Molift Molift Air 350 QUICK GUIDE

Page 1
Molift Air 200 / 350
Quick guide
QG16601 Rev. A 2020-10-29
Hoist components:
1. Trolley
2. Hoist
3. Side covers
4. Emergency stop/ Emergency lowering
6. Quick release pin
7. Hand control
8. Sling bar
4
5
6
General information:
Lift and transfer of a client will always pose a certain risk and only trained personnel are allowed to use the equipment and accessories covered by this user manual. The rail system must be installed by certified personnel in accordance with applicable installation instructions. The lifter is not intended to be operated by the client being lifted.
1
2
3
7
8
Battery / Charger indicator:
Wrench symbol / Service indicator
Battery symbol / Battery indicator
Only certified personnel are allowed to open hoist or accessories to perform service or repair.
Read User Manual before use! This Quick guide does not replace User Manual. It is important to fully understand the content of the user manual before attempting to use the equipment.
Charger indicator Mode
Green flash Not connected to hoist Yellow Charging Yellow flash Top of charge Green Fully charged
The Hand control has 2 buttons for lifting and lowering, or 4 buttons if the hoist is equipped with propulsion. The Hand control has an indicator light that will illu­minate when battery level is low and the lifter requires charging
Page 2
Lifter installation on trolley in rail
Connect one point first. Push button all the way in, and place lifter in connection point on trolley. Release button and make sure it is clearly showing green before connecting the next point.
Make sure both connection point buttons completely return and clearly show green after installation. Emergency lowering cord and tube can be adjusted to the correct length (height) by cutting tube and cord.
Emergency stop
Pull to activate emer­gency stop. The button will come out, and hoist will stop.
Push with finger or use tube on cord to push button back in to reset emergency stop.
Electrical emergency lowering
Pull and hold to start lowering. Hold until client is lowered and can be released from sling ba r.
Use this checklist to verify that the hoist is properly installed and can operate correctly and safely before use.
End stops on rail are installed after mounting of trolley
as described in BM4401
Make sure that the hoist is properly fastened to the rail
and that the lift does not have any loose parts.
Perform one lift with load (60-80 kg) Make sure battery is fully charged.
Mounting suspension
1
2
3 4
Only for emergency use when hand control does not work!
Lifting and lowering
The sling bars hook design prevents sling to be inadvertently detached when mounted correct.
1. Align sling bar in connection point.
2. Push button on locking pin and insert all the way through.
3. Make sure locking pin is properly fastened
4. Push and hold down the button on the locking pin, and
pull to remove locking pin.
Loading...