Moffat Pty Limited Moffat Pty Limited
740 Springvale Road 3/142 James Ruse Drive, Rose Hill
Mulgrave, Melbourne PO Box 913, Smithfield
Victoria 3171 Sydney, N.S.W. 2142
Ph: (03) 9518 3888 Ph: (02) 8833 4111
Fax: (03) 9518 3838 Fax: (02) 8833 4133
Western Australia
Moffat Pty Limited Moffat Pty Limited
67 Howe Street 30 Prosperity Place
Osbourne Park Geebung, Brisbane
WA 6017 Queensland 4034
Ph: (08) 9202 6820 Ph: (07) 3630 8600
Fax: (08) 9202 6836 Fax (07) 3630 8623
Auckland
New South Wales
Queensland
The reproduction or copying of any part of this manual by any means whatsoever is strictly forbidden unless authorized previously in
writing by the manufacturer.
In line with policy to continually develop and improve its products, Moffat Ltd. reserves the right to change the specifications and
design without prior notice.
Service Agent ................................................................................................................................................
1
Introduction
We are confident that you will be delighted with your E89M/MS PROVER / HOLDING CABINET, and it will
become a most valued appliance in your commercial kitchen.
A new oven can seem very complex and confusing at first glance. To ensure you receive the utmost
benefit from your new Prover, there are two important things you can do.
Firstly
Please read the instruction book carefully and follow the directions given. The time taken will be well
spent.
Secondly
If you are unsure of any aspect of the installation, instructions or performance of your prover, contact your
E89M/MS dealer promptly. In many cases a phone call could answer your question.
2
Installation
Installation Requirements
It is most important that this prover / holding cabinet is installed correctly and that
operation is correct before use.
Installation shall comply with local electrical, health and safety requirements.
Before Connection to Power Supply
• Remove all packing.
• Check equipment and parts for damage. Report any damage immediately to the carrier and
distributor.
• Remove protective plastic coating from the side panels.
• Check that the available power supply is correct to that shown on the rating plate located on the
right-hand side panel.
• To ensure correct ventilation for the and controls the following minimum installation
clearances are to be adhered to:
Rear 0 mm / 0 ”
Left-hand side 0 mm / 0 ”
Right-hand side 25 mm / 1 ”
Electrical Connection
• E89M/MS provers are supplied fitted with cords. Ensure unit is fitted with correct cord and plug.
• To access the electrical connection terminal block, grounding lug and strain relief, remove the
right hand side panel.
WARNING - THIS APPLIANCE MUST BE EARTHED / GROUNDED
Water Connection (Auto Fill Models Only)
• A cold water supply should be fitted to the water inlet which is located near the rear of the right
hand side of the unit.
• A connection elbow and sealing washer is supplied with this unit for direct connection of a ½” ID
hose, and is recommended for easy installation and service.
• Connect water supply - Max inlet pressure 550kPa / 80psi.
• Turn on water supply to check for leaks.
Rack Width
• The E89 prover has been designed to accept either 460mm (18”) or 405mm (16”) wide trays or 1/1
• The prover comes factory set for 460mm (18”) trays, a rack spacer kit (Part no. 025685) is
1
GN,
/2 /1 GN trays.
required to change to 405mm (16”) trays or Gastronorm pans.
3
Installation
Stacking with Convection Oven
• The E89M/MS prover is supplied standard for stand alone use.
• Optionally, the E89M/MS prover can be double stacked, or combined underneath a TURBOFAN
E32M/MS convection oven as a complete unit. For this a stacking kit is required.
• For installation of the stacking kit, refer to the instructions provided with the kit.