Moen 2200, 2400 User Manual

MODELS 2200, 2400 & 72200 SERIES
TUB AND SHOWER VALVES
All models have 4 port castings. Stops are optional on all models. All models are also available for 1/2 inch I.P.S. pipes
or 1/2 inch copper sweat connections to copper water tubing. The 2400 series include built in pushbutton diverter.
MT659C
®
INSTALLATION INSTRUCTIONS
THESE INSTRUCTIONS MUST BE
LEFT WITH HOMEOWNER
These are shown in the drawings. The depth measurement is critical. Use the front face of the plaster ground as a reference point for the finished wall position, including tile (2-1/16" [51mm]). The center line of the supply and
discharge piping should be a maximum of 2-3/16" (56mm) and a minimum of 1-7/16" (37mm) behind the finished wall surface.
HANDLE
COVER
UP
UP
PUSH BUTTON DIVERTER
O-RING
HANDLE
SCREW
2400 MODEL SERIES
MODEL ILLUSTRATED
HANDLE
KNOB
ESCUTCHEON
WASHER
PLASTER GROUND
WALL LINE
2-1/16"
(52mm)
FLOOR
ALL DIMENSIONS NOMINAL
IMPORTANT: SEE FLUSHING INSTRUCTIONS PAGE 2
UP
1-1/4"
(32mm)
SUPPLY 1/2" I.P.S. OR
COPPER SWEAT
CAUTION: USE 1/2" IRON
PIPE SIZE MINIMUM. DO NOT USE 1/2" TUBING, EXCEPT WHEN SLIP FIT SPOUT IS USED.
COMBINATION
MODELS 32"
(813mm)
SHOWER
45"
(1143mm)
48"
(1219mm)
6'6"
(1981mm)
Always turn water off before disassembling the valve. Open valve handle to
CAUTION:
Before turning water on during either rough-in or trim-out, make sure that cartridge retainer clip is in place. The cartridge and retainer clip were properly installed and tested before leaving the factory. Although it is unlikely, it is nevertheless possible that through the handling of the valve by any number of persons the retainer clip may not be properly installed. This should be carefully checked at time of rough-in and trim-out. If the retainer clip is not properly installed, water pressure could force the cartridge out of the casting. Personal injury or water damage to the premises could result.
alleviate water pressure to insure that complete water shut-off has been accomplished.
CLIP
EAR
WITHOUT STOPS WITH STOPS
SUPPLY
Stop Operation
7" DIA
(178mm)
SHOWER
TUB
2" CC
(51mm)
2-3/16" IPS
(56mm)
SUPPLY
RUBBER STOP VALVE
(WITH SCREWDRIVER SLOT)
SUPPLY
4-5/8" FOR C.C.
6" FOR I.P.S.
7" DIA
(178mm)
SHOWER
TUB
2-1/8" CC
(54mm)
3-3/4" IPS
(95mm)
(117mm)
(152mm)
SUPPLY
5-1/2"
(140mm)
PLASTER GROUND
SIZE AND WALL
OPENING
CC - This type is integral with casting, actuated by screwdriver, and require a 90° turn to open or close. When the screwdriver slot is vertical, the rubber stop is closed, and when the slot is horizontal, the rubber stop is open.
IPS - This type has been added to the basic shower casting and is actuated by screwdriver. The stop is opened by rotating in a counterclockwise direction until it stops and closed by rotating in a clockwise direction until it bottoms.
To Rough-in Body Casting
MAKE SURE ALL WATER SUPPLIES ARE OFF.
Note the "UP" arrow on the casting. Install with the arrow UP. If the valve is to be used for a Shower only, plug the bottom outlet with a pipe plug. If the valve is to be used as a Tub Filler only, put the pipe plug in the top outlet. If the valve is to be used for both a Shower and a Tub, connect the top outlet to the shower, using either 1/2 inch iron pipe size, or 1/2 inch copper water tube. Connect the bottom outlet to the tub spout using 1/2 inch iron pipe size. 1/2 inch copper water tube can be used with the Moen Slip Fit Spout.
WARNING: Secure all pipes and the shower and tub drop ells. Use Teflon tape on all threads. Use a plain ell on the tub drop. A twin ell is not needed. Check system for leaks before closing wall.
(Built in diverter models will use a tub filler spout while all other models will use diverter tub spouts.)
These valves are equipped with Moen's long life 1225 cartridge, designed for smooth, trouble free operation. When soldering, do not heat valve any higher than neces­sary to flow the solder. Overheating may damage the cartridge or rub­ber stop valves. Following this di­rection will allow you to solder with­out removing the cartridge or rub­ber stop valves. WARNING: The cartridge and rub­ber stop valves MUST be removed before either brazing or resistance
CAUTION
(electric) soldering.
Flushing
IMPORTANT: Before closing all wall openings, pressure test valve and complete system for leaks using flushing instructions
IMPORTANT:
Pipe chips, sand, stones, and other solids found in new or renovated plumbing can damage the sealing surface of the faucet cartridge and cause a leak.
To avoid damage, DO NOT OPERATE VALVE until you have followed these instructions:
1. After installing and connecting your new faucet, install shower arm but not showerhead before flushing.
2. Turn the valve on in the full cold position (handle pointing to the right) and turn on the cold supply for 15 seconds. Without closing the valve, turn to the full hot position (handle pointing to the left) and turn on the hot supply for 15 seconds.
3. Turn the valve to the mixed position, divert water to the shower and run for an additional 15 seconds.
4. Turn off the water and check for leaks.
5. Install showerhead.
MT659C
Loading...
+ 2 hidden pages