should use a DB9 cable as follows:
For USB port, you should use a USB cable as follows:
For SNMP or MODBUS card, you should use RJ45 cables as follows:
Please install monitoring software in your computer. Detailed information is listed in the next chapter. After software is installed, you may initial the monitoring software and extract data
through communication port.
13
10. Commissioning
Step 1: Check the following requirements before commissioning:
Ensure the inverter is firmly secured Check if the open circuit DC voltage of PV module meets requirement (Refer to Section
6)
Check if the open circuit utility voltage of the utility is at approximately same to the
nominal expected value from local utility company.
Check if connection of AC cable to grid (utility) is correct if the utility is required. Full connection to PV modules. AC circuit breaker (only applied when the utility is required), batter circuit breaker, and
DC circuit breaker are installed correctly.
Step 2: Switch on the battery circuit breaker and then switch on PV DC breaker. After that, if there is utility connection, please switch on the AC circuit breaker. At this moment, the inverter is turned on already. However, there is no output generation for loads. Then:
If LCD lights up to display the current inverter status, commissioning has been
successfully. After pressing ON button for 1 second when the utility is detected, this inverter will start to supply power to the loads. If no utility exists, simply press ON button for 3 seconds. Then, this inverter will start to supply power to the loads.
If red LED lights up, or warning/fault indicator appears in LCD, an error has occurred to
this inverter. Please inform your installer.
Step 3: Please insert CD into your computer and install monitoring software in your PC. Follow below steps to install software.
1. Follow the on-screen instructions to install the software.
2. When your computer restarts, the monitoring software will appear as shortcut icon located
in the system tray, near the clock.
NOTE: If using modbus card as communication interface, please install another bundled software. Check local dealer for the details.
14
11. Initial Setup
Before inverter operation, it’s required to set up Operation Mode via software. Please strictly follow below steps to set up. For more details, please check software manual. Step 1: After turning on the inverter and installing the software, please click “Open Monitor to enter main screen of this software.
Step 2: Log in into software first by entering default password administrator”. Step 3: Select Device Control>>MyPower Management. It is to set up inverter operation
mode and personalized interface. Refer to diagram below.
Mode
There are three operation modes: Grid-tie with backup, Grid-Tie and Off-Grid.
Grid-tie with backup: PV power can feed-in back to grid, provide power to the load
and charge battery. There are four options available in this mode: Grid-tie with backup I, II, III, IV and V. In this mode, users can configure
PV power supply
priority, charging source priority and load supply source priority.
However, when Grid-tie with backup IV option is selected in PV energy supply priority, the inverter is only operated between two working logics based on defined peak time and off-peak time of electricity. Only peak time and off-peak time of electricity are able to set up for optimized electricity usage.
Grid-Tie: PV power only can feed-in back to grid. Off-Grid: PV power only provides power to the load and charge battery. No feed-in
back to grid is allowed.
Loading...
+ 36 hidden pages