Electric Screen
Operation Manual
1.Installation the metal dram of screen on the wall or ceiling.
Wall Installation
Let the screw get into
the hanging hole as
shown in Picture
(1) (2)
Fixing wall bracket
(Special brackets are
suggested.)as shown
in Picture
(3)
Ceiling Installation
Hook the D-shape hook
on the iron hook on the
ceiling as shown in
Picture
(4)
Covcring
Adequatc space for covering the
screen as shown in Picture
2.Unfasten the belt and connect the electric screen to electric power supply.
3.Stretching out projector screen. Press DOWN key of the switch or remote control and the
screen will automatically stretch down.
4.Rolling back projector screen. Press UP key of the switch or remote control and the screen will
automatically roll up into the metal dram.
5.Stopping projector screen. Press STOP key of the switch or remote control and it can be
stopped at any position.
Notice:
(1)The switch should be positioned at STOP when the screen is not in use.
(2)Before rolling back the screen, please make sure that there is no insect, dust or other object
on the screen.
(3)The screen can be rolled up and down continually, but continuous time of rolling up and down
should not exceed 5 minutes to prevent overheat of the motor. In case of continuous use
necessary, you should wait until the motor cools down.