Montigo H34DLN, H34DLN-I, H34DLN-F, HC34DLM, H34DLL Installation & Maintenance Manual

...
High voltage
Toxic
Flammable materials
Corrosive
Fork lift trucks
Danger overhead crane
Explosion risk
Blank
High voltage
Toxic
Flammable materials
Corrosive
Fork lift trucks
Danger overhead crane
Explosion risk
Blank
High voltage
Toxic
Flammable materials
Corrosive
Fork lift trucks
Danger overhead crane
Explosion risk
Blank
High voltage
Toxic
Flammable materials
Corrosive
Fork lift trucks
Danger overhead crane
Explosion risk
Blank
Installation & Maintenance Manual
H34DL HC34DL (mobile home) H38DL H42DL
Indoor
DANGER
Read and understand this manual. Improper installation, adjustment, alteration, service or maintenance can cause serious injury, property damage or even death. For assistance or additional information consult a qualified installer, service agency or the gas supplier.
CAUTION
Glass doors on gas fireplaces are extremely hot while the fireplace is on and remain hot even after the fireplace has been turned off. Safety screens are available and can reduce the risks of severe burns. Please keep children away from the fireplace at all times.
Resi
dential
Gas Fireplace
WARNING
Do not store or use gasoline or any other flammable vapors and liquids in the vicinity of this or any other gas burning appliance. A fire or explosion my occur causing serious injury, property damage or even death.
NOTICE
Installer: Leave this manual with the appliance. Do not remove. Consumer: Retain this manual for maintenance and future reference. Do not Discard.
®
C US
Canadian Heating Products Inc. Langley, BC V4W 4A1 | Montigo Del Ray Corp. Ferndale, WA 98248
DANGER
IF YOU SMELL GAS
Do not try to light any appliance. Do not touch any electrical switch; do not use any phone in your building. Immediately call your gas supplier from a neighbor's phone. Follow the gas supplier's instructions. If you cannot reach your gas supplier, call the fire department.
120611XG0140
H-Series DL Indoor Gas Fireplace
NOTICE
You must read and understand this manual prior to installation, operation or troubleshooting this appliance. Please retain this owner’s manual for furure reference and maintenance.
Table of Contents
Safety Alert Key
Introduction ............................................................................... 3
Models............................................................................ 3
Installation
Before you Start ............................................................. 4
Installation Checklist ......................................................4
Section 1: Installation Overview and Product Dimensions ......5
Section 2: Framing the Fireplace ............................................. 6
Clearances ........................................................6
Installing the Standoffs ...................................... 6
Section 3: The Direct Vent System ................................... 7 - 16
Section 3-1: Converting from Top Vent to Rear Vent ....7
Section 3-2: Installing a Roof mounted Termination 8 - 9
Section 3-2-1: Venting Layout ......................................8
▪ Roof mounted Terminations
Standard Top Vent (no elbows or offsets)............. 8
Top Vent (two elbows one offset) ......................... 8
Top Vent (multi-elbows and offsets) ..................... 8
Standard Roof Vent (one elbows no offsets) ....... 9
Section 3-3: Installing a Wall mounted Termination . 10
Standard PTO Installation .................................... 10
Pre-installed MSR Frame .................................... 10
Pre-installed BSR Frame ..................................... 10
Installing MOSR Frame ....................................... 10
Installing VSS Termination Shield ......................... 10
Installing PTKOG Heat Guard .............................. 10
Section 3-3-1: Venting Layout ................................... 11
Top Vent, Wall mounted Graph, H34DL ................. 11
Top Vent, Wall mounted Graph, H38DL ................. 11
Top Vent, Wall mounted Graph, H42DL ................. 12
Top Vent, Wall mounted termination (one elbow) ....12
Top Vent, Wall mounted termination (multi elbow) ... 12
Rear Vent, Wall mounted Graph, H34DL ............... 13
Rear Vent, Wall mounted Graph, H38DL ............... 13
Rear Vent, Wall mounted Graph, H42DL ............... 14
Standard Rear Vent, (no elbows or offsets) ........... 14
Rear Vent, Wall mounted termination (two elbows) . 14
Rear Vent, Wall mounted termination (45° corner) .. 15 Rear Vent, Wall mounted termination (-45° corner) . 15
Section 3-3-2: Venting Components .............................. 16
Section 3-3-3: Heat Shields ......................................... 17
Installing a RHS7/8 Wall Mounted Heat Shield ....... 17
Installing a RHS100/101 Wall Mounted Heat Shield 17
Section 4: Wiring ................................................................... 18
SIT - Nova 820 gas control and pilot ..................... 18
SIT - Proame gas control and pilot ..................... 18
Honeywell gas control and pilot ........................... 18
Installing Remote On/Off Wall Switch .................... 19
Installing HFK Fan Kit .........................................19
Section 5: Installing the Gas Line .......................................... 20
Section 5-1: Section 5-2: Section 5-3:
Fuel Conversion ........................................ 20
Gas Pressure ............................................ 20
Gas Connection......................................... 20
Section 6: Finishing ............................................................... 21
Section 7: Installing and Removing the Door ........................ 22
Section 8: Installing the Accessories .............................. 23 - 25
Installing the H38DL & H42DL Log Set ...............24 - 25
Installing the Top / Bottom Horizontal Louvers ........... 25
Installing the H34DL Log Set ...................................23
Section 9: Operation ....................................................... 26 - 28
Start-up Sequence SIT Prolame Gas valve ...............27
Start-up Sequence with Honeywell Electronic Ignition 28
Maintenance .................................................................... 29 - 31
General ................................................................. 29
Hi-Lo Burner Adjustment ......................................... 29
Pilot Burner Adjustment ........................................... 29
Troubleshooting ....................................................... 30
SIT- Proame Gas Control Valve .......................... 30
Honeywell Gas Control Valve ............................... 30
Parts List ............................................................... 31
Appendix
D. Mobile Home. ..................................................... 35
Start-up Sequence with Continuous Pilot SIT Nova .... 26
Cleaning ................................................................ 29
SIT- Nova 820 Gas Control Valve ......................... 30
A. Termination Locations .......................................... 32
B. Warranty ............................................................ 33
C. State of Massachusetts. ......................................34
Page 2
XG0140 - 120611.1
H-Series DL Indoor Gas Fireplace
High voltage
Toxic
Flammable materials
Corrosive
Fork lift trucks
Danger overhead crane
Explosion risk
Blank
Safety Alert Key
DANGER WARNING
Indicates a hazardous situation which, if not avoided, WILL result in death or serious injury or property damage.
CAUTION NOTICE
Indicates a hazardous situation which, if not avoided, WILL result in minor or moderate injury.
Introduction
INTRODUCTION
Congratulations on your purchase of a Montigo Fireplace.
With over 30 years of experience, Montigo is committed to providing you with a gas replace that is not only a beautiful addition to your space, but that is also designed and manufactured to the highest safety, reliability and engineering standards.
We strongly encourage you to read and carefully follow the instructions laid out in this Installation, Operation and Maintenance Manual and retain it for your future reference. Pay special attention to all cautions, warnings, and notices throughout this manual intended to ensure your safety.
This manual covers installation, operation and maintenance. Lighting, operation and care of this replace can be easily performed by the homeowner. All installation and service work should be performed by a qualied or licensed installer, plumber or gas tter as certied by the state, province, region or governing body where the replace is being installed.
This installation, operation and maintenance manual is applicable to the models described below. Refer to your rating plate to verify included options. Throughout this manual instructions are applicable to all models designated as H*DL*unless otherwise noted in the Table.
Warranty and Installation Information: (See Appendix B) The Montigo warranty will be voided by, and Montigo disclaims any
responsibility for, the following actions:
XG140 - 120611.1
WARNING
Hot glass will cause burns. Do not touch glass until unit is cooled. Never allow children to touch glass.
Indicates a hazardous situation which, if not avoided, COULD result in death or serious injury or property damage.
Address practices that are important, but not related to personal injury
MODEL
H34DLN
H34DLN-I
H34DLN-F
HC34DLM
H34DLL
H34DLL-I
H34DLL-F
H38DLN
H38DLN-I
H38DLN-F
H38DLL
H38DLL-I
H38DLL-F
H42DLN
H42DLN-I
H42DLN-F
H42DLL
H42DLL-I
H42DLL-F
Natural Gas
Liquid Propane
Gas Rating
(BTU hr)
Traditional Burner /
Logset
Standing Pilot
Ignition
Honeywell Hot
Surface Ignition
X 18,000 X X
X 18,000 X X
X 18,000 X X
X X 22,000 X X
X 18,000 X X
X 18,000 X X
X 18,000 X X
X 26,000 X X
X 26,000 X X
X 26,000 X X
X 26,000 X X
X 26,000 X X
X 26,000 X X
X 34,000 X X
X 34,000 X X
X 34,000 X X
X 32,000 X X
X 32,000 X X
X 32,000 X X
SIT Electronic
Ignition
► Modication of the replace and/or components including Direct- Vent assembly or glass doors.
► Use of any component part not manufactured or approved by Montigo in combination with this Montigo replace system. ► Installation other than as instructed in this manual. Consult your local Gas Inspection Branch on installation requirements
for factory-built gas replaces. Installation & repairs should be done by a qualied contractor.
Page 3
H-Series DL Indoor Gas Fireplace
Installation and repairs should be done by an authorized gas fireplace service technician. The appliance should be inspected before use and at least annually by a professional. More frequesnt cleaning may be required due to exessive lint from carpeting, bedding material, ect. It is imperative that control compartments, burners and circulating air passageways of
Installation
IMPORTANT MESSAGE: SAVE THESE INSTRUCTIONS
The H*DL* Direct Vent replace must be installed in accordance with these Instructions. Carefully read all the Instructions in this manual rst. Consult the Local Gas Branch to determine the need for a permit prior to starting the installation. It is the responsibility of the installer to ensure this replace is installed in compliance with the manufacturers instructions and all applicable codes.
BEFORE YOU START:
NOTICE
the fireplace are kept clean.
CAUTION
Due to high operating temperatures, this appliance should be located out of traffic & away from furniture and draperies. Children and adults should be alerted to the hazards of the high surface temperature, which could cause burns or clothing ignition. Young children should be carefully supervised when they are in the same room as the appliance. Clothing or other flammable materials should not be placed on or near the appliance.
Installation Checklist
 Determine the desired install location of your replace.  See Section 1, Dimensions on Page 5, and refer to the Framing
Section 2 for details.
 Select the location of your termination and resulting vent run.
 Your selected termination location must be the highest point
in the Direct Vent installation.
 Should it be impossible to meet the venting requirements laid out
in Section 3: Venting, please contact your local Montigo dealer regarding the use of a Montigo Power Vent.
 Lay out the Vent run; calculating the required elbows and
straight runs of 4"/7" for H34DL or 5"/8" for H38DL & H42DL flex or rigid pipe.
 Layout Electrical Requirements Refer to Section 4: Wiring, for
Details.
 Refer to Section 5: Installing the Gas Line, for details on the
gas connection and access.
 Refer to local codes and guidelines for installation requirements.
 Installation and repairs should be done by a qualied
contractor and must conform to:
Installations in Canada must conform to the local codes or in the absence of local codes to the current version of Natural Gas and Propane Installation Code, CSA B149. Electrical Installations must conform to the local codes or, in the absence of local codes, to the current version of Canadian Electrical Code, CSA C22.1.1
Installations in the USA must conform to the local codes or in the absence of local codes to the current version of National Fuel Gas Code, ANSI Z223.1/NFPA 54. Electrical Installations must conform to the local codes or, in the absence of local codes, to the current version of the National Electrical Code, ANSI/NFPA 70. See Appendix C for installation within the State of Massachusetts.
DANGER
When this appliance is installed directly on any combustible material other than wood flooring, it must be installed on a metal or wood panel extending the full width and depth of the appliance or a fire will occur causing serious injury, property damage or even death.
Page 4
XG0140 - 120611.1
Installation
Section 1: Installation Overview and Product Dimensions
H-Series DL Gas Fireplace
Please review the Installation Checklist on Page 4 for general information on preparing for a successful installation of your replace.
The H*DL* replace may be installed in any location that maintains proper clearances to air conditioning ducts, electrical wiring and plumbing.
The replace dimensions are shown below:
H
K
I
J
C
C
L
J
L
K
G
Top View
D
D
C
D
Safety, as well as efciency of operation, should be considered when selecting the replace location. Select a location that does not interfere with room trafc, has adequate ventilation and offers an accessible path for Direct Vent installation.
G
K
J
H34DL*
H38DL*
H42DL*
B
F
A
Front View
B
L
LH-Side View
A B C D E F G H I J K L
7
33
/8 31 1/2 31 3/8 1 1/4 21 1/2 1 15 1/4 21 3/4 7 3/4 4 7 25
3
37
/4 34 1/2 34 1/4 1 1/4 24 1/2 1 16 1/4 25 9 1/4 5 8 27 3/4
1
42
/4 38 1/2 39 3/4 1 1/4 28 1/2 1 17 3/4 28 1/4 10 3/8 5 8 31 1/2
Figure 1. Fireplace dimensions (Tolerance ± ").
XG0140 - 120611.1
Page 5
H-Series DL Indoor Gas Fireplace
.
Installation
Section 2: Framing
1). Frame in the enclosure for the unit with framing materials. The
framed opening for the assembled replaces are as shown below, see Figure 2
NOTE: When constructing the framed opening, please ensure there is access to install the gas line when the unit is installed. See Figure 26.
Q”
H34DL*
H38DL*
H42DL*
Figure 2. Framing dimensions for Straight wall and Corner Installation.
.
0" clearance to corners only
M”
N”
P”
N”
(When sheetrock is not used behind the replace, framing depth "O" may be reduced by 5/8".)
L M N O P Q S T
37 1/4 33 3/4 17 7/8 52 3/8 37 31 41
25
3
40 1/4 37 3/4 18 7/8 57 1/2 40 5/8 34 44
27
/4
1
44 1/4 42 19 3/8 63 3/4 45 1/8 38 48
31
/2
Combustible Shelf
min.
2”
18”
max.
9”
Combustible Header
Exterior Wall
Min. 96”
L
min.
max.
2”
18”
Rear Vent
Top Vent
Min 1”
Ceiling level
Non-Combustible materials. Alcove over fireplace.
Non-combustible header
Non-combustible Facing materials
3”
12”
door opening
Floor
Figure 5. Non Combustible Framing for Top Vent or Rear Vent, with Alcove ABOVE FIREPLACE.
O”
Clearances
When installing a shelf over the top of the replaces, the following guidelines must be adhered to:
For Rear Vent applications, the minimum clearance is 2" from the rear of the replace to a wall, or any combustible materials, and 9" clearance from the top of the replace to the underside of any combustible shelf materials.
For Top Vent applications, the minimum clearance is 2" from the rear of the replace to a wall, or any combustible materials, and 17 1/2" to the underside of any combustible shelf materials, Figure 4.
For Top or Rear Vent applications where the Minimum mantel height is required above the replace, (for an alcove or low prole shelf), ALL Materials MUST BE NON-COMBUSTIBLE, Figure 5. The minimum clearance is 2" from the rear of the replace to a wall, or any combustible materials. 1” clearance is maintained on sides and bottom of vent runs and 2” above horizontal vent runs to any combustible material.
The replace clearances are shown below:
L
Exterior Wall
S
Figure 3. Combustible Framing for shelves over the replace, Rear vent.
17 1/2”
See Vent Graph for minimum measurement requirements gures
11, 12 or 13.
PEL Shor t 90° elbow
L
Exterior Wall
2” min.
Figure 4. Combustible Framing for shelves over the replace, Top vent.
Page 6
M
Combustible Shelf
Combustible Header
M
MODEL
Top -
Rear Vent
Top -
Top Vent
Rear
Sides
Floor
H*DL* 9 17 1/2 2 1 0 4
Installing The Standoffs
To avoid elevated mantel temperatures, all H*DL*- Series gas replaces are required to have the supplied standoffs installed.
The replace is supplied with two standoffs. Bend and install these standoffs on top of the replace ensuring that the height of the standoff maintains a 6" clearance.
Figure 6. Installing the standoff's.
6"
XG0140 - 120611.1
Mantel
Section 3: Venting
H-Series DL Gas Fireplace
Installation
Montigo supplies a variety of direct venting and termination options.
The direct vent termination location MUST be selected such that it is the highest point in the venting assembly. It should also be
selected such that it provides the shortest vent run possible. Should it be impossible to ensure that the termination is the highest point or to meet the venting guidelines laid out below please contact your Montigo dealer to discuss power venting options.
NOTES FOR PLANNING VENTING:
 H34DL* replace is certied for use with Montigo 4"/7"
venting components.
 H38DL* and H42DL* replaces are certied for use with
5"/8" venting components.
 Venting originates from the unit through the top or through
the rear.
 Venting can terminate through the roof or through an
exterior wall.
 Refer to Appendix A - Termination Locations to ensure the
planned termination location is acceptable.
 Once the termination location has been established, refer
to the appropriate section below for installation details
 All replaces shipped from the factory are Top vent.
.
Section 3-1: CONVERTING TO REAR VENT
NOTE: H42DLL* Propane models MUST be installed in a top vent
application ONLY.
Use the following instructions to convert an H*DL* for Rear Vent use:
1. Remove the Rear ue cover and gasket (4/5" and 7/8") on the ue outlet, as shown in Figure 7.
2. Next, Remove the Top ue collar's (4/5" and 7/8") on the ue outlet, as shown in Figure 7.
3. Install the (removed) Rear ue cover and gasket material, to the Top vent outlet. Fasten the cover with included hardware, as illustrated Figure 7a.
4” Inner Flue Collar, H34DL 5” Inner Flue Collar, H38DL & H42DL
7” Outer Flue Collar, H34DL 8” Outer Flue Collar, H38DL & H42DL
Flue Gasket
Flue Cover Plate
Figure 7. Flue cover and collar removal, Top Vented replace.
4. Install the (4/5" and 7/8") collars to the rear vent outlet using the included hardware, as illustrated Figure 7a.
Flue Cover Plate
Flue Gasket
7” Outer Flue Collar, H34DL 8” Outer Flue Collar, H38DL & H42DL
4” Inner Flue Collar, H34DL 5” Inner Flue Collar, H38DL & H42DL
Figure 7a. Flue cover and collar installation, Rear Vented replace.
XG0140 - 120611.1
Page 7
H-Series DL Indoor Gas Fireplace
3
Installation
Section 3-2: INSTALLING A ROOF MOUNTED DIRECT VENT
TERMINATION (MVTK-1SS / PVTK-1SS) This section applies to installations where the direct vent termination will be roof mounted.
Section 3-2-1: VENTING LAYOUT
Selection of components and details of venting lay out should adhere to the following guidelines:
32’ max.
PVTK1
MVTK-1 / PVTK-1 Termination
Termination
Obstacle
2’ min.
Support ring
Support plate
 The maximum termination point is 32’ above the replace (NOTE:
if the maximum termination height is used, the ame pattern may be affected).
 The Vertical termination must be a minimum 2’ higher than where
the termination exits the roong materials, (asphalt shingles, cedar shakes, etc). This distance should be measured from the high side of the roof slope where the ue ashing intersects the roong materials. (see Figures 8 to 8c).
 Termination location must be a minimum 6’ from a mechanical
air inlet.
 Termination location must be a minimum 18” from a parapet wall.  For a more detailed diagram of allowed termination locations,
see Appendix A.
 A maximum of two offsets (each offset is made up of 2-90°
bends) may be made.
 Firestops must be installed as required by national & local codes.  Ensure all runs are supported with a minimum of 3 supports
per 10’ of venting.
 Install all roof ashing and storm collars as shown.
Roof mounted Terminations
The following details are some possible congurations for Roof mounted terminations. See below.
Firestop
Figure 8a. Top vent, Roof mounted with 1 offset (1 offset= two 90° bends).
MVTK-1 / PVTK-1
PVTK1
Termination
Termination
2’ min.
Support straps or support plate & ring
Firestop
MVTK-1 / PVTK-1
PVTK1
Termination
Termination
32’ max.
Figure 8. Top vent, Roof mounted termination with no offset in vent run.
Page 8
2’ min.
Support ring
Support plate
Firestop
2’ max
Obstacle
2’
Figure 8b. Top vent, Roof mounted with 2 offsets (1 offset= two 90° bends).
Support plate & ring
Firestop
Firestop
XG0140 - 120611.1
P
MVTK-1 / PVTK-1
VTK1
Termination
Termination
H-Series DL Gas Fireplace
Installation
MEXT/PEXT Sections
Support plate
Support ring
18”
Max.
Figure 8c. Rear vent, Roof mounted venting (1 = 90° bend).
32’ max
XG0140 - 120611.1
Page 9
H-Series DL Indoor Gas Fireplace
Installation
Section 3-3: INSTALLING A WALL MOUNTED DIRECT VENT
TERMINATION This section applies to installations where the direct vent termi­nation will be wall mounted.
1). Installation of Termination with built in frame
A Termination with a Built-In Frame is installed during framing of a structure.
1. Frame the termination opening to 11" x 11".
2. Install exterior sheathing to the structure framing.
3. Fasten the termination to the sheathing using a minimum of 4 screws.
11”
Framing
Exterior Sheathing
1”
Figure 9. Installing a PTO-F termination.
Fastening Hardware, minimum 4-screws
PTO-4F (5"/8") Termination
2). Installation of termination frame at time of framing
Terminations with a MSR frame allow the installation of the frame prior to installation of the termination.
1. Frame the termination opening to 12" x 12".
2. Secure the MSR Frame to the exterior sheathing of the structure.
3. Fasten the termination to the MSR Frame using a minimum of 4 screws.
2”
Framing
1
MSR Frame
4). Installation of termination from inside structure
A Termination with a MOSR Frame is installed from the inside of the structure. These are commonly used in high-rise construction.
MOSR Frame
PTO-4 (5"/8") Termination
Fastening Hardware, minimum 4-screws
Figure 9c. Installing a PTO termination with the MOSR frame.
12”
Framing, con­crete or other materials
12”
Exterior Sheath­ing, concrete or other materials
1. Frame the MOSR opening to 12" x 12".
2. Fasten the MOSR frame to the interior side of the studs, concrete, or nished wall construction using a minimum of 4 screws.
3. Insert the termination into the MOSR frame as shown here, (from the inside) and attach to the MOSR by installing a min. quantity of 4 bolts into the threaded nuts on the MOSR Frame.
5). Installation of a termination shield for Vinyl Siding
The VSS Termination shield is installed when the exterior of a structure is clad with Vinyl siding. It is placed directly above, and on centre with the termination.
VSS Vinyl shield
PTO-4 (5"/8") Termination
Exterior Sheathing
12”
Figure 9a. Installing a PTO termination with the MSR frame.
3). Installation of termination frame at time of framing in Masonry
Terminations with a BSR frame allow the installation of the frame in masonry prior to the installation of the termination
1. Frame the BSR opening to 12" x 12".
2. Secure the BSR Frame to the exterior sheathing of the structure.
3. Fasten the termination to the BSR Frame using a minimum of 4 screws.
2”
Framing
Exterior Sheathing
12”
Figure 9b. Installing a PTO termination with the BSR frame.
1
Page 10
BSR Frame
Fastening Hardware, minimum 4-screws
PTO-4 (5"/8") Termination
Fastening Hardware, minimum 4-screws
PTO-4 (5"/8") Termination
Exterior Vinyl siding
Figure 9d. Installing the VSS Vinyl Shield.
Installing Heat Guards over Terminations is recommended
in installations where the termination is located within 7' feet above grade, or above a pedestrian walkway, and may be Required by code
in Public areas.
PTKOG (5"/8")
Figure 10. Installing a PTO termination heat guard.
1. Ensure that the two long mounting brackets are facing the bottom of the termination. (See inset). This will provide more heat protection at the top of the termination, where temperatures are highest.
2. Attach to the faceplate of the termination using four sheet metal screws.
XG0140 - 120611.1
Installation
Section 3-3-1: VENTING LAYOUT: Wall mounted termination.
H-Series DL Gas Fireplace
Selection of components and details of venting layout should adhere to the following guidelines:
 Vent terminations must not be recessed in walls or siding.  For Heat Shield Requirements see Section 3-3-3.  Once the proposed venting layout has been determined, refer to
Figure 11, 11a, 12, 12a, 13, 15, 16, or 17 to ensure the layout is acceptable.
Notes Wall Mounted Terminations: TOP VENT
 All measurements for vertical or horizontal runs are measured
from center of the vent pipe.
 Venting runs must fall within the limits set by the venting graphs,
Figure 11, 12 or 13.
The Venting Graph:
Measure the vertical height from the replace hearth to the centre of the termination and the horizontal run from the replace ue collar to the wall ange of the termination. Plot on the Venting Graph Figure 11, 12, or 13 with an 'X'.
If the 'X' falls on or above the top boundary of the shaded area, the installation is acceptable.
Example A: (Acceptable Installation)
If the vertical dimension from the hearth is 114" and the horizontal run to the wall ange of the vent termination is 144", this would be an accept­able installation.
Example B: (Unacceptable Installation)
If the vertical dimension from the hearth is 42" and the horizontal run to the wall ange of the vent termination is 90", this would NOT be an
acceptable installation.
Example C: (Unacceptable Installation)
If the vertical dimension from the oor of the replace is 66" and the hori­zontal run to the wall ange of the vent termination is 150", this would
NOT be an acceptable installation.
Acceptable vent run within non-shaded area.
A
C
B
Unacceptable vent run
38”
If your installation does not fall
72
within the venting graph parameters, please contact a local Montigo dealer for Power Venting options.
within shaded area.
Figure 11a H34DLN* Top Vent Venting Graph for wall mounted terminations, See Figures 14, 14a, or 14b.
Acceptable vent run within non-shaded area.
A
C
B
Unacceptable vent run within shaded area.
36
42”
If your installation does not fall within the venting graph parameters, please contact a local Montigo dealer for Power Venting options.
Figure 12 H38DLL* Top Vent Venting Graph for wall mounted terminations, See Figures 14, 14a, or 14b.
Acceptable vent run within non-shaded area.
B
36
38”
If your installation does not fall within the venting graph parameters, please contact a local Montigo dealer for Power Venting options.
Figure 11 H34DLL* Top Vent Venting Graph for wall mounted terminations, See Figures 14, 14a, or 14b.
XG0140 - 120611.1
A
C
Unacceptable vent run within shaded area.
Acceptable vent run within non-shaded area.
A
C
B
Unacceptable vent run
42”
If your installation does not fall
72
within the venting graph parameters, please contact a local Montigo dealer for Power Venting options.
within shaded area.
Figure 12a H38DLN* Top Vent Venting Graph for wall mounted terminations, See Figures 14, 14a, or 14b.
Page 11
Loading...
+ 25 hidden pages