Monogram ZUGPP2, ZUGSS2 Installation Manual

ZUGPP2 and ZUGSS2 Trim Kit
Stainless Steel Unified Grille Panel
Installation Instructions
Tools and materials Required:
• #1 and #2 Phillips screwdrivers
• Gloves to protect against sharp edges
Parts List:
A. Stainless steel unified grille panel B. Foam spacer pads C. 10 Black #8-32 x 3/8” screws
This kit provides for the installation of a stainless steel unified grille panel. The panel will span the combined width
of a side-by-side installation.
Completion Time: Allow approximately 2 hours to install this kit.
IMPORTANT: 2 People are required to install this kit. Disconnect power before you begin.
THE INSTALLATION SPACE
• The installation space must be 71-1/2" wide.
• The water and electrical locations for each product must be located as shown.
• A separate 115V, 60Hz., 15 or 20 amp power supply is recommended for each product.
A
B
C
Note: Additional cutout width may be required when side panels are used. Add side panel thickness to the finished cutout to calculate rough-in width.
71-1/2" Finished Width
Wall View
Electrical
24-3/16"
9"
Electrical
Area
24" Minimum Cutout Depth
75-1/2" From
Floor to Bottom
of Electrical Area
84-1/2" max.
83-1/2" min.
Finished Opening
3-1/2"
3-1/2"
3-1/2" 3-1/2"
3-1/2"
3-1/2"
3-1/2"
3-1/2"3-1/2"3-1/2"
5"
5"
5" 5"
Cold Water
Supply
Cold Water
Supply
9"
5-1/2"
5-1/2"
2-5/16"
2
STEP 2 INSTALL ANTI-TIP BRACKET
BOTTOM FREEZER MODELS ONLY
WARNING: ANTI-TIP PRECAUTIONS
These refrigerators are top-heavy and must be secured to prevent the possibility of tipping forward.
ATTENTION : PRECAUTIONS CONTRE
LES BASCULEMENTS
Le réfrigérateur est beaucoup plus lourd en haut et il faut le maintenir en place pour éviter la possibilité de son basculement vers l’avant.
• Cut a 2"x4" block 71" long. Secure the 2"x4" to the 4 mounting brackets provided using #12 or #14 wood screws.
• Secure the brackets with wood block to the back wall so that it is 84" (or your installation height) from the finished floor. Use #12 or #14 wood screws. See illustration.
• Screws must penetrate at least one inch into vertical wall studs.
• Gently push refrigerator into the opening with hands against front corners.
Note: When the refrigerators are installed under a soffit, or if there is not enough height for this method of security, brackets cannot be used. Proceed to “Level the Refrigerator” and to “Secure side trim to cabinetry.”
The refrigerators must be secured to prevent tipping.
STEP 1 INSTALL FOAM SPACER PADS
CAUTION: Handle parts with care to
avoid scratching.
PRUDENCE : Manipulez les pièces
soigneusement pour éviter de les rayer.
Apply the supplied foam spacer pads (B) to the mating side of one product as shown.
(Bottom–Mount and All Refrigerator/All Freezer Models)
Foam Spacer Pads
Brackets Required
Block
Height
From Floor
to Bottom
of Wood
Block
Soffit
Brackets
Not Required
Beneath a Soffit
Side View
2 x 4 Cut to 35
" Length
Mounting Bracket
Installation
Height
From Floor
Wood Screws Mounted into Vertical Wood Studs
3
STEP 2 INSTALL ANTI-TIP BRACKET
ALL REFRIGERATOR, ALL FREEZER “X” MODELS ONLY
WARNING: ANTI-TIP PRECAUTIONS
The unit is top-heavy and must be secured to prevent the possibility of tipping forward.
ATTENTION : PRECAUTIONS CONTRE
LES BASCULEMENTS
L’appareil ménager est beaucoup plus lourd en haut et il faut le maintenir en place pour éviter la possibilité de son basculement vers l’avant.
• The kit supplied with the unit contains 3 (2 required, 1 extra) lag bolts and 5 (4 required, 1 extra) toggles with bolts. The wall bracket will be attached to the wall in 4 places.
• Measure the opening where the unit is to be installed. Mark the center with a vertical line.
• Measure up 81-1/2" from the floor. Mark this point on the wall.
• Using a level, draw a horizontal line on the wall at this height.
• Locate at least 2 studs on the back wall. Mark these points on the horizontal line.
• Place the bottom of the wall bracket with tabs on the horizontal line. Align the center notch on the bracket with the center line on the wall.
• The anti-tip wall bracket has a series of holes. Select 2 holes that match with the located studs. Make sure the holes selected are on the center of the studs. Mark the wall at these points.
• Mark an additional hole at each end of the bracket. If one of the studs is closer to the end of the bracket, mark an additional hole towards the center of the bracket.
• Drill 1/2" holes into the wallboard at the locations marked for the toggles to be mounted (not the stud markings).
• Drill 3/16" holes into wooden studs where marked. If steel stud construction, drill 1/2" holes into the studs where marked. You will use 2 toggles with the metal studs.
Line on Wall
Center
81-1/2"
To Floor
Center
Wall Bracket
Line on Wall
Wall Studs
Two Additional
Hole Locations at
Ends of Brackets
Loading...
+ 5 hidden pages